SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Management’s preliminary comments to the ERC Report.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
1 Troop Annual Program Chesterfield Missouri Troop 848 Highcroft Ridge Elementary School PSO XX tags :: BSA, Boy Scouts, Troop 848, Annual.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mechanical issues SPL cavities/cryomodules: Objectives V.Parma Mini-workshop on Mechanical issues SPL cavities/cryo-modules, CERN 30th September 2009.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
Linac4 Status 1 M. Vretenar sLHC public event
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
SUMMARY ON THE SPL STUDY COLLABORATION R. Garoby – 12/12/2008 First SPL Collaboration Meeting December, CERN.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
The CERN Linac4 history, performance, perspectives
CERN – Zanon discussions
Oleksiy Dolinskyy December 1st, 2014
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Plans for a Superconducting Proton Linac at CERN
Second SPL Collaboration Meeting, Vancouver May 2009
on behalf of the RF group
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hosting Orsay Walid KAABI
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
The HL-LHC project: info day for industry
10/month is the present production rate 2 FTE + sporadic contributions
ESS RF Development at Uppsala University
Superconducting RF Crab Cavities
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HIE-LINAC status report
Report on HIE-ISOLDE Status
The Transformation of A Small Company Into A Golden Legend
Overall time schedule of SRF activities
SNS-PPU upgrades the existing accelerator structure
HT 1 (3rd September – Friday 25th October, weeks) HT 2 Wk1 Wk2 Wk3 Wk4
Presentation transcript:

sLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009

SPL News… Additional resources have been reserved in CERN budget for the years to properly fulfil the goals of the SPL study: Design, construction and characterization of superconducting cavities (8 of them under direct CERN supervision, with processing at CERN), Construction and assembly of a complete cryomodule, equipped with 8 b=1 cavities, Upgrade of the SM18 test place for testing simultaneously at high RF power multiple cavities in the cryomodule, at their nominal operating temperature of 2 K, Development towards the H - ion source of the SPL, Design of the architecture of the SPL RF system, Study of Civil Engineering and General Services for estimating construction costs. sLHC

SPL News… This is the 3rd technical workshops in 2009: November Workshop on cryogenic and vacuum sectorisations of the SPL Workshop on cryogenic and vacuum sectorisations of the SPL September Mechanical issues SPL cavities/cryomodules Mechanical issues SPL cavities/cryomodules June SPL HOM workshop SPL HOM workshop April Status of analysis of SPL RF frequencies and cooling temperature Status of analysis of SPL RF frequencies and cooling temperature sLHC

SPL News… It will be followed by the 3rd SPL collaboration meeting: November rd SPL Collaboration Meeting 3rd SPL Collaboration Meeting May nd SPL Collaboration Meeting2nd SPL Collaboration Meeting December st SPL Collaboration Meeting 1st SPL Collaboration Meeting finishing with the 1rst meeting of the SPL Collaboration Board. sLHC

SPL News… To meet the deadline of 2012, activity will be especially intense in the next 12 months. Prototypes must be launched, SM18 test place must be upgraded… The outcome of this workshop will be essential to help refine the SPL design: YOUR CONTRIBUTION WILL BE VERY IMPORTANT! THANK YOU FOR BEING HERE WITH US. sLHC