Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City.

Slides:



Advertisements
Similar presentations
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Advertisements

Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Farmlands Office Of Environmental Services Managing the Environmental and Project Development Process Presented by the Ohio Department of Transportation.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Anaheim Regional Transportation Intermodal Center Project Update.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Goods Movement and Traffic Issues In the SACOG Region The Effects of Congestion on Goods Movement in our Region February 9, 2006 Jason Crow.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
2011 TRB Workshop Camp Withycombe Small Arms Firing Ranges Green Remediation-Case Study Sunrise Corridor Project 1 Presented by: Len Farr AMEC Earth &
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
OREGON ECONOMIC & BRIDGE OPTIONS STUDY The problem is not just the bridges, or the freight system, It is about Oregon’s economy and quality of life. FHWA.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Stage 2 Light Rail Transit Program “In the ground ready”
Potomac Yard Metrorail Station

I-15 North Phase 4 Scoping & Project Management Assistance
Regional Roads Committee
Willow Meadows Civic Club Meeting September 13, 2011
PROJECT LOCATION 1st tier suburb Population of 22,000
US 181 Harbor Bridge Project
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Highway 14 – Owatonna to Dodge Center District 6 Update
Green Energy and Green Spaces
Planning Commission Hearing
OR 99E Corridor Segment Plan
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
PROJ. 566(17) LOR PID MAJOR WIDENING
Lyle Parkway to SR 540 (Winter Lake Road)
Joint City Council / Planning Commission
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Port of Portland properties and facilities
AN INVESTMENT IN CALIFORNIA’S FUTURE
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Sunrise JTA Project Jobs and Transportation Act

Project Vicinity I-205 Downtown Portland Oregon City

Sunrise Corridor Background Began planning in 1980s – I-205 to US 26 DEIS 1993, paused for regional land use considerations (Damascus) Clackamas County adopted Preferred Alternative 1996 ODOT and Clackamas County acquired land: ◦ “Superfund” site and other properties ◦ Camp Withycombe property, ODOT District Office

Sunrise FEIS Clackamas County $19 million earmark ODOT $20 million OTIA III SDEIS began 2004 – I-205 to Rock Creek Junction SDEIS published – October 2008 Preferred Alternative selected July $1.4 billion Final Environmental Impact Statement (FEIS) published December 2010 Record of Decision (ROD) February 2011

Sunrise FEIS Rock Creek Junction 122 nd. Avenue I-205

Jobs and Transportation Act 2009 Legislature: HB 2001 / Jobs and Transportation Act or JTA, dedicated $100 million towards the design and construction of the Sunrise $130 million total available $30 million Right of Way acquired / available Practical Design emerged Multiple Design Exceptions will be necessary

Rock Creek Junction 122 nd. Avenue I-205 JTA Projects compared to FEIS

Coordination Complexity ODOT 2B Maintenance Facility Modification OIW Streetcar Test Track Accomodation Relocate Industrial (Minuteman) Way OIW Access Structure Former NW Pipe & Casing Site (CERCLA) EPA Well Relocation Local Access Road Building Demolition UST Removal Early Tree Removal

Stakeholders EPA/DEQ – Superfund Cap Management USACE - Unexploded Ordnance UPRR - crossing closure, a proposed 4 th UPRR Rail line, and a pier protection wall DEQ – Wetland fill / Remediation WES – Stormwater approval DEQ – Solid waste encapsulation Military – Access/security Clackamas County Development Agency – public land management ODOT District 2B

Value Engineering Adjustments How much of the FEIS Preferred Alternative do we stage or construct for ◦ 82 nd Over I-205 Bridge ◦ 122 nd Interchange Embankment  R/W impacts: FEIS acquisition, JTA partial, or a retaining wall ◦ Soundwalls - FEIS or JTA Bicycle/Pedestrian Connections ◦ SUP 1 and SUP 2

“Design Excursions” Soundwall #2 Location at Camp Withycombe ODOT District 2B Reconfiguration Design Speed Concerns Stormwater Design “approval” UXO remediation project stalled “What would it take to keep the at-grade railroad crossing at Lawnfield Road”

Procurement/Bidding Industrial Way Extension Alternative Contracting ◦ Disadvantaged Business Enterprises ◦ Oregon Firms Right of Way Holdouts Additive Alternative Work Options ◦ SUP 1 - I-205 to Lawnfield ◦ SUP 2 - Mather Road to 122nd

Construction Station and Offset Staging & Erosion Control Embankment construction Design Excursions Continue ◦ Widening to 4 lanes ◦ Tolbert Overcrossing ◦ “What would it take to remove the OIW structure” ◦ Higher and best use

Looking East

82 nd over I-205 Bridge

Emmert International

Looking West

UXO, Mud & Kerr

Questions