Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA Yu.A.Murin LHEP JINR Yu.A.Murin, Kuokola, 25 June, 2013.

Slides:



Advertisements
Similar presentations
Open Charm Everard CORDIER (Heidelberg) Grako meeting HD, April 28, 2006Everard Cordier.
Advertisements

STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
R&D for R3B/EXL silicon spectrometers, ELISe in-ring instrumentation based on planar Si and CVDD Alexander Gorshkov Flerov Laboratory of Nuclear Reactions.
The Project NICA/MPD at JINR (Dubna) Search for the Mixed Phase of Strongly Interacting Matter at Nuclotron-based Ion Collider FAcility (1  1.5)·10 27.
1 J.M. Heuser et al. CBM Silicon Tracker Requirements for the Silicon Tracking System of CBM Johann M. Heuser, M. Deveaux (GSI) C. Müntz, J. Stroth (University.
Working Group 5 Summary David Christian Fermilab.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
"Indian Participation in FAIR: Science and Technology"
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans.
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
Valery Dormenev Institute for Nuclear Problems, Minsk
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Development of Silicon Sensors for Tracking Systems: MPD, CBM and at NICA and FAIR Michael Merkin SINP MSU Prague, ASI Symmetries and SPIN1.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Dmitri Ossetski Obninsk State University Department of Applied Mathematics
Large Area Fast Silicon Tracking Systems for MPD and CBM setups of NICA and FAIR megaprojects Yu.A.Murin LHEP JINR 1 NICA-Praha-2013, 7-13 July, 2013.
Results from first beam tests for the development of a RICH detector for CBM J. Eschke 1*, C. Höhne 1 for the CBM collaboration 1 GSI, Darmstadt, Germany.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
The Compressed Baryonic Matter Experiment at FAIR Physics Program, Challenges and Status.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
GSI, Si microstrip detectors for R3B – general concept and prototypes O. Kiselev Gesellschaft für Schwerionenforschung, Darmstadt Institut für.
20/12/2011Christina Anna Dritsa1 Design of the Micro Vertex Detector of the CBM experiment: Development of a detector response model and feasibility studies.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI Darmstadt, 12 March 2009 Status of the CBM Silicon.
Exploring QCD with Antiprotons PANDA at FAIR M. Hoek on behalf of the PANDA Collaboration IOP Nuclear and Particle Physics Divisional Conference 4-7 April.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Picosecond timing of high energy heavy ions with semiconductor detectors Vladimir Eremin* O. Kiselev**, I Eremin*, N. Egorov***, E.Verbitskaya* * Physical-Technical.
LIT participation LIT participation Ivanov V.V. Laboratory of Information Technologies Meeting on proposal of the setup preparation for external beams.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
24 May 2008V.Kekelidze, CC NICA/MPD1  Collider versus Fixed Target  Towards 4  acceptance  Working groups - EC  TPC - EC tracking (examples)  Plans.
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Vasilisa Lenivenko Vladimir Palichik (LHEP, JINR ) Alushta, June 2016.
Multi-Strange Hyperons Triggering at SIS 100
The Status of the CBM Experiment
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
High rate time of flight system
– a CBM full system test-setup at GSI
Progress with System Integration of the CBM Silicon Tracking Detector
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
Perspectives for Heavy-Ion Collisions at Future Facilities
Strangeness Prospects with the CBM Experiment
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
A heavy-ion experiment at the future facility at GSI
IHEP group Shashlyk activity towards TDR
First results from technical run with deuteron beam
The FAIR Project Physics Programme of FAIR CBM PANDA NUSTAR
Project "Nuclotron M" / NICA
Presentation transcript:

Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA Yu.A.Murin LHEP JINR Yu.A.Murin, Kuokola, 25 June, 2013

Global tasks of heavy ion high energy physics JINR Yu.A.Murin, Kuokola, 25 June, 2013 Deconfined matter Confined matter Spinodial decay ? Deconfined matter Chiral symmetry restoration Magnetic fields up to G Strange matter continent (“new hypernucler physics”)

Two major objectives to study heavy-ion collisions at intermediate energies Deconfinement through SD New Hypernuclear Physics SIS-300 and NICA task SIS-100 (FAIR) and Nuclotron-M (NICA) tasks Superdense nuclear matter Yu.A.Murin, Kuokola, 25 June, 2013

4 Energy region covered by the LHEP and GSI facilities (in deutron energy, recalculated for E lab ) E lab, GeV/u SIS-18 (GSI) Nuclotron-N (JINR) Booster (LHEP) Collider NICA (JINR) SIS-100 (FAIR) SIS-300 (FAIR) fixed target colliders operational Year of putting in operation RHIC & LHC(BNL, CERN) Yu.A.Murin, Kuokola, 25 June, 2013

UNILAC SIS18 SIS100/300 p-Linac HESR CR & RESR NESR 100 m Primary Beams /s; 1.5 GeV/u; 238 U /s 238 U 73+ up to 35 GeV/u 3x10 13 /s 30 GeV protons Storage and Cooler Rings radioactive beams antiprotons GeV/c, stored and cooled Secondary Beams range of radioactive beams up to GeV/u; up to factor higher in intensity than presently antiprotons GeV Technical Challenges cooled beams rapid cycling superconducting magnets dynamical vacuum SIS100: Au 11 A GeV SIS300: Au 35 A GeV APPA The Facility for Antiproton and Ion Research FAIR Yu.A.Murin, Kuokola, 25 June, 2013

Modul 0 SIS100 Modul 1 CBM, APPA Modul 3 Antiproton- target, CR, p-Linac, HESR Modul 2 Super-FRS The Facility for Antiproton and Ion Research FAIR Yu.A.Murin, Kuokola, 25 June, 2013

STS JINR-GSI coop. Yu.A.Murin, Kuokola, 25 June, 2013 LHEP plans for new facilities within NICA megaproject

The experiment project measurements of the multistrange objects (Ξ, Ω, exotics) & hypernuclei in HI collisions close to the threshold production in the region of high sensitivity to the models prediction GIBS magnet (SP-41) TS-target station, T0- start diamond detector, STS - silicon tracker, ST- straw tracker, DC- drift chambers, RPC- resistive plate chambers, ZDC- zero degree calorimeter, DTE – detector of tr. energy. Yu.A.Murin, Kuokola, 25 June, 2013

10 Beam Energy Intensity per cycle p 4,5 GeV 2  d 2,2 GeV 5  C MeV 7  Mg MeV 5  Ar MeV 6  Ni MeV 8  Kr 34+ 0,3 -1 GeV 2  Xe 48/42+ 0,3 -1 GeV 1  Ta GeV 2  Au 65/79+ 3  U 28+/73+ 0,05-1 GeV 6  10 9 /2  Bea m Nuclotron beam intensity (particle per cycle) Current Ion source type New ion source + booster p 3  Duoplas motron 5  d 3  ,,  He 8  ,,  dd 2  10 8 SPI 1  Li 8  10 8 Laser 5  C 1  ,,  Mg 2  ,, N 1  10 7 ESIS (“Krion- 6T”) 5  Kr 1  ,,  Xe 1  ,,  Au- ---,,  10 9 HI beams of SIS18 (GSI) and Nuclotron (JINR) Energy & Intensities, pcs per cycle

The CBM experiment at FAIR Dipole Magnet Ring Imaging Cherenkov Detector Silicon Tracking System Micro Vertex Detector Transition Radiation Detectors Resistive Plate Chambers (TOF) Electro- magnetic Calorimeter Projectile Spectator Detector (Calorimeter) Target two configurations: - electron-hadron - and muon setup Muon Detection System Yu.A.Murin, Kuokola, 25 June, 2013

STS design constraints Coverage: ―rapitidies from center-of mass to close to beam ― aperture 2.5° <  < 25° (less for BM_N) Momentum resolution ― δp/p  1% ― field integral 1 Tm, 8 tracking stations ― 25 µm single-hit spatial resolution ― material budget per station ~1% X 0 No event pile-up ― 10 MHz interaction rates ― self-triggering read-out ― signal shaping time < 20 ns Efficient hit & track reconstruction  close to 100% hit eff.  > 95% track eff. for momenta >1 GeV/c Minimum hit rates < 20 MHz/cm 2 ― maximum strip length compatible with hit occupancy and S/N performance ― largest read-out pitch compatible with the required spatial resolution Radiation hard sensors compatible with the CBM physics program ―1 × n eq /cm 2 (SIS100) ―1 × n eq /cm 2 (SIS300) Integration, operation, maintenance ―compatible with the confined space in the dipole magnet Yu.A.Murin, Kuokola, 25 June, 2013

Aperture: 2.5° <  < 25° (some stations up to 38°). 8 tracking stations between 0.3 m and 1 m downstream the target. Built from double-sided silicon microstrip sensors in 3 sizes, arranged in modules on a small number of different detector ladders. Readout electronics outside of the physics aperture. System concept Yu.A.Murin, Kuokola, 25 June, 2013

Assessment of tracking stations – material budget station 4 sensor: 0.3% X 0 r/o cables: 2×0.11% X 0 electronics front view side view Yu.A.Murin, Kuokola, 25 June, 2013

Assessment of tracking stations – sensor occupancy sensor occupancy := ratio “ nb. of hit strips : nb. of all strips“ in a sensor station 1 Y/cm Yu.A.Murin, Kuokola, 25 June, 2013

Assessment of tracking stations – hit cluster size in station 4 mean: 2.7 distribution for full STS cluster of strips := number of adjacent strips in a sensor that fire simultaneously Yu.A.Murin, Kuokola, 25 June, 2013

Track reconstruction performance studies momentum resolution  Ongoing layout improvements: aperture improvements to be done in some of the stations: better coverage around beam pipe optimize number and type of modules and their deployment in the stations primary secondary track reconstruction efficiency 25 AGeV Au+Au central Yu.A.Murin, Kuokola, 25 June, 2013

Au+Au, 8 AGeV Physics performance studies – example hyperons Au+Au, 25 AGeV c  several cm, decays just before/ within STS Yu.A.Murin, Kuokola, 25 June, 2013

19 Hyperon and hypernuclei with STS with CBM-like STS at Nuclotron existing SP-42 magnet  H 3  - total efficiency 8% 2 % central Au+Au collisions at 4 AGeV:  Silicon tracker: 8 stations microstrips (400 µm each)  Strips with 50 µm pitch and 7,5 o stereo angle  full event reconstruction Yu.A.Murin, Kuokola, 25 June, 2013

NICA MPD-ITS Th Computer model simulations by V.P.Kondratiev and N.Prokofiev, SPbSU MPD ITS status Yu.A.Murin, Kuokola, 25 June, 2013

The need for modern fast and high precision instrumentation based on microstrip sensors Supermodule („the ladder“)= Sensitive modules on light weighed CF support frames with FEE in cooled containers at the rare ends NICA MPD The Ladder Yu.A.Murin, Kuokola, 25 June, 2013

The CBM-MPD STS Consortium Since Nov 2008 Yu.A.Murin, Kuokola, 25 June, 2013

23 CBM-MPD STS Consortium GSI, Darmstadt, Germany JINR, Dubna, Russia IHEP, Protvino, Russia MSU, Moscow, Russia KRI, St.Petersburg, Russia University, St.Petersburg SE SRTIIE, Kharkov, Ukraine NCPHEP, Minck,Belarus Rep. PI AS, Prague,Czech Rep 8 institutes 5 countries Components Modules assembly Ladder assembly Radiation tests In-beam tests CBM in Darmstadt MPD and in Dubna Yu.A.Murin, Kuokola, 25 June, 2013

Mechanics Produced in SPb with a dozen CF space frames CERN Punch and Mold for production of true CBM supporting frames Yu.A.Murin, Kuokola, 25 June, 2013

Demonstrators and prototypes Yu.A.Murin, Kuokola, 25 June, 2013

The CBM-MPD STS Consortium: change in sensor production policy – mixed DSSD SSSD structure of STS (based on experience gotton!) DSSD: German Party responsibility – CiS, Erfurt (62х62) + Hamamatsu, Japan (42х62), double metalization on P-side SSSD-sandwich: the Consortium responsibility Hamamatsu, Japan (42х62), On-SemiConductor, Czech Rep. (62х62) + auxiliary chipcable (SE RTIIE) +RIMST,RF Sensor development – involvement of Hamamatsu, Attepmpt to repeat at Vendors in Russia, Belarusia, and Czeh Republics Yu.A.Murin, Kuokola, 25 June, 2013 Usage of SINP MSU Si lab expertize ( Merkin M.M. et al)

Prototype Device for ladder assembling manufactured at PLANAR, Minsk, Rep. of Belarus, 2012 Yu.A.Murin, Kuokola, 25 June, 2013

The German forced change in tentative WP of the Consortium : TDR Jun 2013 – Comissioning Oct 2017   Yu.A.Murin, Kuokola, 25 June, 2013

Equipment of JINR test bench with n- XYTER readout Mechanics preparation Slow Control for Protvino in-beam Logic Init for recording the external DAQ information into the ROC Status: Preparations for the in-beam tests at Nuclotron Preparations for the in-beam tests at Nuclotron Yu.A.Murin, Kuokola, 25 June, 2013

 Through years the CBM-MPD STS Consortium demonstrated self-sustained growth of R& D activity which could be successfully accomplished within 1,5 -2 years The Conclusions  In 2013 common GSI-JINR project started with resources 3 M USD) released to develop corresponding infrastructure for massive production of modules and, especially, supermodules at LHEP JINR by mid-2015 for the and CBM STS projects, firstly, and NICA-MPD ITS, afterwards  Young generation recruitment and training is the basic problem of the project to be discussed tomorrow in more details as well as more involvement of physicists from the Universities of both capitals of Russia Thank you for your attention! Yu.A.Murin, Kuokola, 25 June, 2013