ILC/SRF R&D Robert Kephart. 9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design.

Slides:



Advertisements
Similar presentations
FNAL Superconducting RF Program Sergei Nagaitsev.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.
DOE Budget Briefing ILC/SRF B&R Codes Bob Kephart Page 1 Slides extracted from Feb 18 OHEP talk.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
Elements of a Bid to host the ILC in the U.S. R. Kephart (+ H Padamsee )
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
F ILC Accelerator R&D and AAR&D at NML Sergei Nagaitsev FRA Visiting Committee Review April 20/
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
SRF Infrastructure at Fermilab (and more) Rich Stanek Engineer’s Week February 15, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
ILC R&D Board Meeting: SRF Cavities Status and Plans
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
ILC Cavity & Cryomodule Overview
ILC Global Design Effort
Industrialization Activities in the Americas
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

ILC/SRF R&D Robert Kephart

9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design Main Linac design –Accelerator physics –Main Linac components (Cryomodule, RF components) ILC/SRF R&D and Infrastructure –Cavity fabrication and processing –Cavity test –3.9 GHz effort –Cryomodule fabrication and test ILC Civil and Site Development Industrialization Resources Summary of FY07 accomplishments FY08 Goals Conclusion

9/25/2007 R.D. Kephart DOE Annual Review 3 Goals of Fermilab’s ILC R&D The overarching goals of Fermilab’s ILC R&D: –Establish credentials in ILC machine design –Develop proficiency in SRF technology –Become a trusted international partner such that FNAL becomes the preferred site to host the ILC. As part of the Global Design Effort (GDE) our goal is to help design the machine, estimate the cost, and gain international support. Fermilab ILC R&D activities: –ILC Machine Design –Development of SRF technology & infrastructure –Conventional Facility & Site Studies for a US ILC site –Industrialization & Cost Reduction –ILC Physics, Detector Design, and Detector R&D (Marcel’s talk)

9/25/2007 R.D. Kephart DOE Annual Review 4 FNAL’s Role in the GDE In FY07 the focus of the worldwide effort on the International Linear Collider (ILC) was to complete the Reference Design Report (RDR) and cost estimate –Draft delivered in Beijing in Feb 07 (Final in Korea in Aug) Fermilab’s Role: –Large institutional contribution to this activity –Many FNAL physicists and engineers involved –Increased FNAL role via GDE leadership positions Current Lab effort – 137 FTE on ILC machine design and SRF R&D and infra – 18 FTE on ILC Detector R&D Growing engagement for Lab staff & User community FNAL is poised to play an even larger role in the Engineering design of the ILC. Goal: EDR by 2010

9/25/2007 R.D. Kephart DOE Annual Review 5 FNAL’s role in the RDR/EDR Many FNAL Physicists and Engineers were in key RDR positions ILC Machine “Area” Leaders (typically 3 Ldrs 1/region) –Civil and Site: Vic Kuchler = Americas Ldr –Main Linac Design: N. Solyak = 1 of 2 Americas Ldrs –Cryomodule: H. Carter = Americas Ldr –Cryogenics system: T. Peterson = Americas Ldr –Magnet systems: J. Tompkins = Americas Ldr –Communications: E. Clements = Americas Ldr Design & Cost Board ( coordinated RDR and cost estimate) –9 member board: P Garbincius (chair), R. Kephart (member) RDR Change Control Board (ILC baseline configuration control) –9 member board S. Mishra = 1 of 3 U.S. Members R&D Board (Oversight of ILC R&D program –11 member board M. Ross (Member) –S0/S1/S2 task forces Ross, Nagaitsev, Kephart (Members) FNAL Hosts the GDE central office (admin support, etc) Nearly all have continuing roles in the Engineering Design organization M Ross = 1 of 3 Project Managers, Jim Kerby = 1 of 3 lead engineers

9/25/2007 R.D. Kephart DOE Annual Review 6 Accelerator physics: –Main Linac optics studies –End-to-end simulation of the machine –Study emittance preservation and vibration issues –RF timing and control issues FNAL proposed the switch to a centrally sited circular Damping Ring vs. TESLA dog-bone DR –Less expensive, less risk, fits on FNAL site –Now the ILC baseline Engineering Design of Main Linac technical systems –Cryogenics, RF, magnets, and controls systems –Auxiliary systems: water cooling, electrical, HVAC, etc Design of key Main Linac components –Cryomodules, cavities, modulators, etc. The ILC is based on Superconducting Radio Frequency technology. A major focus has and will be SRF R&D ILC Machine Design

9/25/2007 R.D. Kephart DOE Annual Review 7 SRF Goals Demonstrate the baseline ILC Main Linac technology –GDE S0: Cavity gradient of 35 MV/m; good yield –GDE S1: Cryomodules with average gradient > 31.5 MV/m –GDE S2: One or more ILC rf unit with ILC beam parameters Key issue is variability in cavity performance Develop FNAL expertise in SRF technology –Train FNAL staff –R&D to improve ILC performance, reduce cost Collaborate with U.S. & International ILC partners Transfer SRF technology to U.S. industry Build FNAL SRF Infrastructure to support these activities –DOE Review of FNAL SRF Infrastructure Plan in Feb 07 –Report favorable  proceeding with plan but at reduced funding

9/25/2007 R.D. Kephart DOE Annual Review 8 Surface Processing Cavity Fabrication Vertical Testing He Vessel, couplers, tuner HPR or reprocess Horizontal Testing Cold String Assembly Pass! Fail! Cavity/CM process and Testing Plan… Develop in labs then transfer technology to industry

9/25/2007 R.D. Kephart DOE Annual Review 9 SCRF Infrastructure High gradient cavities require extensive infrastructure Bare cavities –Fabrication facilities ( e.g. Electron beam welders) –Buffered Chemical Polish facilities ( BCP ) –Electro-polish facilities ( EP ) –Ultra clean H 2 0 & High Pressure Rinse systems –Vertical Test System ( Cryogenics + low power RF ) Cavity Dressing Facilities (cryostat, tuner, coupler) –Automatic welders, Class 10 clean room –Horizontal Test System ( cryo and high power pulsed RF ) String Assembly Facilities –Large class 100 clean rooms, Large fixtures –Class 10 enclosures for cavity inner connects Cryomodule test facilities –Cryogenics, pulsed RF power, LLRF, controls, shielding, etc. –Beam tests  electron source (e.g. FNPL Photo-injector) Lots of $ but reuse of existing FNAL infrastructure reduces costs

9/25/2007 R.D. Kephart DOE Annual Review GHz Cavity Fabrication Goals: –Acquire cavities to study surface processing (Qualified Vendor) –Qualify U.S. cavity vendors to make ILC cavities –Build cryomodules to train staff and test improvements Our progress depends on funding available to acquire cavities Delivered cavities (using all sources available): –4 from ACCEL (Processed and tested at Cornell, JLab) –4 from AES (Processing at Jlab, one cavity now at FNAL) –4 from Jlab ( 2 large grain, 2 fine grain) Additional cavities ordered from ACCEL (Qualified Vendor) –For ILC surface processing studies and CM construction –8 ordered in FY06, 12 more in FY07 (DESY orders at a time!) –Ability to order cavities is funding limited ( $ ~80 K each ) U.S. Vendors (trying to get them qualified) –FY07: Ordered single cell cavities from AES, Roark, Niowave –6 additional nine-cells on order from AES

9/25/2007 R.D. Kephart DOE Annual Review 11 FNAL Cavities Infrastructure ACCEL Cavity Cavity Tuning bead pull IB4 RF lab 800 C Bake IB4 Vacuum Oven

9/25/2007 R.D. Kephart DOE Annual Review 12 Cavity Fabrication By Industry Cavity Dressing & Horizontal Fermilab Surface Cornell Surface Jlab Surface ANL/FNAL Vertical Cornell Vertical Jlab Vertical FNAL Exists Developing U.S. Cavity Processing & Test ILC R&D goals require new large processing facility ~ 100/yr ~10/yr~50/yr~40/yr

9/25/2007 R.D. Kephart DOE Annual Review 13 EP and Vertical Jlab Quench at ~ 42 MV/M but back down to ~32 MV/M EP and Vertical Test at TJNL FNAL collaborates closely with Jlab on cavity processing Jlab modified existing infrastructure for Electropolish, High Pressure Rinse, and Vertical Test of ILC cavities –Capable of > 40 process and test cycles/yr –Completed 32 in FY07

9/25/2007 R.D. Kephart DOE Annual Review 14 ACCEL cavity EP Processed & tested at Cornell EP & Vertical Test: Cornell Limited by 30 MV/M Vertical EP Infrastructure HPR ( High Pressure Rinse) Vertical test New vertical EP R&D infrastructure HPR & Vertical Test of ILC cavities 3 ACCEL cavities processed # 5, 8, 9 8 process and test cycles in FY07 Gradients achieved MV/M Limited by quench

9/25/2007 R.D. Kephart DOE Annual Review 15 Cavity Process & VTS Results ACCEL (Europe) AES (U.S.) ILC Goal Most cavities, esp. U.S. cavities are limited by Quench vs. FE

9/25/2007 R.D. Kephart DOE Annual Review 16 New ANL-FNAL Processing Facility New Clean Rooms New Chemistry Rooms & EP 1 st EP Aug 07 Single cell Chemistry, Clean rooms, BCP,HPR & state-of-the-art Operational ~ Dec 07 ~ 50 EP cycles/yr

9/25/2007 R.D. Kephart DOE Annual Review 17 New Vertical FNAL Recently commissioned (IB1) –Existing 1.8 K Cryogenic plant –RF system in collaboration with Jlab –Capable of testing ~50 Cavities/yr –Evolutionary upgrades: Thermometry for 9-cells, 2 cavities at a time, 2 top plates, Cryo upgrades Plan for two additional VTS cryostats –Ultimate capacity ~ 264 cavity tests/yr VTS Cryostat:IB1 New RF & Control Room Plan for 2 more VTS pits Nine-cell Tesla-style cavity

9/25/2007 R.D. Kephart DOE Annual Review 18 Horizontal Test System Dressed cavities are tested with pulsed RF power 300 KW klystron & modulator complete and tested Extensive MDB cryo modifications  K HTS currently cold & being commissioned with 1 st cavity Serves as test bed for LLRF, tuner & coupler studies Unique capability in Americas: Goal 24 cavity tests/yr 1 st 1.3 GHz Cavity in HTS Cryostat HTS Cryostat Installed at MDB

9/25/2007 R.D. Kephart DOE Annual Review 19 MDB Infrastructure RF Power for HTS Cryogenics transfer lines in MDB Large Vacuum Pump for 2K 300 KW RF Power for HTS Capture Cavity-II

9/25/2007 R.D. Kephart DOE Annual Review 20 DESY Collaboration FNAL is building a 3.9 GHz 3 rd Harmonic module for DESY –Doubles light output of VUV-FEL –Uses four 9 cell 3.9 GHz cavities –Five cavities have been fabricated and have achieved gradient > 20 MV/M gradient (Spec is > 13 MV/M) –Serves as a pilot program for much of our ILC SCRF infrastructure (processing, vertical and horizontal test, cryomodule assembly, etc.) –Expect to deliver the 3.9 GHz module to DESY in early 2008 DESY and INFN have supplied Fermilab with all the parts for one 1.3 GHz (TTF 3+) TESLA cryomodule –Will be the 1st ILC type cryomodule built in the U.S. –More on this in a minute

9/25/2007 R.D. Kephart DOE Annual Review 21

9/25/2007 R.D. Kephart DOE Annual Review 22 ILC Cryomodule Cryomodules are complex Cavities made from pure Nb Smooth & ultra clean surfaces Cavity handling is crucial Operate in 2K superfluid He 1200 parts! Cryomodules are expensive Single most expensive component of the ILC Must industrialize cavities, components, and maybe assembly Developing the extensive infrastructure to build and test CM’s FNAL leads an international team working to improve the TESLA CM design for ILC (DESY, INFN, KEK, CERN, SLAC, India, etc ) Plan to have an improved ILC design ready for bids by Mar 08 TTF Cryomodule

9/25/2007 R.D. Kephart DOE Annual Review 23 ILC Type IV Design Coupler Cavity 2K Header and support Radiation shields 2K He Vessel Vacuum Vessel Beam Axis Design Compete In Mar 08

9/25/2007 R.D. Kephart DOE Annual Review 24 Cryomodule Assembly Facility Goal: Assemble R&D Cryomodules Where: MP9 and ICB buildings –MP9: 2500 ft 2 clean room, Class 10/100 –Cavity dressing and string assembly –ICB: final cryomodule assembly Infrastructure: –Clean Rooms, Assembly Fixtures –Clean Vacuum, gas, water & Leak Check DESY Cryomodule “kit” being assembled now String Assembly MP9 Clean Room Cavity string for 1 st CM ICB clean: Final Assembly fixtures installed

9/25/2007 R.D. Kephart DOE Annual Review 25 Cryomodule Plan 1 st Cryomodule (2007) –Assemble a TESLA TTF type III CM from DESY “kit” –Cavities built and fully tested by DESY 2 nd Cryomodule (2008) –Also TTF type III cryomodule –Cavities are processed and tested in the US –Electropolished and tested at JLAB, Cornell, and ANL/FNAL –Cryostat and cold mass from Zanon in Europe 3 rd Cryomodule (2009) –1 st type IV ILC cryomodule built anywhere –Parts built in U.S. industry 4 th -6 th Cryomodules ( ) –Build ILC RF unit in U.S. –Transfer knowledge gained to Industry Develop, build & test basic building blocks of the Main Linac to evaluate main linac cost and reliability issues

9/25/2007 R.D. Kephart DOE Annual Review 26 RF Unit Test Facility (ILCTA_NM) Overall Plan –Build an ILC RF Unit Test Facility at New Muon Lab Building (NML) One ILC RF Unit (3 Cryomodules) 10-MW RF System ILC-like Beam (3.2 MHz, Up to Hz, 300-μm rms bunch length) Phase-1 (FY07 - FY08) –Prepare Facility for Testing of First Cryomodule (CM1) without Beam Infrastructure, RF Power, controls Cryogenics (Refrigerator #1) => reuse of existing TeV refrigerator Phase-2 & 3 (FY08 - FY10) –Install Gun, Injector, CM2 and CM3, Test with Beam New RF Gun Move A0 Photo-Injector to NML and Install Test Beamlines Extend Building to fit Third Cryomodule Cryogenics (Refrigerator #2 (existing) and New Upgrade RF System to 10 MW FY11 and beyond run ILC RF unit with full ILC parameters

9/25/2007 R.D. Kephart DOE Annual Review 27 ILCTA_NM Layout MeV Injector: well characterized beam Low energy test area (e.g. 3.9 GHz Crab cavities) Twin tunnel design to allow 2 nd RF unit and to study tunnel layout and maintenance issues New bldg for diagnostics & AARD Also houses new cryo plant Bunch Compressor ILC RF unit Diagnostics Gun CC I,II Laser 3 rd har Test Area ~ 22 M 72 M Existing Building New Building New ILC like tunnel 2 nd ILC RF unit Test Areas new 300 W cryo plant RF Equipment

9/25/2007 R.D. Kephart DOE Annual Review 28 Current Picture of NML Facility

9/25/2007 R.D. Kephart DOE Annual Review 29 Refrigeration/controls, etc Cryogenic System –Installed Gas Storage Tanks –Refrigerator #1 Installation complete 1 st LHe last week ! –Cryo Distribution System Feed Can, Feed Cap, End Cap (in procurement stage) Control Room being Installed Instrumentation –Wire Position Monitors for CM1 –Faraday Cup Fabrication –RF Protection System Lots of progress… but… Concern: 300 W refrigerator is expensive + 2yr lead time item… cannot order in FY08 or FY09 ?

9/25/2007 R.D. Kephart DOE Annual Review 30 ILC Civil and Site Development With the GDE we are developing the ILC Civil Design –Tunnel Design and Layout –Convention Facilities design –Cost and Schedule studies FY08: FNAL site specific design –Optimal use of the large FNAL site –Minimize cost and community impact –Studies of actual machine layout Geological, environmental, land use, & community issues –Bring in large outside A&E firms to consult ~31 km

9/25/2007 R.D. Kephart DOE Annual Review 31 Industrialization Principle goal of ILC industrialization is to establish in U.S. industry the capability and infrastructure to mass produce the components for the ILC –Another important goal is cost reduction FY07 Activities: –Encourage & support the LCFOA (meetings, etc) –Industrial cost estimates in support of the RDR –Development of U.S. Cavity vendors ( AES, Roark, Niowave ) –Development of Industrial Electropolishing ( ABLE) –Purchase of couplers from CPI, etc. FY08: –Qualify Industry for cavities & CM parts production –Qualify new U.S. vendors of high purity Nb –Engage U.S. A&E firms in FNAL site development –Value engineering, RF equipment purchases, etc In the spring I charged a group to create an overall IC Industrialize plan (Ldrs: Garbincius, Mishra). Preliminary report in Oct, final Jan 08 Our ability to engage U.S. industry is limited by available funding, our own expertise, our SRF R&D and test facilities, and industrial level of interest

9/25/2007 R.D. Kephart DOE Annual Review 32 Resources (with overheads) FY08: ILC + SRF growth is 1.9% < inflation FY09 is better at 26% growth but still below FNAL’s understanding with OHEP –Pier: ILC line at ~ $34 M; all $ 35 M of the SRF line to FNAL –Note: The discrepancy in the SRF line may be because planned funds to SLAC, MSU, LANL are not included. However, even assuming these funds we are still missing ~ $3-4M –At least $ 7M less in FY09 than we expected

9/25/2007 R.D. Kephart DOE Annual Review 33 Resources ( Direct) FY08 is ~ flat in terms of workforce and M&S Disappointing: Does not allow us to build and operate needed SRF infrastructure in a timely way (NML refrigerator, EBW, CPF) Stagnation of Detector R&D effort instead of FNAL leading LOI’s Modest growth foreseen in FY09 guidance…but…. We should all understand that these numbers are far short of those needed to support an early (~ 2012 ) start of ILC FTE ~158~173 Note: FTE numbers are from actual effort reporting vs. SWF averages

9/25/2007 R.D. Kephart DOE Annual Review 34 Detector R&D funding The ILC detector R&D effort at the lab has nearly doubled each year. Funding in FY08 will be ~ flat. Community calls for LOI's by the end of 2008 As candidate lab to bid to host, we have the ambition to play a leading role in the preparation of the LOI's. FNAL established several core competencies, highly regarded by the world community; need to grow these Many technologies for ILC detectors are novel and have to have system level tests. We provide funding to operate the test beam and provide infrastructure for these tests. The Projected FY08 detector budget is not compatible with our ambition and the goals of the WWS.

9/25/2007 R.D. Kephart DOE Annual Review 35 Summary: FY07 Accomplishments Large contribution to GDE RDR and cost estimate Completed Meson Detector Bldg 1.8 K cryogenic system 1 st operation of the Capture Cavity II at high gradient (31 MV/M) With Jlab & Cornell –processed & tested the first >30 MV/ M cavities in the U.S. With ANL: –Completed new joint ANL/FNAL cavity processing facility Completion and first operation of a Vertical Test Stand in IB1 Completion and first operation of a Horizontal Test Stand in MDB Completed Phase I: Cryomodule Assembly Facility (MP9 & IB1) Started assembly of the 1 st U.S. built cryomodule in CAF –TTF type III CM from DESY “kit” of parts Excellent progress on a 3.9 GHz Cryomodule for DESY Started construction of RF unit test facility at NML Initiated & led a world wide collaboration on SRF materials

9/25/2007 R.D. Kephart DOE Annual Review 36 Summary: FY07 Accomplishments Conventional Facilities Development –Major contributions to ILC CFS design –Led the U.S. site specific design effort Signed MOU’s with 15 national/international ILC institutions –Many on SRF development Outreach –Community Task Force, envoy program, single page handouts, web site, etc. –Host GDE, ILC, industrialization, ILC schools, and SRF meetings Illinois –Working with Illinois Dept of Commerce and Economic Development –The Illinois Accelerator Research Center, a new $ 35 M FNAL building dedicated to education, SRF development & industrialization is in Illinois capitol bill that awaits passage Program Management –Extensive financial tracking tools in place for ILC/SRF effort –Started to develop EDR schedules and trackable R&D milestones

9/25/2007 R.D. Kephart DOE Annual Review 37 Conclusions In FY07 made major contributions to the RDR –Large role in GDE, machine design, and engineering Significant progress on FNAL SRF infrastructure –Many new facilities turning on in FY07 But… pace of progress is limited by funds –Key long term items are not adequately funded (new NML refrigerator, EBW, new large cavity processing facility, Detector R&D etc) Developing extensive collaborative connections with the goal of becoming a trusted international partner Extensive CFS work in progress to develop ILC design and study FNAL as a possible ILC host site Growing staff involvement and outreach efforts Expect FNAL to play a large role in the EDR

9/25/2007 R.D. Kephart DOE Annual Review 38 FY08 Goals and Milestones Major contributions to the EDR effort Continue to expand collaborative work on ILC/SRF Complete Commissioning VTS & HTS Oct 07 New HPR system complete at ANL Dec 07 1 st 9-cell operation of ANL EP system Jan 08 Process & test ~ 25 Jlab, Cornell, ANL/FNAL New 9-cell thermometry system for VTS Jan 08 Start move of A0 Photoinjector to NML Feb 08 Type IV CM parts out for bid Mar 08 Ship 3.9 GHz CM to DESY Apr 08 Finish design FNAL processing facility Jun 08 Operation of 1 st CM in NML Aug 08 Increased effort on industrialization