MV Network Operation and Control Barcelona 12-15 May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.

Slides:



Advertisements
Similar presentations
Modems Telemetry Products Intelligent Modems. Modems  1. What is an intelligent Modem?  2. Where can they be applied?  3. Are they easy to install?
Advertisements

TURKEY AWOS TRAINING 1.0 / ALANYA 2005 TRAINING COURSE ON AUTOMATED WEATHER OBSERVING SYSTEMS ( AWOS ) MODULE C.2: COMMUNICATION SONER KARATAŞ ELECTRONIC.
Basic Jens Neigaard.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Load Management System
Distributed Intelligence Provides Self-Healing for the Grid
MIFII DIGITAL FEEDER PROTECTION A Cost Effective Protection Solution for Overcurrent Protection at Any Voltage Level GE Multilin
Understanding the IEC Standard 李嘉凱 指導教授:柯開維.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
RT3b – André Smit, Siemens USA
Megger - Substation overview product groups, 2600 products.
Smart Grid Protection RT 3 b
Engineering innovative electronic surge protection for PV plants Costruzioni Elettromeccaniche P. Torresan SDS ® Surge Defence.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Interrupts (contd..) Multiple I/O devices may be connected to the processor and the memory via a bus. Some or all of these devices may be capable of generating.
Minos Prepared By Mahdi Al-Saeed. WHAT'S MINOS SYSTEM Minos System is a patented, high technology system to remotely manage and control the public lighting.
SDS ® Surge Defence System innovative electronic surge protection Costruzioni Elettromeccaniche P. Torresan Engineering.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
1 PCA2 On-load Protection Condition Analyser. 2 PCA2 online testing concept Concept introduction: PCA2 is a new system test approach intended to save.
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
SCADA and Telemetry Presented By:.
Introduction Mobile Switch is a device which will be helpful to switch on and off any electrical/electronic devices through a SMS. The parameters of these.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
April 2011 ezPAC SA320/330. SATEC 25 years of Innovation in measurement & management of Energy and Power Quality.
Single Loop Analogue addressable fire control Panel
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
What makes substation work?
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Electrical Distribution Training
Aleksandra RAKOWSKA Jozef LORENC Witold HOPPEL Poznań University of Technology Institute of Electrical Power Engineering DISTURBANCES IN POLISH 15 KV NETWORK.
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Reyrolle LMT Breaker Retrofit BU PPMV – PG Service Marketing and Sales
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
SmartMQn Motor Horner APG, LLC September 9, 2008.
Bogotà 12/03/2015 The Italian regulatory scheme. Continuity of Service Carlo Laderchi Global Infrastructure and Networks.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
NERC Lessons Learned Summary LLs Published in September 2015.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
SmartMQn Motor Protective Functions Ken Jannotta Jr. Horner APG, LLC.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
1 Industrial Systems BUS2000 Busbar Differential Protection System Differential overcurrent system with percentage restraint protection.
Power Systems J. Sandberg July 2006 RHIC Retreat 2006.
Ch. 6 Digital Data Communication Techniques. 6.1Asynchronous & Synchronous Transmission Asynchronous Transmission: transmission in which each information.
What makes substation work?
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
ECE 498HZ: Power Distribution System Analysis
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
AUTOMATIC CIRCUIT RECLOSER
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Experiences on location of earth faults and short circuits
What is meant by ‘Preventive Monitoring’?
PRACTICAL METHOD FOR ANALYSIS OF GROUNDING SYSTEM OF HV/MV SUBSTATIONS LOCATED IN URBAN AND SUBURBAN AREAS.
the CERN Electrical network protection system
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Peter van Oirsouw (Phase to Phase)
Utilizing the ring operation mode of MV distribution feeders
Exercise Session 11 Power systems.
Janne Lappi Jaana Suontausta
Backup Power supply for Electrical substations Overview 01/2012
Presentation transcript:

MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

ENEL DISTRIBUZIONE MV NETWORK: primary (HV/MV) substations: 1,650 all remotely controlled; secondary (MV/LV) substation: 270, % of them remotely controlled total length of MV lines: 332,000 km (37% cable and 63% overhead) Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

3 MEDIUM TERM PROGRAM TO IMPROVE THE QUALITY OF SUPPLY: remote control of MV/LV substations; introduction of a new grounding system in medium voltage (MV) networks; automation of fault detection, isolation and service restoration procedures on MV network. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

4 REMOTE CONTROL OF MV/LV SUBSTATIONS 80,000 secondary substations by the year 2004 motorised switch disconnectors; low cost/high performance Remote Terminal Units; telecom modules based on GSM system; 29 Control Centres for the all territory. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

5 RTUS FOR MV/LV SUBSTATIONS Operate the switch disconnectors; localize the fault; restore supply automatically. RTUs are fully programmable through a PC; application program and all the main important parameters are downloadable from the control centre. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

6 TELECOMMUNICATION SUBSYSTEM Adoption of the existent GSM cellular network; PSTN lines or leased lines can be used. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

7 CONTROL CENTRES Based on powerful servers for operation and network configuration; multiserial interface boards and ISDN modems implement the connections with RTUs. spontaneous call originates directly from the peripheral when a severe alarm generates in the substation; the operator in order to acquire alarms, measurements or to send commands on switches can launch a request of connection; each alarm or command or change in status of the switches is displayed and recorded. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

8 MEDIUM VOLTAGE NEUTRAL EARTHING SYSTEM The Italian choice, in the past, has been to operate the MV networks with isolated neutral in almost all the cases; At the end of the 90s Enel Distribuzione experimented the connection of neutral to earth through impedance in some of its MV networks; In 2000, the very interesting operation results brought Enel Distribuzione management to spread the application of the connection on MV neutral to earth through impedance. Goal is 2800 MV bars with neutral connected to earth trough impedance by 2007 Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

9 COEXISTENCE OF NETWORKS WITH PETERSEN COILS WITH NEIGHBOURING ONES HAVING THE NEUTRAL POINT ISOLATED a new generation of protections (called NCI) has been developed; protection against earth faults independently from neutral operation: isolated or compensated; this feature is obtained by adding several programmable thresholds and angular sectors of intervention active at the same time. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

10 Vo Fig. 1:Feeder protection relays intervention sectors for isolated (NI) and compensated (NC) networks Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

CHANGE OF MV NEUTRAL EARTHING SYSTEM FROM ISOLATED TO COMPENSATED BY MEANS OF PETERSEN COIL The number of transient interruptions are strongly (by 57%) reduced as well as short ones (by 40%); significant reduction of long interruptions (by 33%); The control systems used for MV network with compensated neutral allow a better network monitoring increasing the number of “low” signals available to focus on preventive maintenance. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

15 BASIC CONCEPTS OF MV AUTOMATION Based on a group of automatons resident in the RTU memory; automatons operate fault detection and selection through simple actions and delays triggered locally by two signals: Voltage and Fault; The recloser unit, installed inside the line protection panel, masters the timing sequence of the operations. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

16 FAULT DETECTORS (RGDAT) This device detects earth faults and short circuit and has:  directional sensitivity;  remote changing of the working direction;  high sensitivity in both grounding configuration of the MV network (isolated/compensated neutral). Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

17 DESCRIPTION OF FRG AND FNC AUTOMATION TECHNIQUES FRG and FNC are two different methods of automatic fault location, isolation and service restoration on the healthy sections located upstream from the faulty ones. The operator in the Control Centre can:  select the appropriate procedure depending on the type of the line and the status of the neutral; –receive the spontaneous call from RTUs in order be alerted and complete the procedure, re-supplying the healthy sections of the line located downstream from the faulty section. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

18 FRG TECHNIQUE Rules performed by each automated switch: 1.the switch is opened if there is a lack of voltage on the Voltage Detector (VD) lasting more that a certain time and the Fault Detector (FD) has been activated by the fault current; 2.the switch is closed when the VD detects the voltage restoration due to the reclosing of the circuit breaker or the switch located upstream; 3.the switch is opened and locked in the open position when, executing the closing operation according to the rule n.2, there was a lack of voltage (VD) and at the same time the activation of FD, both within a time window starting from the closed position of the switch. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

FNC TECHNIQUE The adopted logic is different depending on the type of fault so as detected by RGDAT:  for short-circuits (overcurrent detector) the logic act as in the FRG procedure;  for earth faults:  the switch is opened and locked, after a programmed delay;  the delay programmed for each automated switch is calculated according to the position of the substation along the feeder so as to open the farthest switch from the Primary substation among those having detected the fault. Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

20 : MOTORISED/AUTOMATISED SWITCH DISCONNECTORS (SS1) CB (A) 1 2 FAULT LOCATION 1 FAULT LOCATION 2 FAULT LOCATION 3 (SSB) TYPICAL ENEL MV FEEDER CUSTOMERS: 5.5% total amount INTERRUPTIONS: 7.7% total amount CUSTOMERS: 33% total amount INTERRUPTIONS: 27% total amount Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

21 TIMES FOR THE SELECTION OF A FAULTY SECTION Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1

22 RESULTS Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1