GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.

Slides:



Advertisements
Similar presentations
Legal Meetings: Extended Instructions on Movica and Screencast.
Advertisements

Overview Payback Analysis NPV
Title: ICON L0 from MOC to SOC automation Author: MOC/SOC Resides: SOC Description: This is a script that copies the ICON L0 files from the MOC to the.
GIST 19: GGSPS Planning GGSPS Development & Review Planning Andy Smith GGSPS software project manager.
A Presentation Management System for Collaborative Meetings Krzysztof Wrona (ZEUS) DESY Hamburg 24 March, 2003 ZEUS Electronic Meeting Management System.
ERA UPDATE ACERA November 6 th and 7 th Items 2  Status  Operations and Maintenance  Corrective and Adaptive  Data at Rest  Q&A November 2012.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
NOAO/Gemini Data workshop – Tucson,  Hosted by CADC in Victoria, Canada.  Released September 2004  Gemini North data from May 2000  Gemini.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
DATABASE MANAGEMENT SYSTEMS 2 ANGELITO I. CUNANAN JR.
1 CSE 403 Reliability Testing These lecture slides are copyright (C) Marty Stepp, They may not be rehosted, sold, or modified without expressed permission.
Upcoming Enhancements to the HST Archive Mark Kyprianou Operations and Engineering Division Data System Branch.
Plans for interim data release J E Russell (Imperial)
ClimDB/HydroDB (ClimHy) Integration ClimHy has been migrated from AND to LNO and will remain status quo in 2011 – Public page (
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Best Western Green Bay CHEMS 2013 SYSTEM ARCHITECTURE.
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
AGATA Pre-processing team report AGATA Week, July 2008.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
08/30/05GDM Project Presentation Lower Storage Summary of activity on 8/30/2005.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
THORPEX Interactive Grand Global Ensemble (TIGGE) China Meteorological Administration TIGGE-WG meeting, Boulder, June Progress on TIGGE Archive Center.
Data Release Requirements, decisions and plans. What we need New machine Implement (and test) all proposed changes from current Provide data quality summary,
Maintaining and Updating Windows Server Monitoring Windows Server It is important to monitor your Server system to make sure it is running smoothly.
PanDA Monitor Development ATLAS S&C Workshop by V.Fine (BNL)
MODIS OCEAN QA Browse Imagery (MQABI Browse Tool) NASA Goddard Space Flight Center Sept 4, 2003
ALMA Archive Operations Impact on the ARC Facilities.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
3/30/04 16:14 1 Lessons Learned CERES Data Management Presented to GIST 21 “If the 3 laws of climate are calibrate, calibrate, calibrate, then the 3 laws.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
Swift HUG April Swift data archive Lorella Angelini HEASARC.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
Unit 22 People in Computing
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
Level 1.5 Geolocation Martin Bates, RAL GIST th December, 2005.
Product status and timeline Andy Smith RAL. User products The GGSPS provides user access to the following products: Level 1.5 NANRG, ARG Level 2 ARG (and.
Enterprise Network Systems Client/ Server Mark Clements.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
Page 1 Land PEATE support for CERES processing Ed Masuoka Gang Ye August 26, 2008 CERES Delta Design Review.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Install, configure and test ICT Networks
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
Accurate Information … Informed Decisions Data from automated and manual sources in a central, secure repository providing easy regulatory and ad hoc reporting,
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
Service Challenge Meeting “Review of Service Challenge 1” James Casey, IT-GD, CERN RAL, 26 January 2005.
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
5-7 May 2003 SCD Exec_Retr 1 Research Data, May Archive Content New Archive Developments Archive Access and Provision.
Cofax Scalability Document Version Scaling Cofax in General The scalability of Cofax is directly related to the system software, hardware and network.
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
A Solution for Maintaining File Integrity within an Online Data Archive Dan Scholes PDS Geosciences Node Washington University 1.
The SCEC CSEP TESTING Center Operations Review
Chapter 18 Maintaining Information Systems
Update on Plan for KISTI-GSDC
Maximum Availability Architecture Enterprise Technology Centre.
UK Link Technology Refresh
5 SYSTEM SOFTWARE CHAPTER
Design Unit 26 Design a small or home office network
5 SYSTEM SOFTWARE CHAPTER
Presentation transcript:

GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL

GIST 23 DWD, 27-29th Apr 2005 Outline GGSPS development New/ongoing development Maintenance/improvements to existing software Reprocessing Operations – s/w reliability, archive stats MSG-2 preparations: h/w & s/w installation and testing Change Request: FTP of L0 data from EUM to RAL

GIST 23 DWD, 27-29th Apr 2005 New development Product download and catalogue search Prototype -> production Introduced logging – useful stats Error handling and reliability improved Eng products and plots: improved instrument monitoring New (useful! working!) monthly trend plots Updated daily plots on the way Additions to eng products (to be fed through to plots) Ingest of L0 data re-ordered from UMARF – ongoing L1.5 Geo & stray light - ongoing

GIST 23 DWD, 27-29th Apr 2005 Maintenance Archive: cataloguing speed improved by work-around for database performance problem Processing: updates to aid re-processing L15N confidence flags re-defined, new summary information in catalogue Improved reliability of reception of L0 data from EUM failsafe against disk failure/network outages Fixes to known software faults: 6 fixes installed Nov ’04 – Apr ’05 5 new ones discovered

GIST 23 DWD, 27-29th Apr 2005 Other changes TSOL jitter Moving to SFTP “push” by EUMETSAT Improves reliability, removes reliance on extra PC Catalogue database: No repeat of database “hanging” problem: 1 hang since April 2004 Performance problem remains: slow since ~1 yr ago Web access to UMARF for re-order of missing raw data Available since Nov 2004 Missed science data retrieved, awaiting ingest

GIST 23 DWD, 27-29th Apr 2005 Reprocessing Work done: Software was developed in summer 2004 Some additional changes made to existing code Remaining New machine purchased, now being set up GGSPS software being installed Detailed procedures/tools being defined May 2005: should be able to reprocess routinely, and support development/validation of science products Addition of re-ordered L0 data: further improvement

GIST 23 DWD, 27-29th Apr 2005 Future development Monthly averages of L2 fluxes: archiving of the RMIB L2 “BARG” product generation of L2 monthly means addition of clear sky fluxes to the L2 means work started on BARG product definition framework can be set up before finalising clear-sky algorithm Plus non-L2 work: Eng Plots: ongoing improvements to monitoring Geolocation: ongoing Stray light/gains: ongoing

GIST 23 DWD, 27-29th Apr 2005 Ops: reliability Operator interventions Nov - April: Level of intervention remains low: ~weekly, up to 1 month TSOL transfers (10 cases) Power cuts (2 cases + 1 knock-on air-con failure) Other s/w errors (1) Software upgrades, machine moves (5) Systems and database manager errors(3) Conclusion: the software runs well, hardware sets the limitations

GIST 23 DWD, 27-29th Apr 2005 Archive stats Catalogued L0 packets vs expected (at / minute) Month% PacketsProblems Nov94.8 RAL system dumps (33.5 hrs) Dec94.6 RAL site power cut 28 th Dec. (37.5 hrs) Jan94.8 RAL air-con failure (33.5 hrs) Feb98.0 RAL site network (11.8 hrs) Mar99.8 Data corruption (0.5 hr), RAL power (0.6 hr) Apr98.5 (25d) EUM power lost (11.5 hr)

GIST 23 DWD, 27-29th Apr 2005 MSG-2 GGSPS-2: 2 new machines purchased and installed disk archive ordered – 9TB possibility of merging GERB-1/2 data archives installed GGSPS software GERB-1 tables needed revive tools for commissioning period – no SV data Install ops/monitoring tools, eng. plots New web pages required for GERB-1?

GIST 23 DWD, 27-29th Apr 2005 MSG-2 Network lines and testing GERB-1/2 dual ops: 2 data streams over 1 line interface tests with EUMETSAT over ISDN - successful leased-line upgrade soon, repeat interface test RMIB interface test GGSPS system shake-out/commissioning

GIST 23 DWD, 27-29th Apr 2005 Change Request Transfer of raw GERB data from EUM to RAL Current: leased line, permanent connection, 1 pkt/0.6s Proposed: Secure FTP, i.e. use standard internet connection transfer files ~equivalent to GGSPS GL0 files add TSOL jitter to the GERB packet GGSPS team have discussed this in the light of concerns raised by EUMETSAT – no technical objection We need GIST/PSG approval to proceed with this change

GIST 23 DWD, 27-29th Apr 2005 Change Request Cons/EUMETSAT concerns: coding effort is required to adapt the GGSPS and IMPF current method conforms to existing EUM standard issues of security/data corruption (use secure FTP) risk of slow transfer in periods of high internet loading single-point connection at EUM (no ISDN back-up) risk due to internet connection reliability Pros: save cost of leased line and ISDN back-up SFTP is used currently for TSOL jitter transfer – proven method (at lower data rate than L0) remove reliance on separate TSOL data stream may reduce gaps in data set/reliance on UMARF

GIST 23 DWD, 27-29th Apr 2005