Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
May 14th 2004RD42 collaboration meeting1 Results with a CVD diamond at the K2K beam-line Jun Kubota(Kyoto Univ.) RD42 collaboration meeting May 14 th 2004.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
Target & Horns Fluxes were distributed. W/ J-PARC type 2.5 o, 2 o, 3 o. Target cooling evaluation and test Target stress analysis Serious stress analysis.
The JPARC Neutrino Target
Target & Horns A.K.Ichikawa Fluxes were distributed. W/ BNL-type and J-PARC type. Target cooling test Comparison of various carbons Energy deposit on 1.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
NuMI Horn Construction and Testing
Target system for hadron & neutrino beam lines at J-PARC Contents Introduction of J-PARC Target and Target system for hadron beam line Target system for.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
J-PARC PAC Jan Report from the ν-TAC Committee Ewart Blackmore – TRIUMF Neutrino Facility Technical Advisory Committee met twice November 12-13,
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
11 Status of Neutrino Beamline Construction T.Kobayashi IPNS, KEK Jan.8, 2008 J-PARC PAC.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Safety issues for WP2 E. Baussan on behalf of WP2.
Consideration of Baffle cooling scheme
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Beam MC activity A.K.Ichikawa for beam group For more details,
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
LCGT f2f meeting/ICRR, 04/Aug./2011 N. KIMURA Status of the Cryogenics Design N. KIMURA A, S. KOIKE B, T. KUME B, T. OHMORI D, Y. SAITO C, Y. SAKAKIBARA.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
Horns, Hadron production etc. (from hadron production to neutrino beam) A.K.Ichikawa KEK 200/9/26 Study on horns Changing -beam energy Hadron.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
GWADW2011 Elba/Italy, 23/May/2011 N. KIMURA and Y. SAKAKIBARA Present Design of LCGT Cryogenic Payload - Status of Cryogenic Design - N. KIMURA*, Y. SAKAKIBARA**,
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
1 Building Design Progress Dan Wilcox March 2012.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
Future Neutrino Beam in J-PARC Tetsuro Sekiguchi IPNS, KEK 2013/11/12NNN2013, Kavli IPMU1.
Irradiated T2K Ti alloy materials test plans
Performance test of KAGRA cryostat at site
Performance test of KAGRA cryostat at site
Target and Horn status report
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Target R&D for JHF neutrino
Challenges for FCC-ee MDI mechanical design
Superbeam Horn-Target Integration
Beam dump for J-Parc neutrino facility
BGC Collaboration Meeting –
Presentation transcript:

Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items are still conceptual design stage. Which item can be shared or brought to outside collaborators is not yet clear. In this note, some possible items are listed for the first step of cooperation. Here, I assume technical contribution (not financial one). For discussion w/ Eric Zimmerman, 11/Mar/04

Horn –status- Proto-type for 1st horn inner conductor was ordered. Outer diameter is 60mm. Test w/ K2K outer conductor and power supply will be done. Cooling test set up for 1st horn inner conductor have arrived. Test of nozzle will be done. Stress Analysis 1st horn final(?) stress analysis will be done after we fix the nozzle design. 2nd and 3rd horn stress analysis was just started. Inner conductor shape will be optimized.

J-PARC Neutrino Horn System 1st 2nd 3rd 320kA 320kA 320kA

1 st Horn Inner Conductor

Cooling Test setup

Horn Possible contribution items Cooling system test for 2 nd and 3 rd horns. Our set up is rather small system. Coupling of strip lines which can be coupled/decupled remotely. Coupling of water pipe which can be coupled/decupled remotely. Many know-how on parts from the MiniBooNE horn. (bolts, insulators….) (Remote) Alignment system required accuracy ~1mm.

Target current status Effect of radiation is being studied. ~0.26 dpa/yr shrinkage, worse conductivity, swelling are problem. We have a one basic design w/ water cooling. Coaxial two water paths. However water cooling has problems. shrinkage inside container, pressure of instantaneous temperature rise of water Therefore, we started to think about He cooling. Can be operated at rather high temperature, hence lower radiation effect. Coaxial two flow paths. 5 atm. For the compressor, we are onsulting cryo. group at IPNS, KEK Cooling path material Start basic designing w/ Al, Ti and C/C composite Insulator from horn(~1kV) Start thinking about ceramics and plasma sprayed alumina.

horn Graphite target flow

Remote Maintenance Side View Top View Disconnect Horn and it’s support structure including strip-lines. Is this realistic? Residual radiation level should be checked. Anyway, we need remotely connectable/dis-connectable cuppling For strip-lines and water pipes.

DV collimator Need cooling Almost no work yet.

DV window Strategy If we put a DV window, it might be broken by heat load. Cooling is also problem. Since the target station will be filled with He, DV window is not necessary during operation. However, w/o window, each time we open the target station, He inside DV must be released. It will need time and cost. Therefore, we are planning to make a movable window which opens during operation and be closed during maintenance at the target station. The window must withstand the evacuation of the target station and DV. The window must be installed from upside.

K2K DV window

Muon Monitor J. Kamda(KEK) has been working on muon monitor. But he will move to ICRR. TRIUMF has an interest on a diamond detector. In addition to these solid detectors, ionization chamber should be installed. For muon monitor, presentation by J. Kameda at NBI is useful. (