PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

Beam Position Monitors MICE CM Harbin January, 2009.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Preshower Front-End Boards News LHCb group / LPC Clermont  News  TRIG-PGA Bit Flip Behaviour  Bit Flip Simulations  Conclusion.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PreShower Characterisations
D. Breton, S. Simion February 2012
2009: restart the system: few observations. Hw maintenance week:
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont

2 PS/SPD FEB Production Status  Production & Tests running smoothly now: 16 PS/SPD FEB/week (Thanks to dedicated test team! - Catherine & Christophe - ) - No more PCB issues : 2/7 boards in preserie II - PGA programmed before implantation / Delayed production But … No more PGA problems !!! ( 6/15 boards PGA issues in preserie )  Potential shortcut spotted with RJ45 A2 connectors shielding  back manufacturer ( Hitachi ) 12 % RJ 45 A2 connector C side threshold Pres. Lot 1 Lot 2 Lot 3Lot 4 16/07 23/07 11/0722/06 Pres.Lot 1 Lot 2 Lot 3Lot 4 16/0723/0711/07 22/06 Valid PRS FEB status Target is to equip C side before end of July / installation ‘on flight’ 10 FEBs with A2 to be fixed Faillure Rate ( % ) # PRS FEB

3 PRS Electronics Installation Status  All VFE previously installed & cabled April-May All tested and left OK Problems: Dead contacts (RJ45 analogic signal/clock) ~1/5 boards VFE not powered / Low Voltage ~1/50 boards Solved by re-plugging RJ45 or VFE power cable Notice: RJ45 dead contact occur both on FE and VFE side  2 FE Half crates installed end of June: PRS0 ( SM1 ) PRS3 ( SM4 ) but A2 connector issue  de-cabled / re-cabling What did we learn from this ? + PhoTo

4 FE Installation: 1st Trial  Cabling rate: 1 crate / day … and … Its ‘feasible’ to get boards out after / but in packs of 3-4 …  Traveller Test: Short serie of production Tests  ensure travel was good No surprises!  Hunt RJ45 dead contacts with noise measurements ( VFE noise rules ) With VFE Without VFE inf(  VFE ) > sup(  FE ) Dead contacts: easy to see however repairing a contact can endommage another one … Let’s cross our fingers that the procedure always converges … Final check required when ‘closing the box’ No excess noise with HV up to 650 V

5 VFE POWER ISSUES  3 out of 14 VFE tested end of June seemed to be badly powered : They were left functionnal in may !!!  SM1 bottom box opened … 3 screws damaged in the battle re-plugging power cable on VFE side solved the problem but … no obvious bad connection spotted … Further investigation : Access required !!! Is the problem really mechanical? Never LPC … So what’s about regulator boards? The box SM1 was checked fully functional after closure. And now?  1 RJ45 bad connection spotted on VFE side ( SM4 top ), previously left due to miss-interpretation : … expect others …

6 PS LEDs as Seen with PRS0 FEBs  PS/SPD> CROC / FEBs and LED TSB in PRS0 ( temporary ) steered locally ( CAT / PVSS )  Prototype CU + Final HV : nominal value of 550 V  Steering HV for PMTs, V LED via PVSS (final)  Acquisition with PS/SPD FEB FE-PGA spy-RAMs Test Sequence broadcasted on back-plane by PRS CROC / Triggers - LED TSB - FE-PGA RAM 30 cycles FE-PGA Read Start Signal max t channels Total charge LED TSB : external trigger out not seen (Jumper required?) V1V1 V2V2 V3V3 V4V4 V5V5 Tail

7 Measured Charge, Q, in SM1 NO HV (soft bug) Now Corrected VFE KO (no power?) BOTTOM TOP Max / Min is in Green Half Board Good Bad Evil Nominal HV 550 V Color Map: COLD MEDIUM HOT

8 The Good : SM1-B-VFE01 Stationary  2  G  Q rms on Q Q vs time Q stat. dist. Fluctuation dominated PMT Q 22 hottest coldest hottest coldest 500 evts / Ch. Non uniformity in charge ~5 results from: - Gain ( ~1.7 ) - Illumination Deconvoluate from source non uniformities - Assume cte light / Ch. - Q Density Time ( s ) Q

9 The Good : Timing, Shape & Gain Gain: Max / Min = in global agreement with LPC measurements But +/- 0.2 variations by Ch. Timing: Same t 0 for all Channels But …  varies … Corr = 0.8 with N  -e % Variable shape factors between Ch. rms on  ~10 % fluctuations within a Ch. N  -e  ) ( % )

10 The Bad: SM1-B-VFE03 G   2 / Q Additional noise ‘pollutes’ signal? From LEDs? Gain: 1.6 LPC Q stat. dist. OK coldest hottest  : % OK Pathologic Charge, Q Gain too high 2.1 vs 1.6 Timing & Shape OK Compatible with X-talk Q Density

11 The Evil: SM1-T-VFE02 Multiple peaks Multiple peaks Q: Saturation FE  2  G  Q Q stat. dist. rms on Q Q vs time hottest coldest strangest Fluctuations not dominated PM Q Time ( s ) Q Density Q 22

12 The Evil Continued: V LED Not possible to close the light !!! Strange behaviour of noise with V LED To be investigated further In good cases Signal saturation for SM1-TOP  V LED controlled via PVSS / calibrated with multimeter :  V LED tuned according to SM1-Bottom Nominal value No signal expected Q V LED ( V )  ( Q )

13 Tentative Tests With SPD VFE  DAQ Tests: Pattern injection from SPD VFE / PRS2 FEBs  Read SPD data with FEB : result = OK, but …  LED Tests: Flash SPD LEDs and read with PS/SPD FEBs  Half of the channels have SPD bit inverted ! ‘Mis-understanding between Barcelona & LPC’ Where to absorb it now? Not FEB level conclusion … a suivre … voir Rémi

14 Conclusion  PS/SPD FEB production on good way : C side should be equipped end of July Investigate VFE Powering issues / Dead contacts simultaneously  LED acquisition with FEBs performed in close to final state Further investigate noise / more statistics Investigate V LED behaviour  FE / VFE connection can tested from noise measurements solely but fragile … requires the crate to be sealed after … Fill in the Online Calo Logbook …