  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.

Slides:



Advertisements
Similar presentations
59 Main Street, West Orange For BOMA/TOBY April, 2007.
Advertisements

TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
CAMBRIDGE LIBRARIES & GALLERIES QUEEN SQUARE LIBRARY.
IECC 2006 Issues and Solutions Code Overview and Issue Solving Products.
March 11, 2013 By Fred J. Hofman Superintendent/Principal Harrison Public Schools.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 5.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Campus signage – Internal
Security Installation in Rural Historic Courthouses.
Beloit College. Master Plan Goals Create a Vision for the Next 25 Years Enrich the legacy of the campus Manifest the Strategic Plan in the campus facilities.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Chuck Barry (702)
Project Title Eli and Edythe Broad Art Museum Award Category Building.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Glenvar High School Renovations School Board Presentation
Lerman Architects & Town Planners Haifa University Library Expansion of the library and renovation of the existing area.
Copyright 2004 Foreman Architects Engineers School Security From Common Sense to High Tech.
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Director of Buildings' Office Slide no.1 January 2010 Trinity College Universal Design Issues Access 2010 Cobble Reduction Access to Historic (Protected)
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
Malcolm X.  Firm History and Experience  In business for 50 years specializing in designing schools!  98% of work is educational facility planning.
Feasibility Study Update – April 23 th, Agenda and Goals 1.Review Design Values 2.Review Program Elements 3.Review Design Strategies 4.Review Next.
Massie Heritage Interpretation Center Savannah, Georgia.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
59 Main Street, West Orange For BOMA/TOBY April, 2007.
Visitor Center Heritage Crossroads: Miles of History Heritage Highway  Designated in 2008 as a Florida Scenic Highway by Florida Department of Transportation.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning.
Bainbridge High School 200 Building Bainbridge Island, Washington High School Project of Distinction/New Construction Mahlum 2009 Exhibition of School.
Alkek Expansion Pre-Submittal Conference October 5, 2006.
Schematic design presentation School of Business South Hall Renovation.
January 26, Key Themes from User Groups
OLA Library Building Award. Interior Views of Library Entrance Major Public Services Position Typical User Areas Public Spaces – Existing Light Only Major.
May 23 rd, 2011 MALLS, SHOPPING CENTERS & MUSEUMS.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Corporate Security & Safety “Confidence through Security; Safety for life!” Robert D. Achenbach Corporate Security & Safety Officer Corporate.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
FACILITIES MASTER PLAN FMP Review October TIME LINE 2014November 2015 February March April May October / November December Education / Facility.
Learning, Health, and Safety Capital Project Alternates and Change Order
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Southeast Financial Center
COZYEON Residence Main facilities gallery. Corridor of each floor.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
1970 Campus Dr. Evanston, IL.  Library administration and facility manager will contact  University Police (456)  Facilities Management (1-5201) 
Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com.
Accessible Environment
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
School Safety Audit Holladay Elementary School
Penn Medicine Chester County Hospital
School Safety Audit Holladay Elementary School
New York City Master Plan Update
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
BUILDING FOR TODAY PLANNING FOR TOMORROW &
Presentation transcript:

  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the connection between Deering and the University Library to facilitate the movement of patrons, staff and material between buildings  Preserve the unique architectural character of Deering spaces to enhance their use by students, faculty and scholars. RMJM Hillier Facilities Master Plan recommendations for Deering West entrance

  Reopen the west entrance and restore the lobby to use as an entry and gathering/exhibit space  Create an accessible route from the reopened west entrance to University Library and within Deering Library  Improve the legibility of circulation between the two buildings (University Library and Deering Library) and within Deering Library  Respect the architectural character of the existing design in the process of restoring, renovating and or creating new elements to meet the program goals  Maintain the library in operation throughout the construction Goals

  Constructing a visitor security desk within the 3,000 square foot entrance of Deering (with 3M security equipment)  Restoring the historic lobby interiors  Refurbishing wall-mounted display cases  New floor exhibit cases to match the interior décor with security hardware and temperature/humidity controls Scope of work

  Provide an accessible route from the west entrance of Deering Library to the University Library  Restoring exterior doors and lighting at the west entrance, and  Installing large display monitors along the first floor corridor that connects Deering with the University Library  Constructing an accessible ramp leading to the west entrance  New elevator cab in existing shaft Scope of work cont.

 Old Exterior West Entry

 New Exterior West Entry

 Old Lobby Plan

 New Lobby Plan

 Old Lobby

 New Lobby

 Old Signage

 New Signage cont.

 Old Signage cont.

 New Signage cont.

  7 cameras  2 in loggia  1 entrance  1 exit  2 in lobby  degree PTZ  Emergency Call Box in corridor  Each exhibit case is alarmed to UP Security

 Exhibit Cases/Lighting