Einar Bohlin Regional PDP Report
Proposal topics at the 5 RIRs ARIN portion Q (35) Q (32) Q (50) Q (52) 0 Total
Draft Policies Unique to the ARIN region: – ARIN : Compliance Requirement – ARIN : Combined M&A and Specified Transfers – ARIN : Remove Single Aggregate requirement from Specified Transfer – ARIN : Clarify Justified Need for Transfers – ARIN : Set Transfer Need to 24 months
ARIN XXVIII Draft Policies ARIN : ARIN Inter-RIR Transfers A* ARIN (Global Proposal): Global Policy for post exhaustion IPv4 allocation mechanisms by the IANA LCAA ARIN : IPv4 Number Resources for Use Within Region LCP P = Proposal A = Adopted LC = Last Call * = Panel Discussion
Discussion highlights at the other RIRs IPv4 – Proposal: Reclamation of space that is not routed (AfriNIC) – Last call: Adds needs-based criteria for transfers (APNIC) – Adopted: Requiring a plan for IPv6 (LACNIC) IPv6 – Proposal: End users would not need to be multihomed (RIPE NCC)
References RIRLink Policy Comparison Overview overview
Thank You