INFSO-RI-508833 Enabling Grids for E-sciencE www.eu-egee.org Hellas Grid infrastructure update Kostas Koumantaros, Christos Aposkitis EGEE-HellasGrid Coordination.

Slides:



Advertisements
Similar presentations
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Advertisements

IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
ITT NETWORK SOLUTIONS. Quick Network Facts Constant 100 Mbps operation for users Infrastructure ready for 1000 Mbps operation to the user Cisco routing.
Company Equipment Upgrade Proposal. The Current Situation  It has been five years since Alt-F4 Inc. has upgraded any of it’s equipment.  200 Computers.
Consoles and Hardware Status Erik Gottschalk. Overview Consoles will be installed Dec. 19 & 20 Network installation will begin Dec. 11 Installation of.
Crew Management, Operations Control & Commercial Planning System
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
State of Library Technology June 2003 IT Infrastructure David Leonian Library Information Systems, Tech Support.
CPP Staff - 30 CPP Staff - 30 FCIPT Staff - 35 IPR Staff IPR Staff ITER-India Staff ITER-India Staff Research Areas: 1.Studies.
Network Proposal SMG C OMPUTER S YSTEMS. I NTRODUCTION  The network I recommend to suit your business is called a star network.  The star network will.
Digital Graphics and Computers. Hardware and Software Working with graphic images requires suitable hardware and software to produce the best results.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
Tier 3g Infrastructure Doug Benjamin Duke University.
Adam Jansen Digital Archivist Washington State Archives ISB Presentation Status Report for Digital Archives.
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
Multimedia Hardware. Network LAN- to transfer data inside a local area. WAN – to transfer data in long distance. Ethernet – method for connecting computers.
Computer Co-ordinators Day – Sydney Region ASI Solutions T4L Offerings.
Storage for Opteron Server Sun Microsystems Inc.
FZU Computing Centre Jan Švec Institute of Physics of the AS CR, v.v.i
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
Storage Systems Market Analysis Dec 04. Storage Market & Technologies.
Business Intelligence Appliance Powerful pay as you grow BI solutions with Engineered Systems.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
TRIUMF Site Report for HEPiX/HEPNT, Vancouver, Oct20-24/2003 – Corrie Kost TRIUMF SITE REPORT Corrie Kost Head Scientific Computing.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
Backup Library Comparison
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Spending Plans and Schedule Jae Yu July 26, 2002.
IST Storage & Backup Group 2011 Jack Shnell Supervisor Joe Silva Senior Storage Administrator Dennis Leong.
26SEP03 2 nd SAR Workshop Oklahoma University Dick Greenwood Louisiana Tech University LaTech IAC Site Report.
EGEE is a project funded by the European Union under contract IST HellasGrid Hardware Tender Christos Aposkitis GRNET EGEE 3 rd parties Advanced.
HEPix April 2006 NIKHEF site report What’s new at NIKHEF’s infrastructure and Ramping up the LCG tier-1 Wim Heubers / NIKHEF (+SARA)
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Facilities and How They Are Used ORNL/Probe Randy Burris Dan Million – facility administrator.
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Probe Plans and Status SciDAC Kickoff July, 2001 Dan Million Randy Burris ORNL, Center for.
CASPUR Site Report Andrei Maslennikov Lead - Systems Amsterdam, May 2003.
PC clusters in KEK A.Manabe KEK(Japan). 22 May '01LSCC WS '012 PC clusters in KEK s Belle (in KEKB) PC clusters s Neutron Shielding Simulation cluster.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
Chap 5: Hard Drives. Chap 5: Magnetic HD Chap 5: Solid State Drives.
January 30, 2016 RHIC/USATLAS Computing Facility Overview Dantong Yu Brookhaven National Lab.
Office of Science U.S. Department of Energy NERSC Site Report HEPiX October 20, 2003 TRIUMF.
SEMDirector Network Proposal Phyllis West Date 07/20/06.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
SA1 operational policy training, Athens 20-21/01/05 Presentation of the HG Node “Isabella” and operational experience Antonis Zissimos Member of ICCS administration.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
EGEE is a project funded by the European Union under contract IST HellasGrid node hosting requirements & SLA Nektarios Kozyris - Christos Aposkitis.
NDGF Site Report Mattias Wadenstein Hepix 2009 spring, Umeå , Umeå University.
Brief introduction about “Grid at LNS”
XenData SX-10 LTO Archive Appliance
Open-E Data Storage Software (DSS V6)
ICEPP, University of Tokyo
Paul Kuipers Nikhef Site Report Paul Kuipers
Mattias Wadenstein Hepix 2012 Fall Meeting , Beijing
Module 2: DriveScale architecture and components
LCG Deployment in Japan
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
Fotis Karayannis HellasGrid Scientific Coordinator GRNET
The INFN TIER1 Regional Centre
Computing Board Report CHIPP Plenary Meeting
Valid Until End of October 2017
Vladimir Sapunenko On behalf of INFN-T1 staff HEPiX Spring 2017
Storage Networks and Storage Devices
Public vs Private Cloud Usage Costs:
Special Promo Valid Until
Storage & Backup Solution Update
Special Promo Valid Until
Special Promo Valid Until
Presentation transcript:

INFSO-RI Enabling Grids for E-sciencE Hellas Grid infrastructure update Kostas Koumantaros, Christos Aposkitis EGEE-HellasGrid Coordination meeting, Athens 12-13/3/2006

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March HellasGrid Tender P1-P3 Project 1: –Computing and disk storage resources –Networking equipment –Budget € (incl. VAT) Project 2: –Tape library –Budget € (incl. VAT) Project 3: –Access Grid –Budget € (incl. VAT)

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Project 1 Procurement of: –352 servers –20 TB disk storage –Necessary LAN networking equipment w/ WAN connections Tenderers: –Hewlett Packard Hellas Ltd. / Algosystems SA –Pansystems SA (IBM hardware) –Dell Hellas SA Important dates: –Tender issued4/2005 –Proposals submitted5/2005 –Evaluation/tender award7/2005 –Contracts signed9/2005 –Equipment delivered/Acceptance tests completed 12/2005 –Final acceptance (est.) 6/2006

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Successful tenderer Partnership of Hewlett Packard Hellas Ltd. / Algosystems SA –The best score and the lowest price –13,5% discount (proposal budget €) –Servers, disk storage and racks by HP –Networking equipment and cabling by Algosystems

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Additional procurement Increased servers to 384 Increased disk storage to 30,1 ΤΒ Proportional increased of switches and other equipment (racks, KVM) Total final amount awarded €

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Equipment Servers HP DL140 (worker nodes): –Dual Xeon 3.4/2M, 2GB RAM, 80 GB SATA, Dual GbE Servers HP DL360 (management/service nodes): –Dual Xeon 3.4/2M, 2GB RAM, 2x73 GB SCSI, Dual GbE, FC-HBA Disk array HP MSA 1000 –Single tray, 14x300 GB SCSI disks, FC host interface Routing switches –Cisco 3750, 24 GbE copper, 4 SFP, Enhanced images (L3 capabilities) Switches –Cisco 3750, 24 GbE copper, Standard image (stacked with Routing switch) Other: –HP racks with integrated PDUs –KVM switches for servers

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Κόμβοι NodeDL140DL360Disk (TB) Swit ches Dlvrd NDC (National Documentation Center) ,91512/ 2005 IASA4444,3511/ 2005 Upatras6044,3611/ 2005 FORTH6044,3611/ 2005 AUTH6044,3612/

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Current state Active nodes: –UPatras –FORTH –IASA NDC –Electrical installations to be completed within April 2006 –Node will be activated then AUTH –New datacenter preparation to be completed within June 2006 –Node will be activated then

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Current state -2

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Project 2 Procurement of: –Tape Library 50 ΤΒ with double future capacity –Backup agents for HellasGrid nodes Tenderers: –General Data Business SA (ADIC hardware) –Pansystems AS (IBM hardware) –ΜΤΙ SA (Spectralogic hardware) Important dates: –Tender issued4/2005 –Proposals submitted5/2005 –Evaluation/tender award7/2005 –Contracts signed9/2005 –Equipment delivered/Acceptance tests completed 12/2005 –Final acceptance (est.) 5/2006

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Project data Tender awarded to: GENERAL DATA BUSINESS SA –The best score and the lowest price –11% discount (proposal budget €) Equipment –Tape Library ADIC Scalar i2000 with:  2 LTO-3 drives  licenses for 200 tapes (80 TB)  Extensible to 1,3 PB –Backup software Commvault  Installed on a Sun Fire V20z server (the only Opteron of HellasGrid to date :-), Windows 2003 server, Linux agents Procurement extensions –Addition of an extra LTO-3 drive –Total final awarded amount € The Library will be activated as soon as the electrical installations are complete in NDC Tapes (we might make some use of them...) –100 tapes will be procured within April 2006 to populate half of the library (40 TB)

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Project 3 Procurement of: –4 Access Grid rooms equipment Tenderers: –F. NAKAS SA Important dates: –Tender issued4/2005 –Proposals submitted5/2005 –Evaluation/tender award7/2005 –Contracts signed9/2005 –Equipment delivered/Acceptance tests completed 12/2005 –Final acceptance (est.) 5/2006

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Project data Tender awarded to : F. NAKAS SA –The best score and the lowest price (being the only one :-) –3,4% discount (proposal budget €) Equipment –Computers with 4 capture cards and 4 VGA displays –Plasma displays NEC 50” (two in every room) –Sony PTZ cameras with joystick control (three in every room) –Mini sound installation (4 mics, amplifier, speakers, mixer) Installations –FORTH, NDC, GRNET completed –AUTH will be installed along with the Hellasgrid node (June 2006) Communication capabilities –Access Grid –H.323 –VRVS –Conference XP User manual/Cookbook issued from GRNET within April 2006

Enabling Grids for E-sciencE INFSO-RI EGEE-HellasGrid coordination meeting, March Questions please...