AIRFIELD PAVEMENT PERFORMANCE ISSUES AND RESEARCH NEEDS - AN AIRPORT OPERATOR’S PERSPECTIVE FAA AIRPORT PAVEMENT WORKING GROUP MEETING APRIL 25, 2012
Port Authority of NY&NJ Airport Operations JFK LGA TEB EWR SWF
Pavement Performance Issues
Shoving of the Surface of HMA Runway Pavements
HMA Paving Joint Performance
Eight to Ten Year HMA Surface Service Life
PCC Joint Fraying and Spalling
8 Skilled Contracting Workforce
Reduced Maintenance Budgets and Staff
Research Needs
Field Test Program
Grooved Asphalt Pavement Preservation Treatment
Joint Spacing
3D Pavement Optimization
Porous Pavement
High Recycled Material Content
Quick Durable Repairs
Engage the Airport Operators
THE END Thank you