DINO Peer Review 13 November 2015 Mechanisms Shilling, Tim Martinez, Michael.

Slides:



Advertisements
Similar presentations
Fluid Power Systems Mill Creek High School Power and Energy.
Advertisements

STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Mechanisms Shilling, Tim Lowrey, Anthony McArthur, Grayson.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
System Identification of a Nanosatellite Structure Craig L. Stevens, Jana L. Schwartz, and Christopher D. Hall Aerospace and Ocean Engineering Virginia.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Team K-TRON Team Members: Ryan Vroom Geoff Cunningham Trevor McClenathan Brendan Tighe.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
April 7, 2008University of Minnesota PDR Satellite Structure Subsystem Structural and Vibrational Stress Analysis Presented By: Chris Matthews.
Critical Design Review Team Name University/Institution Team Members Date.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
L 17 - Thermodynamics [2] Today’s topics –Practical thermal effects –Devices for temperature measurement –Mechanisms of heat transfer Science dealing.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
LISA STUDIES AT THE UNIVERSITY OF COLORADO Michael J. Nickerson, Ellery B. Ames, John L. Hall, and Peter L. Bender JILA, University of Colorado and NIST,
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
T.M.F.T: Thermal Mechanical Fatigue Testing
Thermal Systems Design
Electric Components. Basics 1 Current: electrons moving together in same direction (electrons are always moving in materials like metals but in a random.
Team 4 “Flying Wind Turbine” Jason Landry Bryan MacDonald Scott Montgomerie Daniel Pollock Robert Ringrose Dr. Dale Retallack Team Members Supervisor.
Solar Concentrator Testing Mount Presented by: Sarah Brown Mike Ross.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
Colorado Space Grant1 DINO Safety Review DINO Communications Team: Hosam Ghaith Mike Li Zach Allen.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Thermal Subsystem PDR Josh Stamps Nicole Demandante Robin Hegedus 12/8/2003.
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Mechanical Designs of The Central Detector Jinyu Fu
1 Team Mieux Critical Design Review ASME Bulk Material Transporter AME 470 Ltd. December 7, 2004.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
DINO PDR 24 February 2016 Colorado Space Grant Consortium1 Gravity Gradient Tether Deployment Requirements –11 lb (5 kg) tip-mass must be deployed 65 ft.
Design of a Precision Robot Wrist Interface
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Be P16102 Constrain Subsystems House Internals Provide Access Mount components securely Stow Solar Panels Gather Solar Energy Expose Panels before Deployment.
1 NOTICE: This document includes information that is proprietary to Composite Technology Development, Inc., and is for the sole use the U. S. Government.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
SOAREX VII Mission Design, construct, test, and fly an ultralight (
Telescope - Mechanical
WORKSHOP 11 PRESS FIT CAT509, Workshop 11, March 2002 WS11-1.
Overview 3 2 Introduction Design Analysis Fabrication Testing
Hawkeye Mechanical Design Snapshot
University of Colorado at Boulder January 21, 2004 Boulder, Colorado
Transmission system of Automobile
Structures and Mechanisms - Peer Design Review -
Mechanisms DINO CDR March 13, 2004.
System Identification of a Nanosatellite Structure
Structures March 13, 2004.
Mars Rover CDR Team Name
JOSH STAMPS ROBIN HEGEDUS
Command and Data Handling
Presentation transcript:

DINO Peer Review 13 November 2015 Mechanisms Shilling, Tim Martinez, Michael

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium2 Introduction Mechanisms includes restraints and release for: –COMM Antennas –Aerofins –FITS thin film solar arrays The mechanisms will release the deployables in a predetermined order –Tip mass –Antennas –FITS –Aerofins The restraint mechanisms are based around Planetary Systems’ Lightband, Starsys’ HOP (High Output Paraffin Actuator) and TiNi Aerospace’s Frangibolt

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium3 Requirements Imposed on Mechanisms Must retain mechanisms in a failsafe manner Must release the deployables in a reliable fashion Must release the deployables in the order discussed on the previous slide Must meet power and thermal requirements

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium4 Requirements Imposed on Others 6 Hi/Low lines to signal different stages of deployment –Aerofins Released: 2 –FITS Released: 2 –Boom Released: 1 –Antenna Released: 1 1 HOP requiring 18W at 28V for minutes –Antenna Release Lightband separator requiring 12V for 1 minute (May Change) –Tip Mass Release 4 Frangibolts 28V for 30 Sec –FITS and Aerofins 4 composite hinges requiring 28V for 1 minute –Two per Aerofin –Two Aerofins Thermal control of composite hinges (maintain hinge temperature between 88 and 92 deg. Celsius by cycling power to hinges) –Minimum of two controls, one per aerofin –Requires data lines for two thermal couple (Sampling once per second)

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium5 Lightband 15 inch motorized separation system Delta V = 2 ft/s m ≈ 6.5 lbm Tip-off rate < 1º/s Flight proven –Deployed Starshine-3 satellite from Athena launch vehicle in 2001

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium6 Thin Film Solar Array (FITS) Responsibility Microsat FITS Restraint Panel Deployment Hinges CSGC Restraint/release system hardware General Provided by Microsat Released with the in-house release system (IRS) Preloaded to 100lb Upon Release deployment is almost instantaneous

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium7 Flow Chart - FITS Input and Control Frangibolt V High/Low output (Switch signaling final released position) Frangibolt V High/Low output (Switch signaling final released position)

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium8 FITS System - Stowed Stowed Solar Array Envelope (0.318 x x m) Volume = m 3 / Wing (0.067 ft 3 ) / Wing Deployment Hinge Restraint Panel Separation Device

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium9 Deployed driving requirements - Power - 13 Vdc and 60 Deployed Solar Array 1.10 m 2 / Wing Fold Integrated Thin Film Stiffener (FITS) Stainless Steel CIGS Array 85 Watts BOL - AMO Deployed Solar Array Meets All Requirements m m m FITS System - Deployed

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium10 Frangibolt

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium11 Specifications

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium12 Aerofins General 2 Composite panels Solar Arrays mounted to Panels Deployed with 4 composite hinges from CTD Held down by Frangibolts Deployed separately Responsibility CTD Composite aerofins Composite Hinges (With Mounts) Ability to interface with Restraint/release system hardware CSGC Restraint/release system hardware

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium13 Flow Chart - Aerofins Input and Control Aerofins Frangibolt V Composite Hinges 10 28V per Hinge for 1 minute 2-4 Hinges required High/Low output (Switch signaling final deployed position) High/Low output (Switch signaling final released position) and turns off Frangibolt

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium14 Composite Hinges Provided by Composite Technology Development (CTD) Rigid in cooled State When Heated returns to Original Shape 4 composite hinges requiring 28V for 1 minute

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium15 Aerofin Deployment / Stabilization Major Cone Major Cup Aerofin Minor Cone Minor Cup Side Panel Frangibolt Housing

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium16 Iso~Grid Mounting Minimal reduction in Iso~Grid strength. Central Cup spreads load stress over wider area, reducing flex on Aero~Fin. “Four Point” minor cones provides horizontal & vertical stabilization.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium17 Cup Cones

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium18 Central Cup & Actuator Housing Frangi~Bolt Actuator captive in housing. Two Disc Springs to absorb energy of Frangi~Bolt Release. All Materials 6061 AL

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium19 Central Cone Two Piece Mount (6061 Al) w/ one Disk Spring to absorb energy of Frangi~Bolt Release Disk Spring transmits energy to rear plate, which spreads force over wider area, reducing shock to Aero~Fins. Cone material: Delrin 500

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium20 Disk Spring Data Size & deflection are two Major advantages vs. conventional Spring. Three Spring 0.240in vs. Two standard 2.000in

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium21 Antenna Release System - HOP Pin Puller Less then 120g 50 lbs of force One HOP releases Antennas Total travel of HOP release Pin:.3in Activated with 28V at 18 watts for 2 minutes, which heats up the wax inside the piston, expanding it and causing the pin puller to move

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium22 Testing Plan - Aerofins AerofinStructure SledAir table CTD Hinge Structure Air table Sled

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium23 Testing Plan - Release System Fit test Composite hinges Structural Fangibolt Hanging Weight test Preloading Shock absorption Damage to Hinges? Environment Warm hinge release system deployment Aerofin Structure Sled Air table CTD Hinge Structure Air table

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium24 Parts List In-House Testing equipment FITS Aerofins Release system Outsourced springs Aluminum parts Outsourced Aerofins: Free HOP: Free FITS: Free Arrays Hinges 3 Fringebolt: Free Actuator 6 bolts: $100 each Reset Tool: TBD Tip mass Lightband Tether

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium25 Issues and Concerns (Things to be done) To get to CDR –Complete Prototyping How did the Release systems perform –Testing to insure functionality, at least in std atmospheric conditions –Antenna release design –Documentation –Fits release system, How does Microsat want to deal with the Frangibot?

DINO Peer Review 13 November 2015 Structures Shilling, Tim McArthur, Grayson Schumacher, Ted Ko, Paul Jones, Robert

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium27 Introduction Structures is to interface and house all components onto a common chasse. Structures will protect components from the space and launch environment, including but not limited to vibration, impact and radiation hazards. Structures is to interface to the ICU via Lightband as well as provide interface for the Tip mass. Structures will provide casing and structural connection for all components (Electronics, batteries, solar arrays, ect.)

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium28 Requirements Imposed on Structures Entire Structure with mechanisms will be less then 9.19 Kg Fixed base Natural Frequency > 100Hz at the Shuttle interface plane (SIP). Center of mass is to be no more then.25in from centerline and 12in from the SIP. Structural Ground will be isolated from Electrical Ground Structure must be electrically continuous (less then 1 ohm resistance) Structure will be coated to ensure against electrical shorting The completed satellite must fit within ICU envelope Structures must provide enclosures (As necessitated) and structural support to all electrical components. Structures must provide mounting for surface mounted solar arrays, aerofins, FITS and antennas (As necessitated) Meet all Safety concerns applicable to shuttle flight

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium29 Requirements Imposed on Others All systems will meet allocated size and mass budgets No component may have a width > 8.5in or a height > 11in Components may not be greater then 2in deep without prior approval from Structures and Systems

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium30 ICU Envelope

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium31 Exploded View FITSAerofinsPower Panel COMM Cameras C&DH + ADCS Antenna Release

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium32 Main Structure Mass: 3.52kg Height:12.25in Diameter: 17.32in Material: Al 6061 Similar design to Three Corner Satellite

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium33 Nadir Plate Iso-Grid Design Mounting plate for Lightband systems

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium34 Side Panels

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium35 Finite Element Analysis Analyze the Isogrid structure to get an idea of its performance before building a test specimen. Examine the trade off between total mass and stiffness Requirements –Stiffness: Fundamental frequency > 100 Hz. –Withstand a 20 G force in each direction

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium36 Model Details Global size = mm Tolerance = mm Touching faces bonded Material: Al 6061 linear elastic isotropic Jacobian 4pt check Restraints set as immovable (no translation) Restraints located at each of the 8 mounting wholes 20 G force acting through the center of gravity

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium37 General Drawings Isogrid side Back of panel Isogrid with Outer Plate Isogrid

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium38 Design Options Option in. thick panel with no outer plate - mass = kg - Stiffness = Hz. Option in. thick panel with no outer plate - mass = kg - Stiffness = Hz. Option in. thick panel with 0.05 in. thick outer plate - mass = panel + outer plate = = kg - Stiffness = Hz. Option in. thick panel with 0.05 in thick outer plate - mass = panel + outer plate = = kg - Stiffness = Hz.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium39 Chosen Design Option in. thick panel with no outer plate - mass = kg - Stiffness = Hz. Offered the best trade off between mass and stiffness. Easy to manufacture because one does not have to worry about leaving an outer wall.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium40 Analysis Stress calculated for a 20 G force acting solely in one of the three axis Stress calculated in von Mises stress (N/m^2) Design check plot generated for FOS of 2 based on stress The stress plots also resemble the scaled deformed shape

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium41 Plots for Y Direction Stress Design Check Red < FOS = 2 < Blue

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium42 Plots for X Direction StressDesign Check Red < FOS = 2 < Blue

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium43 Plots for Z Direction StressDesign Check Red < FOS = 2 < Blue

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium44 Plot Interpretation All of the design check plots show the entire panel in blue, meaning that all areas equal or exceed a factor of safety equal to 2 These two types of plots prove the side panel will withstand the 20 G forces

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium45 Issues and Concerns Meshing the structure as a whole, including all side panels, top and bottom plates. Several attempts have been made with multiple problems. How to simulate the boxes attached to the structure. –Point mass or Sheet mass

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium46 Drawing Package

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium47 ADCS + C&DH Box Design

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium48 Camera Box Pieces Outer Box -Holds camera at ? deg angle -Allows access to USB port and power supply -Protects circuit board -- 1/8 in. thick walls Camera Bracket -Secures camera in box -Supports circuit board *** Revision A, Awaiting Final Camera Selection

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium49 Complete Camera Box Full assembly of camera box Complete Assembly -Encloses camera -Mounts to earth facing plate -Holds camera at 30deg angle -Manufacturing done as a short component

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium50 Comm Box Use already designed and tested box Mounting plate allows connection to Satellite isogrid. Constructed of Al6061 and anodized TNC?

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium51 Environmental Analysis

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium52 The Harsh Environment Protection Against: –Atomic Oxygen (AO) –High Energy Protons and Electrons –Debris and Micrometeors –Radiation The Toughest Opponent at ISS orbit

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium53 Atomic Oxygen Increases with the angle of incidence with Earth Decays material in direct contact –The rate of decay is negligible –AO is only a design factor to account for when the mission duration is over a couple years

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium54 High Energy Protons and Electrons Only affects the outer region of the satellite A thin layer of material stops the damage The inflicted amount of decay is negligible over the 6 month mission

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium55 Debris and Micrometeors Material travels at high velocity The impacts are on the scale of a few centimeters These impacts would not infringe upon the satellites operation

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium56 Radiation Factors Solar Activity Cycle Trapped Protons Galactic Cosmic Radiation Solar Flare Protons Solar Flare Heavy Ions Inner Zone Electrons

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium57 Solar Activity Cycle The Sun has a 22 year cycle The cycle was at the 50 year Mauder Minimum in the year 2000 The mission will be launched in 2005 The Solar Cycle reaches a minimum in 2006 The Sunspot Cycle will be low

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium58

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium59 Unimportant Factors Solar Flare Protons Solar Flare Heavy Ions –Only occur during Solar Maximum

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium60 ISS orbit Protection Inner Zone Electrons Trapped Protons –Not a design factor Altitude of mission is much lower than where these two factors cause damage

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium61 Galactic Cosmic Radiation High velocities strip the atoms of their nucleus Varies with the solar cycle At a maximum during the Solar Minimum –At a maximum during the missions duration

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium62

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium63 Galactic Cosmic Radiation Not a factor due to the low ISS orbit of 4000km Mainly attacks DNA –Very harmful to manned missions

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium64 Recommendations To stop radiation –Use the.25 in thick aluminum To guard against Micrometeors, AO, Debris, high and low temperatures and High Energy Protons and Electrons Use the MLI blanket

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium65 Conclusion The damaging effects of the environment are suppressed with the MLI blanket The Radiation is suppressed by the aluminum wall The satellite will function properly

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium66 Early Testing FEA –Based on CAPE requirements –Guidance provided in UN-SPEC-12311, Stress Analysis Guidelines. Envelope Verification Mass Properties Center of Gravity Design checks and manufacturing checks Check fits of every component as it is manufactured and returned from outsourced processing Pre mechanical Integration testing of all components Electrical grounding path –Late in assembly. –Perform after anodizing, but before components are integrated –If it is not right what should we do? Structural tests.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium67 Testing Plans

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium68 Assembly Procedure Design Check with Designer, Maker, Team Lead and Systems Manufacture part Tap all holes (Do Not Helecoil) Check fit with hardware and structure Part Check with Designer, Maker and Team Lead Clean with Alcohol Coat / Anodize –Approve with Team Lead –All Taps plugged –Check part upon return Helecoil Check Fit

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium69 Parts List Outsourced Estimated Fasteners: $.75 = $1500 Anodizing: $500 6 Side panels. 9 x 12.5 x.25in Al6061 plates: $67 NIST 1 Nadir Plates x 17 x.75in Al6061 plates: $100 NIST Aluminum for all casings, boxes, ect (Look at budget for constraints) In House Entire structure, boxes, mechanical interfaces and structural ground support

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium70 Budgeted ComponentQuantity Unit Price Total Price Side Panels15$18.57$ Bulkheads4$130.00$ Boxes30$80.00$2, Fastners2000$0.75$1, Anodizing1$ Total: $5,198.55

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium71 Issues and Concerns (Things to be done) To get to CDR –Complete FEA How is the composite top panel going to effect things? –Boxes Design –Need more concrete info, maybe I should have a 1 on 1 meeting with each team Position –Design decisions on placement to ensure box design corresponds –Documentation –What kind of testing should be done?

DINO Peer Review 13 November 2015 Mechanical Ground Support Equipment The support for assembly.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium73 Purpose Assist assembly of satellite. Allow easy integration of hardware, wiring, mechanisms, side panels. Allow easy transportation. Allow easy accessibility.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium74 Requirements Must be able to move through doors. Must allow side panels to lay out in a “flower” pattern-easy accessibility. Must allow rotation about one axis of at least 45 degrees. Must not endanger the integrity of the satellite or any of its components at any time.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium75 Requirements Met: Axis enables 57 degree rotation in every direction. Satellite or base will each have at least five screw points and will stay attached during rotation. MGSE allows “flowering” of side panels.

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium76 MGSE Measurements

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium77

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium78 Parts List & Pricing

DINO Peer Review 13 November 2015 Colorado Space Grant Consortium79 Issues and Concerns: Cost Stability