Operations Philip Edwards Head of Science Operations 28 October 2008.

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

Science Operations Phil Edwards 11 June 2013 CSIRO ASTRONOMY & SPACE SCIENCE.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Science Operations Phil Edwards Head of Science Operations CSIRO ATNF.
E-VLBI progress in the South Tasso Tzioumis ATNF, CSIRO September 2006 “Towards e-VLBI”  “e-VLBI”
ATNF Science Priorities: 2010 – 2015 Ball, Braun, Edwards, Feain, Hobbs, Johnston, McClure-Griffiths.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
ATNF Scientific Software – an overview Mark Wieringa – ATNF/Operations/SCA.
Mopra Operations Balt Indermuehle 13 June ATNF Mopra Operations What’s new at Mopra Telescope Operating Alerting Device Gotta love the TOAD! Mopra.
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
The SOC Pilot Project: MALT-90 Jessica Chapman CASS Observatory Operations Research Program Leader 9 September 2010 MALT90 Project – Presented and edited.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Science Operations Philip Edwards Head of Science Operations 26 May 2010.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Engineering Operations: Parkes Development Projects Erik Lensson, SMIEEE, mSMPTE Head, Engineering Operations 29 October 2009.
ATUC meeting Director’s Report Lewis Ball May 2009 GASS Image McClure-Griffiths & the GASS team.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
Science Operations Philip Edwards Head of Science Operations 29 October 2009.
ATUC meeting Director’s Report Brian Boyle November 2007.
ATUC Meeting, 14 May 2009, Astro Issues Robert Braun.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
CABB update Philip Edwards Head of Science Operations 14 October 2010.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Science Operations Phil Edwards 11 July 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
Australia Telescope Users Committee Technologies Report - Oct 2008.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
1 Australia Telescope Compact Array Visitors Centre.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback.
Australia Telescope Users Committee - Technologies Report - May 2008.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Science Operations Phil Edwards | Head of Science Operations
Australia Telescope Compact Array
Director’s Update AT Users’ Committee -- November 2016
Paul Wild Observatory at Narrabri
MPIfR Results from the A. Chippendale ATUC, 14 Nov 2016
ATCA/Mopra report Phil Edwards ATUC meeting 6 November 2007
Australia Telescope Users Committee Technologies Report – October 2011
EVLA Operations Jim Ulvestad
Onsite Training at JLab
Presentation transcript:

Operations Philip Edwards Head of Science Operations 28 October 2008

Telescope Operations & Science Services Computer Infrastructure Scientific Computing & Archives Visitor services Receivers, LO & Conversion Digital & Servo Electronics Cryogenics Mechanical, Drives, & Electrical Science Operations Engineering Operations National Facility Operations ATNF Operations Structure

CSIRO. ATUC report: ATNF Operations Operations: Themes, Streams and Projects Structure ATNF Operations : Theme, Streams and Projects Structure Theme Leader: Dave McConnell (Assistant Director: Operations) Research Program Leader: Jessica Chapman Engineering Operations Stream Leader: Brett Dawson Science Operations Stream Leader: Phil Edwards Telescope Ops & Sci Services (TOSS) Computing Infrastructure (CI) Science Computing & Archives (SCA) Visitors Services (VS) Digital, Servo & Electronics (DSE) Receivers, LO & Conversion (RLOC) Cryogenics (CRYO) Mechanical, Drives, & Electrical (MDE) Project Leader P. Edwards (N) K. Brooks (M, 0.5) J. Chapman (M) B. Hiscock* (N) B. Indermuehle (N) S. Mader* (P) C. Phillips (M) J. Reynolds (P) J. Sarkissian (P) A.Tzioumis (M) R. Wark (N) System Scientist (P) System Scientist (N) Project Leader S. Amy (M) B. Lennon (N) V. McIntyre* (M) G. Spratt (P, 0.8) Comp. support (M) Project Leader M. Wieringa (N) D. Brodrick (N, 0.5) M. Calabretta (M) S. Hoyle* (P) A. Kosmynin (M) S. Mader* (P) M. Marquarding (M, 0.2) V. McIntyre* (M) E. Troup (N, 0.5) Project Leader V. Drazenovic (M, 0.7) J. Cole (P) J. Hockings (P) J. Houldsworth (N, 0.6) S. Ingram (P) E. Kachwalla (M, 0.5) M. McFee (N) M. Rees (N) C. Wilson (N, 0.6) Casuals P. Alexander (N) D. Brennan (N) C. Cummins (Mopra) S.J. Dodd* (N) R. Kelly (N) P. Kelly (N) CPS support A. Evans (P) L. Williams (P) B. Wilson (P) Project Leader P. Mirtschin* (N) M. Hill* (N) B. Hiscock* (N) S. Hoyle* (P) A. Hunt* (P) S. Munting* (N) B. Preisig* (P) T. Ruckley (P) Technician (N) Technician (P) Project Leader J. McFee (N) P. Mirtschin* (N) S. Munting* (N) K. Reeves* (P) M. Smith (P) Engineering grad (N) RF Systems (P) Project Leader J. Wilson* (N) K. Reeves (P) B. Tough (N) Project Leader T. Wilson (N) J. Crocker (P) M. Hill* (N) A. Hunt* (P) T. Lees (P, 0.6) C. Leven (N, 0.1) B. Preisig* (P) T. Ruckley* (P) G. Sunderland (N, 0.7) B. Turner (P, 0.6) N. Webster (N) Casuals S. J. Dodd* (N) Antennas position (N) Site Managers & Technical Coordinators Parkes B. Dawson (SM) B. Preisig (TC) Narrabri and Mopra B. Hiscock (SM &TC)

CSIRO. ATUC report: ATNF Operations End of an era…

CSIRO. ATUC report: ATNF Operations Science Operations Telescope Operations and Science Services TAC met; schedules for 2008OCTS out; ATS Project Submitted Joint TOSS/SCA/CI discussions on (i) use of VNC for remote observing, (ii) Fault Reporting Commissioning of new receivers at Parkes Discussions of observing support, ATCA calibration Appointment of ATCA and Parkes System Scientists 8 th ATNF Synthesis Imaging School Need to raise awareness of NAPAs? Science and Computing Archives Meeting on Parkes computing & software Joint Operations/ASKAP meetings held Streamlining of Operations Trac/wiki On-going software development

CSIRO. ATUC report: ATNF Operations Science Operations Computer Infrastructure Welcoming new members! Office changes at Marsfield New Marsfield servers and storage New servers at Parkes and Narrabri Visitors Services Meeting of all Visitors Services staff Purchase of software for bookings management Office changes at Marsfield Increased lodge security at Narrabri Need for additional Quarters support at Parkes

CSIRO. ATUC report: ATNF Operations Engineering Operations Receivers, LO & Conversion Parkes MMB problems New Parkes 13mm receiver New Parkes MHz receiver New OMTs for ATCA L/S Consideration of streamlining the Parkes receiver fleet Digital & Servo Electronics Parkes Equipment Control & Monitor Project Parkes Drive Control System Project Installation of interim CABB system Upgrade of ATCA seeing monitor

CSIRO. ATUC report: ATNF Operations Engineering Operations Cryo Compressor upgrade plans Cross-site familiarity & awareness Mopra L/S overhaul Mechanical, Drives & Electrical Investigation and improvement of Mopra power Parkes focus cabin translator Possibilities for Mopra subreflector cycling New staff member at Parkes

CSIRO. ATUC report: ATNF Operations Site Managers & Technical Coordinators Brett Hiscock (Narrabri Site Manager & Technical Coordinator) Brett Dawson (Parkes Site Manager) Brett Preisig (Parkes Technical Coordinator) Site Manager Chair OH&S committee Security and other local issues Represent local staff Technical Coordinator Liaise with EO and SO for maintenance periods Maintain oversight of faults and breakdowns

CSIRO. ATUC report: ATNF Operations Tour of the Facilities

CSIRO. ATUC report: ATNF Operations First Science with the Parkes 13mm receiver First Observation New detection of H 2 O Maser. Observation carried out by Jose-Francisco Gomez and his P616 team. First science with the new 13mm receiver was the detection of a new post- asymptotic giant branch star, a very rare and short-lived class of object. Data provided courtesy of Jose-Francisco Gomez et al. Plot prepared by Stacey Mader.

CSIRO. ATUC report: ATNF Operations Observations of a strong Ammonia source, G showing strong (1,1) and (2,2) transitions. Removing baseline ripple The plot shows two observations taken one after the other, the first (upper panel) with no special 'de- rippling' measures, the lower taken in a mode where the receiver is moved cyclically up and down to 'smear out' the ripple. In the observation for the lower plot the receiver was moved up and down in time with a sawtooth pattern, with amplitude 6.3mm peak- to-peak (lambda/2) and period 60 seconds. Integrations were 4 minutes (exact multiple of 60 seconds). Experiment carried out and data provided by John Reynolds.

CSIRO. ATUC report: ATNF Operations ATCA Installation of interim CABB system continuing Shutdown March/April 2009 for full CABB installation Upgraded seeing monitor installed NASA tracking continuing, at lower level than nominal 10 hr/wk ATCA calibration (esp. in mm bands) being addressed Poor image rejection in parts of mm bands being understood Synthesis School held 29 Sep to 03 Oct New Systems Scientist, Jamie Stevens, to start in January Who do I call? Support can be requested at time of proposal Support during the day from local staff After hours support provided by DA

CSIRO. ATUC report: ATNF Operations Synthesis Imaging School 2008

CSIRO. ATUC report: ATNF Operations Mopra Power problems throughout the winter season Mm observing ends Nov 4, recommences Jan 29 Remote observing now run over VNC sessions First 7mm observations undertaken Testing of remote observing to Marsfield and further afield Mopra Milky Way Survey meeting Nov 3 Who do I call? Support can be requested at time of proposal Support with schedule preparation in Marsfield Support during the day from local staff First contact for after hours support is the DA

CSIRO. ATUC report: ATNF Operations Tidbinbilla Understanding between ATNF and ICTC for continued use of facilities at the CDSCC for radio astronomy Service observations for single-dish radio astronomy to be announced in ATNF Call for Proposals In last 6 months, 146 hrs of single-dish Tid time used for four proposals Proposals reviewed by TAC ATNF contact to liaise with CDSCC Radioastronomy Engineer Use of CDSCC facilities for VLBI to continue

CSIRO. ATUC report: ATNF Operations LBA Operational issues Swinburne contract for correlation completed New contract with Curtin from Oct 1 New contract provides enhanced support for scheduling and calibration. eVLBI production observations have commenced Hartebeesthoek polar shaft bearing failure: impact on LBA observations. Addition of TIGO and O’Higgins in November session In the future Curtin computer cluster at ATCA will augment eVLBI to 1 Gbps from ATNF antennas. more network data transfers for faster turn-around. Less pressure on disks Auckland 12m telescope officially opened Oct 2008

CSIRO. ATUC report: ATNF Operations Operations summary Continued discussion of Future ATNF Operations internally and within community Formal change of management structure July 1 st Project plans submitted to ATNF Project Review Board Synergies in Operations/ASKAP software requirements Improving configuration management Planning for SOC continuing Increased ATNF-wide thinking