Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI2.589420 Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:

Slides:



Advertisements
Similar presentations
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Advertisements

The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Union.
1 Intelligent Energy Europe 2009 European Commission, EACI Market Replication Eco-Innovation and Intelligent Energy Astrid Geiger, Head of Sector Energy.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
MODULE B - PROCESS B1.ASME Organizational Structure B2.Standards Development: Staff and Volunteer Roles and Responsibilities B3.Conformity Assessment:
EVOLUTION OF ECOSTARS Doncaster, 30 May 2012 Tom Parker, Donald Chalker Transport & Travel Research Ltd.
Title of Training Presentation Presented by Your Name.
Green Energy Clusters Project supported by the ”Intelligent Energy – Europe” programme for the European Community Stimulation of regional RES HEAT markets.
IEE OffshoreGrid Regulatory Framework for Offshore Grids and Power Markets in Europe: Techno-economic Assessment of Different Design.
ATLAS GridKa Cloud F2F meeting in Prague Jiří Chudoba Institute of Physics, Prague Monthly Meeting,
GET SUPPORT IN GREENING YOUR VEHICLE FLEET IEE Contract number: IEE/11/907/SI Project duration: 1/9/ /8/2015 Date of slides: June 2013.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
PSAP Service Capability Assessment Tool Session A Joint Effort of APCO and NENA Presented June 10, 2009 for Discussion & Feedback by: Tom Breen, ENP.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
9 th March 2010 Institute of Energy Research – Systems Analysis and Technology Evaluation Slide 1 Mitglied der Helmholtz-Gemeinschaft Important Details.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
SPIRIT Energising Faith Communities Contract number: IEE/13/524/SI Project duration: 30 months Last modified:
CONURBANT - IEE/10/380/SI An inclusive peer-to-peer approach to involve EU CONURBations and wide areas in participating to the.
A Clearer Future Conference 17 th September, 2009 Chris Douglas Transport and Travel Research Ltd.
WELCOME to the RECOMMEND Peer Assessment Workshop 1 st and 2 nd April 2014 Ascoli Piceno - Italy 1st April 2014.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session 06 August 2013 The Road Accident Fund.
IEE/10/380/SI IV Project Meeting - Limassol – October 4th 2012 CONURBANT An inclusive peer-to-peer approach to involve EU CONURBations and wide.
P4ITS KICK-OFF MEETING Sébastien Mure Project coordinator.
Enhancing innovation in education and training for medical staff in Europe Kick-Off MEETING Želevčice, Czech Republic.
National Geospatial Advisory Committee Update FGDC Coordination Group Meeting April 1, 2008.
Initial Planning Conference (IPC) [Exercise Name] [Date]
FGDC Joint Meeting Coordination Group & Executive Committee June 3, 2009.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Brest field visit 16 _ 17 December University of Western Brittany Yannis KABLAN, European project manager.
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
SDK Cluster Ontology Working Group Meeting Welcome Rudi Studer Institute AIFB, University of Karlsruhe FZI Research.
World Trade Center Malmö Energy Summit September 23rd and 24th 2008 for a better world for a better world 1.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Thursday, 26th of February 2004, Scandic Hotel Mölndal 08:30- 09:45Welcome and opening Lars Ekberg, Head of Economic Development Office, City of Mölndal.
S3.1 day 6 training delivered by lead partners Habitat for Humanity, RedR and Shelter Centre on 2 nd to 9 th July 2011 in Thailand approved by the Advisory.
DCMF Distribution Charging Methodologies Forum Institute of Physics Thursday 4 April 2013 Distribution Charging Methodologies Forum Institute of Physics.
Integrated HIA/EIA of the M1 Widening Scheme in South Yorkshire Natalie Pugh HIA Coordinator Rotherham PCT
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Overview deliverables and achievements second reporting period Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels.
Materials for today’s session  Shared website – Wiki   Wireless.
Future Directions Update Project Timeline Report to the Steering Committee - 6/04 Briefing to Coordination Group - 6/1/04 Comments due - 5/14/04 Briefing.
Agenda of Stockholm meeting Objectives 1.Identify the level of description of the accreditation process and criteria (using results of stage 2, questionnaires.
Des Moines Area MPO Environment Roundtable June 10, 2014.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
Welcome to the first Study Visit! Sussex Innovation Centre, November
Researchers Supervisors Local Coordinators Administrators EU- Coordinators Industrial Partners Assoc. Partners.
Agreement Trialling Wednesday/Thursday 3 & 4 May 2017
Mark Fell, Associate Transport & Travel Research Ltd.
Ibicus IB DP TEACHER TRAINING WORKSHOPS
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
2016 GOVERNANCE GROUP UPDATE
MIND Project Annual Meeting 3
Understanding Conservation Management Plans
Statistical capacity building in the ENP South countries
National Workshop on the Implementation of Recommendation 204 Concerning Transition from the Informal Economy to the Formal Economy in South Africa Day.
WG7 Agenda Pau, F2F Meeting
The John Bentley School
Parish Audit 2013 Summary of the Diocese of Paisley
Upcoming Title III Events

PATH TO A JOB. 2ndTransnational meeting.
Alan Thomson, Vice chair
Introduction to ECOSTARS
Monxton Parish Council
PROGRAMME 07H30 – 09H Registration and Tea ALL
Presentation transcript:

Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date: June 2011 End date: May Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date: June 2011 End date: May Parma Consortium Meeting Agenda Project Management Group 4 | Italy| Presented by: Mark Fell 04/06/2012

 Chiara Spaggiari (Infomobility)  Jan Spousta (CDV)  Libor Spicka (CDV)  Michela Fioretto (ISIS)  Eleanor Dearle (Barnsley MBC) Welcome to consortium

 Chris Douglas (TTR)  Jeroen Maijers (Rotterdam)  Orestes Cendrero (CTL Cantabria) Welcome back

Apologies Olav Luyckx (EACI) Dagmar Roeller (POLIS) Tom Parker (TTR)

Meeting: Day 1 09:30 – 09:45Welcome from Chair – Mark Fell, TTR 09:45 – 10.15Welcome to Parma by Councillor Gabrielle Folli, Municipality of Parma 10:15 – 10:35WP1 & WP3 – Mark Fell, TTR 10:35 – 10:50WP2 - Fredrik Orwen, WSP 10:50 – 11:10WP6 - Evaluation, led by Michela Fioretto, ISIS 11: Break 11:30 – 11:50WP4 - Mark Fell on behalf of Dagmar Roeller, POLIS 11:50 – 12.10Local presentation from 4* ECOSTARS Parma member “TEP” (the local public transport company of Parma) – 13:00Lunch

Meeting: Day 1 Continued 13:00 – 16:30WP5: Local scheme reports(include local dissemination update): (20 mins each with time left for discussion and input from reference group):  Infomobility, Parma  Edinburgh CC  CDV, Ostrava  IVL, Euskadi  South Yorkshire  Rotterdam  CTL, Cantabria  ESS, SE Sweden With 15 minute coffee break at 4pm followed by discussion 16:30Update on ECOSTARS-ZERO bid development – Mark Fell 16:45Meeting closes Prearranged one to one discussions with Project Coordinator 18:00 – 19:30Guided tour (including visit to Town Hall for a welcome from the Mayor and the presentation of ECOSTARS Parma certificates to local scheme members) 20.00Consortium dinner

Meeting: Day 2 Auditor Training 09:00-09:15Coffee and tea on arrival 09: Welcome Brief summary of the original training sessions Refresher quiz 10.20Discussion on auditing experiences so far 11.00Coffee break Presentation and discussion on the revised scheme assessment criteria (incorporating Euro VI and other new technologies) Road maps discussion – which recommendations get the best feedback from members, what local changes have you added? 12.45Review of the support process 13:00Meeting close 13:00-14:00Lunch