Yi Qiang May 11, 2009.  The last week of E05-015 and E08-005.  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Run Plan Document E04-007: Threshold Pion Production.
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Beam Position Monitors MICE CM Harbin January, 2009.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Beamline - Harp stepper motor controller cards, software – in process, Javier - Dispersive and non-dispersive measurement capability? - Ninth dipole, Doug.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Beam Profile Monitor Status Immediate Objective Materials needed Projections Conclusion Anthony Tatum University of North Carolina Wilmington.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E Collaboration Hall A DVCS Collaboration Meeting December 19-20, 2013.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Hall A Collab. Mtg, 6/ 2010R. Michaels, JLAB Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise.
Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, JLab.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Cost Optimization Models for SRF Linacs
Conceptual design of TOF and beam test results
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Status of FMS Refurbishment
Run Coordinator Report for PVDIS (E08-011)
Presentation transcript:

Yi Qiang May 11, 2009

 The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite Hadron detectors were calibrated during the last couple of days.  Switching over to E He(e,e’d)  Major Accesses when beam available: 7 hours ◦ 4 h for R-HRS dead time issue ◦ 3 h for R-HRS bottom VDC HV

 Production with 3-pass beam: 10uA  07:00 – 14:40 Beam study  17:50 – 19:25 Controlled access: fix high dead time caused by crazy R-HRS T8 -> Loose cable  21:20 – 23:00 Reference cell measurements:  23:00 – 24:00 CHL down due to lightning

 Production with 3-pass beam: 10uA  00:00 – 08:00 CHL down due to lightning  01:00 – 06:00 HRS magnets recovery  08:00 – 21:00 Beam study and recovery. Controlled access: ◦ Moved Neutron Detector to 62.5 degrees and 6 m from target ◦ R-HRS busy signal check: ROC8 busy signal -> Workaround with R-HRS un-buffered mode  23:30 BCM problem starts

 Production with 3-pass beam: 10uA  09:00 – 09:30 Controlled access: Rebooting Happex DAQ ROC26  13:15 – 14:30 MCC RF Power Supply Repair. Controlled access: ◦ First attempt to fix BCM ◦ Investigation of ROC8 busy signal  17:30 – 21:50 Controlled access to diagnose R-HRS high dead time and identified it as the after pulsing problem from s2 PMTs. Use multi-hit TDC as a workaround.  Compton Electron-detector Commissioning

 00:00 -12:00 Production with 3-pass beam: 10uA  12:00 – 14:30 Pass change to 2 passes. Controlled access ◦ Investigation of ROC8 busy signal problem ◦ PVDIS DAQ ◦ Fix BCM: faulty DC power supply  16:45 – 21:00 Production with 2-pass beam: 5.5uA  21:00 – 24:00 Reference cell measurements: Empty,

 Production with 2-pass beam: 5.5uA  09:00 – 11:00 DAQ problem, caused by logging onto a incorrect machine  11:00 MCC raster accident happened! Extreme large raster caused the beam hitting the wall of 3He cell. Excessive radiation tripped neutron detector and possibly R-HRS VDC HV.  15:15 – 15:50 BigBite scintillator and wire chamber test  15:50 – 18:30 Controlled access: Fix R-HRS VDC#1 HV by switching to local mode and it is only a tempera work around!

 Production with 2-pass beam: 5.5uA  BigBite scintillator HV test  12:30 – 15:00 BigBite wire chamber HV scan  15:45 – 18:10 Optics and BigBite scintillator HV test  22:30 – 24:00 MCC power supply failure in east LINAC

 00:00 – 07:20 MCC power supply failure in east LINAC  07:20 R-HRS VDC HV tripped  07:24 – 08:30 Production with 2-pass beam and L-HRS only: 5.5uA  08:30 End of E and E  08:30 – 24:00 Cell change and controlled access