City of San Mateo Flood Control Efforts & Needs
Preliminary FIRM (2008)
Completed Capital Projects ($22.7M) SM Creek South Levee Wall – ($1.2M)Completed 2001 Raising of Norfolk Bridge – ($1.9M)Completed 2002 Caltrans Culvert – US101/3 rd Ave – ($10M)Completed 2004 SM Creek North Levee Wall – ($730k)Completed 2005 O’Neill Slough Tide Gate & Levee – ($1.5M) Completed 2007 South Bayfront Levee Project – ($7.4M)Completed 2011 South Levee Project Creek Floodwall and Railing Seal Slough hydro-seeding/erosion control
Resultant FIRM (2012)
Remaining Capital Projects ($22.35M) Raise North Levee at Coyote Point Beach ($7.35M) Rehabilitate Pump Stations at Poplar Avenue ($7.5M) Coyote Point ($7.5M)
If areas were re- mapped to reflect rising sea level…..
City of San Mateo Flood Control Efforts & Needs