THE DESIGN OF POROUS PAVEMENT SHOULDERS AT RICHMOND INTERNATIONAL AIRPORT 33 rd Annual Airports Conference March 3, 2010 – Hershey, PA Presented by: H.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Dr. Wa'el M. Albawwab ECGD4228 Transportation Engineering II Summer 2008 Sat. 15:30-18:30 PM K115.
FAA Eastern Region 34 th Annual Airport Conference March 2, 2011 – Hershey, PA.
2014 AAPA Conference March 11-12, 2014 Curtis Vincent, P.E. Construction Engineer Lyndi Davis Blackburn, P.E. Assistant Materials and Tests Engineer Specification.
Material Properties.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
ROADS. Roads Introduction Transportation engineering is one of the most important branches of civil engineering. Transportation means conveyance of human.
1 Characterization of Granular Base Materials for Design of Flexible Pavements Lulu Edwards, Walter Barker, Don Alexander US Army Engineer Research and.
Pavement Design.
Porous Concrete Pavement Martin B. Covington III,PE Carroll County Government Storm Water Management Program Engineer.
Keith Dorn Jesse Mefford Hunter Shealy ceramics.org.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
A Presentation On Geo Textiles : Perspective from the Construction Sector By D C DE CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED FEDERATION.
PERMEABLE DRAINAGE LAYERS IN AIRFIELD PAVEMENTS
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Surface Drainage CE 453 Lecture 25.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
A SEMINOR ON SOIL STABILISATION Prepared by D.ARUNA.
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Campbell & Paris Engineers, 35.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
The Use of Hot Mix Asphalt for Colorado Trails and Paths Tom Clayton, SET Director of Training And Member Services.
Soil Compaction and Pavement Design
Quality Control Testing
Concrete Mix Design Technician School
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
FNR 402 – Forest Watershed Management
Wes Marshall, P.E. University of Connecticut March 2007
Pavement Analysis and Design
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
SESSION 4 Drainage Design Considerations. Objectives  Identify types of subsurface drainage  Determine need for subsurface drainage  Recognize importance.
Chapter 34 Water On Our World. Hydrologic Cycle.
1 HYDROSPHERE1 INTRODUCTION This unit has three components, The Hydrological cycle and its features. Working with hydrographs and Studying rivers.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Using Reflective Crack Interlayer-
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
AAR-410 February 2, Alpha Factor Determination for 6-Wheel Gears u Gordon Hayhoe, AAR-410, FAA William J. Hughes Technical Center, Atlantic City,
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
6. Drainage basins and runoff mechanisms Drainage basins Drainage basins The vegetation factor The vegetation factor Sources of runoff Sources of runoff.
DARWIN AC/AC Overlay Design. Course Materials Tables and Design Procedures for this manual.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
Manure Storage Systems and Structures Determining environmental impacts of manure storage and storage systems on the farmstead. Joesph Kelpinski, MAEAP.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
GEOTEXTILES IN TRANSPORTATION APPLICATIONS
USE OF GEOGRIDS IN FLEXIBLE PAVEMENT
AIRPORT SURVEYS.
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
California Bearing Ratio
General Road Construction Information
City of San Jacinto 7th Street Pavement Repairs
Presenters: Sumon Roy1 and Badrul Ahsan1
Transportation Engineering-II
Storm Water Storage and Treatment
Alabama Asphalt Pavement Association
Chapter(16) AASHTO flexible pavement design method
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
Pavement Structural Analysis
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
Presentation transcript:

THE DESIGN OF POROUS PAVEMENT SHOULDERS AT RICHMOND INTERNATIONAL AIRPORT 33 rd Annual Airports Conference March 3, 2010 – Hershey, PA Presented by: H. D. Campbell, Jr., P.E. Campbell & Paris Engineers

PROJECT DESCRIPTION THE PROJECT Design and construct a 35’ porous pavement shoulders at RIC along new Taxiways A & E. Design period – Construction period – THE PURPOSE The airport is unable to provide adequate storm water retention areas for the new taxiway paved areas within present property limits. Another method of reducing the storm water time of concentration must be provided. THE SOLUTION Provide 35’ wide porous pavement shoulders along each edge of the new taxiways

DESIGN METHODOLOGY, BACKGROUND & SITE CONDITIONS WADO requests feasibility study for justification approval Post development runoff must not exceed pre development Concerns arise over bird strike potential with existing basins Poor draining soils at the site SOIL MOISTURE AND WATER TABLE FACTORS SC and SM soils throughout site Natural moisture at 15% and above CL layer underlying area creates perched water table Site of War Between the States Battle Field

DESIGN STORM WATER QUANTITY AND QUALITY Intercept first 15 minutes of runoff washing over pavement Limit post development flows to pre development values Maintain quantity/quality of water in existing basins PROVIDE FOD PROTECTION FOR GROUP 5 AIRCRAFT 35’ Shoulder Pavement Protection for Outboard Engines STRUCTURAL DESIGN OF THE SHOULDER PAVEMENT Use 1990s AC 150/5300 for annual 2 passes of 125K dual gear landing gear configuration (250K MTOW dual gear aircraft)

DESIGN STRUCTURAL DESIGN OF POROUS SHOULDER SURFACE No FAA standard in 1990s Surface Course to be P-402 3/4 to 1 inch in thickness with known performance and availability Make up difference in surface course deficiency with stabilized base

DESIGN STRUCTURAL/FUNCTIONAL DESIGN OF POROUS BASE/SEPARATION LAYER Porous base divided into base placed directly below the P-402 and the separation layer placed on the subgrade and below the base course Porous base #57 aggregate stabilized with cement at W/C ratio of 0.37 for structural purposes. The separation layer is #68 non stabilized aggregate Thickness of 17” based on permeability of layers Minimum permeability set for 3000 foot per day (FPD) based on cement stabilized layer Time of concentration for 17” layer at 35’ wide was 17 minutes for a 20 year storm Lateral drains placed at 300’ intervals drain to paved ditch

POROUS SHOULDER CONSTRUCTION

DESIGN FINAL PAVEMENT DESIGN SECTION ¾-1 inch P-402 Porous Friction Course 9 inches AASHTO # 57 Cement Stabilized Aggregate (at at W/C ratio of 0.37) 7 inches AASHTO # 68 Separation Layer PERFORMANCE In service since 1996 with no adverse reports

QUESTIONS? Thank you for your time