Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.

Slides:



Advertisements
Similar presentations
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Advertisements

The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Engineering Services Department of Public Utilities.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Pavement Distresses Flexible Pavement
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
2014 Budget Department Presentations Infrastructure Funding Options.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Composite Pavements National Pooled Fund TPF-5(149) Task 1 Update Mihai Marasteanu.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
Concrete Pavements The Right Tool for The Right Job.
COLLIN COUNTY A County Government and Transportation Overview Ruben E. Delgado, PE Director of Engineering A County Government and Transportation Overview.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force May 15,2007 Pavement Management Report Financing Plan Presenter:
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
Public Hearing August 11, :00 pm. On May 3, 2011, the West Bountiful City Council adopted a balanced tentative budget maintaining current service.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
Douglas County Road Maintenance Funding June 27, 2011.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Public Works Department FY Budget Challenges February 16, 2010.
MEC’S BLUEPRINT MISSISSIPPI LONG-TERM TRANSPORTATION/ INFRASTRUCTURE PLAN.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
CITY OF FLAGSTAFF – PROP. 406 ROAD REPAIR AND STREET SAFETY 1.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
City of Longview Pavement Preservation Program City Council Workshop February 2, 2012 Jeff Cameron, Public Works Director Josh Johnson, Street/Stormwater.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Proposed Utility Line and Pavement Replacement Process Proposed Utility Line and Pavement Replacement Process Pre-Council June 28, 2016 Presented by: Transportation.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
2016 Mill and Overlay Project
Transportation Development District Presentation
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Multi-Year Programming and Predictive Modelling
Town of Clayton 2016 Pavement Condition Survey
Infrastructure Investment Needs
Street Improvement Plan
Pavement condition index calculation
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2017
Town Council Strategic Planning Session
Funding the Transportation Infrastructure Improvement Plan (IIP): A Discussion of Cash Flows Town Council Meeting February 15, 2017.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation

Street Maintenance History – Street Maintenance Fee implemented December 2000 – Quarter cent sales tax approved by voters in 2002, 2006, and 2010 – Applied Research Associates was contracted to survey the City of Arlington in June of 2005 – The Pavement Management System was implemented in 2006

Street Maintenance Responsibilities City Streets – 3,015 LM TxDOT – 427 LM IH20 – 54 LM IH30 – 42 LM FM157 – 66 LM SH287 – 97 LM SH360 – 92 LM SPUR303 – 38 LM SH180 – 38 LM Private Streets – 257 LM

Current Resources Street Bonds Street Maintenance Sales Tax Street Maintenance General Fund Water Utilities Roadway Impact Fees CDBG Funds Tarrant County

Maintenance Techniques Cost per Lane Mile Crack Seal$ 16,000 Microseal$ 21,000 Concrete Panel Replacement$ 32 – 42,000 Mill and Overlay$ 54,000 Heater Repaver$ 96,000 Reclamation$ 184,000 Rebuild Asphalt$ 415,000 Rebuild Concrete Residential$ 551,000 Rebuild Concrete Arterial$1,000,000 Water Utility Adjustments $ Varies

Maintenance Repair and Rehabilitation Plan OCIPavement TypeActivity 0 – 49.99AC (Asphalt)Rebuild 50 – 64.99AC (Asphalt)Reclamation 65 – 79.99AC (Asphalt)Mill & Overlay 80 – 89.99AC (Asphalt)Crack Seal 90 – 100AC (Asphalt)DO NOTHING 0 – 49.99PCC (concrete)Rebuild 50 – 69.99PCC (concrete)10% Slab replacement 70 – 89.99PCC (concrete)Slab maintenance 90 – 100PCC (concrete)DO NOTHING Previous Plan Poor0 – Good70 – Excellent Current Plan Poor0 – Good50 – Excellent

Current Assessment Process 50 year design standard for new construction Pavement assessment every three years Ratings based on ride and pavement distress CarteGraph Pavement Management System

$1.5 Billion Street Network 50 year design standard for new construction – old design life was 20 to 25 years 50 year life requires a 2% maintenance Investment each year - $30,000,000 Street Aging Model

Life Cycle of a Street

Network Assessment Network OCI ,015 Existing Lane Miles – 1,039 lane miles on Thoroughfare Development Plan – 1,976 lane miles of residential streets – 243 thoroughfare lane miles to be constructed

Streets with OCI < 50 Streets with OCI of less than 50

Original Plan “Do Best First” Target OCI - 95 Rebuild - 70 Current Goal – Network Average OCI 70

Do Worst First vs Do Best First Do Best First Keep the good streets good Do Worst First Make a tangible impact on the City’s worst streets

Reconstruct Failing Streets Start with reconstruction of poor streets and then move to good streets until budget is exhausted Focus on maintenance after eight years Lane Miles Maintained To Achieve Target OCI Current Lane Miles OCI

Future Approach Adjust the MR&R plan from rebuild at 70 OCI to rebuild at 50 OCI Modify the Target Network OCI from 95 to 70 Adopt a maintenance plan which focuses on failing streets: Do Worst First Adopt a budget which maintains a Network OCI of between 60 to 70 over 20 years: $40M per year beginning 2015 Rebuild versus capacity 2014 Bond Election Focus rebuild priority on TDP versus residential streets

Questions