Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
Transportation Department Presentation to: Consolidation of Services Study Commission, Transportation Subcommittee August 22, 2005.
Localized Programming Models for Small Cities: A Case Study of Tehachapi, CA 2012 ITE Western District Annual Meeting Santa Barbara, CA June 27, 2012 Localized.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
Congestion Management System The Mobility Management Process.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
Presented by: SAGE KAMIYA, P.E., PTOE
TRAFFIC ENGINEERING DIVISION
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Consolidation Commission - Transportation Sub-Committee City of Orlando Signalization Presentation September 8, 2005.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Red Light Safety Camera Program Update Presented by Public Works Department Traffic Engineering Division Board of County Commissioners June 19, 2012.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E.
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
Presentation to the Orange County-City of Orlando Consolidation of Services Study Commission Transportation Committee Meeting September 8, 2005.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
Columbus Computerized Traffic Signal System Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department Where have we been? Where.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
NCHRP Synthesis 458: Roadway Safety Data Interoperability Between Local and State Agencies Presented to ATSIP TRF 2014 Presented by Nancy Lefler Vanasse.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
I-4 ULTIMATE DESIGN PRESENTATION TO THE VOLUSIA TPO AUGUST 21, 2012 FDOT Contact: John Zielinski (407)
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
MetroPlan Orlando Board Meeting Agenda Briefing Office of Regional Mobility NOVEMBER 11, 2014.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
1 Update on the Congestion Management Process (CMP) and Related Data Activities Wenjing Pu COG/TPB Staff Travel Management Subcommittee Meeting May 26,
Traffic Management System Status Update February, 2008.
Neighborhood Traffic Management Program (NTMP) Background The NTMP program was develop to promote and maintain the safety and livability of local residential.
Public Safety Radio System Upgrade & Reband Presented to the Board of County Commissioners September 9, 2008.
Orange County Public Works Board of County Commissioners Presentation June 16, 2015 Board of County Commissioners Presentation June 16, 2015 Roadway Median.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
1 Briefing on the TPB Transportation Planning Process Certification Summary Report Sandra Jackson Federal Highway Administration Transportation Planning.
SunRail Overview and Joint Use Agreement Board of County Commissioners February 15, 2011.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Addressing Freight in the Planning and Programming Process presented by Jim Brogan Cambridge Systematics, Inc. July 11, 2001 FHWA Freight Planning Workshop.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION Crash Cushion and Guardrail Approach Terminal In-Service Performance Evaluation.
Traffic Management/Safe Walk Routes January 21,
FDOT D5 – Integrated Corridor Management Program
Traffic Management System Real Time Motorist Information
Project Overview – Phase 1
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Transportation Research Board 2004 Annual Meeting
Presentation transcript:

Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005

Presentation Outline Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions

Presentation Outline Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions

Orange County Traffic Signal Operations Division Overview

Orange County Traffic Operations Division 527 Traffic Signals – 341 Coordinated Signals along 41 Corridors – Timing Plans Updated Every 3 Years Maintain 6 Signals for City City maintains 6 signals for Orange County 55 Warning Beacons 95 School Flashers 68 Speed Radar Signs

Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions Presentation Outline

History 1985 first Metropolitan Orlando Signal System (MOCSS) installed First Phase 113 mostly CBD intersections Second Phase 240 intersections Orange County added 60 signals Winter Park and Maitland added 7 signals each

History 1995 MOCSS system suffers obsolescence FDOT provides funds to upgrade Regional Computerized Signal System (RCSS) to City of Orlando 2000 City issued RFP for Regional Computerized Signal System FDOT, Orange County, Seminole County participate in evaluating proposals

History City selected Naztec, Inc. for (RCSS) certified by FDOT, member of ITE and IMSA Orange County selected Eagle Traffic Control Systems member of National Electrical Manufacturers Association (NEMA), certified by ITE, ITS, AASHTO and FHWA. Both Naztec and Eagle are good products;

History 2000 Orange County installs SCOOT adaptive system on International Drive – 27 signals today – 47 by next summer 2000 FDOT provides funding to Orange County for signal system upgrade Orange County takes Proactive Approach to Signal Timing and Coordination Hires Engineer specifically to address traffic signal timing coordination

Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions Presentation Outline

Agreements Memorandum of Understanding thru FDOT MetroPlan Orlando ITS Subcommittee District 5; FDOT Traffic Signal Maintaining Agency Group FACERS - Florida Association of County Engineers and Road Superintendents

Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions Presentation Outline

Existing Efforts $ 7.5M grant from FDOT in 2000 to: Facilitate sharing traffic information between FDOT and Central Florida counties and cities Expand fiber-optic communication Upgrade traffic management center Upgrade traffic signal system Improve traffic monitoring system Install traveler information system Provide better responsiveness to roadway incidents

Existing Efforts Phase 1A Layout

Existing Efforts County developed a comprehensive annual signal coordination program Proactive approach to correct potential operation problems before citizen complaints are received Studies considered adjacent signals ignoring jurisdiction ownership Success of the system is realized Coordination of systems is real – limited by congestion and existing intersection capacity

Existing Efforts Signal Management Districts

Existing Efforts Countywide Traffic Network

Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions Presentation Outline

Use of Technology Signal Timing Optimization Software Traffic Simulation/Animation Software GIS Background Map Electronic Counting Boards Traffic Management Software GPS Travel Time Surveys

Use of Technology Products Used

Orange County Traffic Signal Operations Division Overview History Agreements Existing Efforts Use of Technology Program Cost Conclusions Presentation Outline

Program Cost Initial Cost:$ 5,000 – Purchase Synchro, SimTraffic & GPS unit Annual Cost:$20,000 – Collect volume and geometry data – Survey existing traffic control devices Exploit Available Resources:$ 0 – 20 to 25 staff hours per intersection

Conclusions County and City have established informal agreements to coordinate maintenance and operation of traffic signals There is a perception that traffic signals are not coordinated The real problem is congestion and not enough intersection capacity The County is committed to improving mobility, safety, fuel efficiency, and air quality Since 2000 the number of timing complaints in the County has significantly decreased

Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005