September 19,2006 TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Trigger Silicon Layer O Online L3/DAQ.

Slides:



Advertisements
Similar presentations
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Advertisements

Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
DZero RunIIb Director’s Review February 3, Run IIb Project Status Vivian O’Dell.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
Electroweak Physics at the Tevatron Adam Lyon / Fermilab for the DØ and CDF collaborations 15 th Topical Conference on Hadron Collider Physics June 2004.
Nick Hadley Maryland DØ Effort Maryland DOE Review August 30, 2005.
Open Meeting on LHC Ideas for a Physics Analysis Center Open Meeting on LHC Ideas for a Physics Analysis Center Fermilab, September 4, 2003 Regina Demina.
September 1, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons G. Bernardi D. Denisov.
January 26,2007 D0 Collaboration Organization TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Online.
July 7, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, C. Schwanenberger Physics Groups Spokespersons G. Bernardi D. Denisov.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
9/14/2001D0 Simulation Tasks Q.Li 1 Simulation Tasks Status Qizhong Li Fermilab Sept. 14, 2001 D0 Collaboration Meeting.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
Aug 1, 2009 D0 Collaboration Organization TeV Working Groups Physics A. Juste Physics Groups Spokespersons D. Denisov S. Soldner-Rembold Production Speakers.
August 27,2007 D0 Collaboration Organization TeV Working Groups Physics A. Juste, S. Soldner-Rembold Physics Groups Spokespersons D. Denisov D. Wood Production.
Aug 2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons G. Blazey T. Wyatt Trigger Silicon Layer O Online L3/DAQ Trigger.
December 28, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
September 1, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
SIST 2004 SIST Ayodele Onibokun August 10, 2004 Based on the code developed by: Henry Barnor, Fermilab Summer Student D ø Calibration Database Browser.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
L3 Filtering: - short- and medium term plans - how you can help out All-D  Meeting: 14 th March 2003 Terry Wyatt (FNAL-CD/Manchester) on behalf of the.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
The Online Central Tracker of D0
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
1 Silke Duensing DØ Analysis Status NIKHEF Annual Scientific Meeting Analysing first D0 data  Real Data with:  Jets  Missing Et  Electrons 
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
March 15,2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons T. Wyatt D.Denisov Trigger Silicon Layer O Online L3/DAQ.
The DØ Silicon Track Trigger Wendy Taylor IEEE NSS 2000 Lyon, France October 17, 2000  Introduction  Overview of STT  STT Hardware Design u Motherboard.
Levan BabukhadiaICHEP02 – 31 st International Conference on High Energy Physics, Amsterdam, 24 – 31 July, 2002 CHEP02 – 31 st International Conference.
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
10/24/2003Yu Chul Yang(CHEP,KNU) Accelerator & Detector 1.Accelerator 2. Tevatron 3. Detector 4. CDF Detector.
September 1, 2014 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons D. Denisov P. Grannis.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
20 April 2002Bill Lee APS 1 The D0 Silicon Track Trigger Bill Lee Florida State University.
Research Program Brendan Casey DOE Annual Program Review September
DØ and CDF Detectors/Computing Bill Lee Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Search for Standard Model Higgs in ZH  l + l  bb channel at DØ Shaohua Fu Fermilab For the DØ Collaboration DPF 2006, Oct. 29 – Nov. 3 Honolulu, Hawaii.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Calorimeter Status Electronics Installation and Commissioning
Kevin Burkett Harvard University June 12, 2001
Presentation transcript:

September 19,2006 TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Trigger Silicon Layer O Online L3/DAQ Trigger Subdetectors Run IIb Upgrade DAQ/Online Installation Production Run Coordinators Speakers Bureau Chair: H. Wahl Advisory Council Chair: H.E. Fisk Institutional Board Chair: J.-F. Grivaz H. Schellman Algorithms Groups Executables Editorial Boards Online Monitoring Analysis Public Tour Area and Tours G. Snow D. Lincoln Data Quality Technical Integration Coordinator G. Ginther Software Algorithms M. Hildreth E. Varnes (Deputy) Computing and Core Software B. Abbott Special Projects Subdetectors D0 Collaboration Organization AFEII Trigger Board Authorship Committee Chair: A.Jonckheere

September 19,2006 Joint CDF/DØ Tevatron Physics Working Groups Spokespersons Triggermeisters J. Leveque G. Otero Trigger Board Chair: M.Verzocchi Physics Coordinator J. Hobbs R. Van Kooten B Physics H. Evans New Phenomena V. Büscher J-F. Grivaz QCD M. Zielinski Tevatron Electroweak Working Group S. Eno M. Grünewald A. Juste Higgs N. Varelas Physics Organization CDF Luminosity G. Snow Common Samples H. Greenlee Y. Sharyy B Physics B. Casey A. Zieminski Higgs G. Bernardi A. Khanov New Phenomena J.-F. Grivaz Yu. Gershtein QCD D. Brown V. O’Dell Top U. Heintz L. Shabalina M. Weber Electroweak A. Askew T. Bolton Editorial Boards Jet Energy Scale A. Juste A. Kupco Run Coordinators Trigger Studies Group M. Hohlfeld S. Lamers

September 19,2006 Run IIb Project V. O’Dell, Project Manager R. Lipton, Deputy PM T.J. Sarlina, Assistant PM M. Johnson,Technical Coordinator D. Knapp, Budget Officer S.Wright, Adminstration Trigger Installation D. Edmunds L. Bagby Silicon Installation Mechanical: W. Cooper Electrical: L. Bagby Readout K.Hanagaki R. Sidwell Sensors M. Demarteau R. McCarthy Mechanical Design & Fabrication W. Cooper Detector Modules & Integration L. Bagby Installation DAQ/Online S. Fuess Silicon Layer 0 A. Bean (R. Lipton) Technical Organization Simulation E. Barberis, M. Hildreth Spokespersons T. Wyatt, D. Denisov —————— Trigger Coordinator: N. Varelas Administration (A. Bean) Network & Host Systems J. Fitzmaurice DAQ/Online Management (S. Fuess) L3 Systems G. Watts Control Systems F. Bartlett G. Savage V. Sirotenko Trigger D. Wood L1 Track Trigger M. Narain D. Lincoln L1 Cal Upgrade M. Abolins H. Evans L1 Cal/Track Match K. Johns L2  upgrade R. Hirosky Silicon Track Trigger U. Heintz Administration (D. Wood) Technical Integration Coordinator G. Ginther Special Projects M.Johnson Data Quality S. Kappler M. Ford Detectors Muon: T. Diehl CFT/PS: M. Corcoran SMT: M.Kirby CTT: M.Corcoran Cal: J.Sekaric, L. Zivkovic L1CAL: S. Cihangir Lum: G.Snow FPD: M.Begalli RecoCert Manager: D. Lam Run Coordinators W. Lee, T. Yasuda Electrical Operations: M. Cherry Mechanical Operations: R. Rucinski Online W.Lee Luminosity Monitor Y.Enari FPD A. Brandt L3/DAQ A. Garcia-Bellido G. Watts Global Monitoring E. Cheu SMT D.Tsybychev M. Kirby Fiber Tracker/ Preshowers J. Warchol —————— CFT J. Warchol CPS A. Magerkurth FPS A. Patwa Calorimeter N. Buchanan J.Sekaric (Deputy) —————— L1 Cal S. Cihangir D. Edmunds S. Lammers M. Mulhearn ICD A. White Central Muon A. Ito —————— PDT’s M. Wobisch P. Kasper Trigger counters G. Safronov A. Ito Forward Muon A. Schukin —————— MDT detectors V. Tokmenin MDT Electronics P. Neustroev Pixel detectors V. Bezzubov Pixel electronics T. Fitzpatrick Solenoid L1 CTT M. Buehler R. Mommsen L1 Muon J. Temple L2 M. Kopal AFEIIt A. Bross P. Rubinov TripT L. Bellantoni AFEII P. Rubinov Code Development TBA L2STT U. Heintz

September 19,2006 Computing and Core Software Computing and Core Software B. Abbott Computing Planning Board Chair: D.O’Neil Spokespersons MC Production J. Snow JIM/Runjob/d0tools/d0rte/SAM Integration I. Bertram Code Development Infrastructure & Builds A. Jonckheere Online/L3 B. Lee SAM Liaison S. Fu Databases J.Linnemann, I.Mandrichenko Offline Shifts D. Zieminska Data Processing Infrastructure M. Diesburg, D. Wicke Clued0 TBD Central Systems J. Boyd Analysis Tools R. Illingworth, A. Lyon User Requirements S. Hagopian Analysis Production

September 19,2006 Calorimetry (Calgo) P. Verdier K. Peters Muon B.Tuchming M. Eads Tracking (Tralgo) M.Strauss P. Ratoff R. Lipton Calibration/ Databases T. Yasuda Integration with Physics groups Software Algorithms Software Algorithms M. Hildreth E. Varnes (Deputy) Reconstruction Q. Li Level 3 filtering D. Bauer R. Jesik ExecutablesAlgorithms Groups Generators D0GSTAR D0SIM PMCS Global Vertexing DooKee Cho Event display (L. Duflot) Calibration: J. Stark CAL/ICD: TBD CPS: A. Magerkurth FPS: A. Patwa EM ID: TBD  ID: O. Atramentov, Yu. Maravin  ID: A. Patwa, S. Protopopescu Jet ID: M. Andersson ME T ID: P. Verdier E-flow: A. Goussiou Spokespersons b tagging A. Haas TBD Simulation T. Adams M. Wobisch T. Kuhl MC Request Coord. T. Adams MCMeisters: R. Bernhard, TBD