Seisland Surveys Ltd. Geodatabase Development Joint Partnership With Niagara College Progress Presentation Presented By: Brad Turcotte & Gregg Donahoe.

Slides:



Advertisements
Similar presentations
1 Mid-Term Review of The Illinois Commitment Assessment of Achievements, Challenges, and Stakeholder Opinions Illinois Board of Higher Education April.
Advertisements

TIGER GRANT Informational Meeting March 30, 2010 MARCH 30,
Your Project Report is a record of how the problem was solved It provides guidance to your company to implement what you have done It is one of the assessment.
KOREA DMZ COUNCIL Bicycle & Monorail ▷ Imnam Dam S.Korea N.Korea Peace, Eco-Cultural Tourism Peace Dam Military Division Line Water Leisure Activity Bicycle.
Map Skills 6 ‘How can we describe routes?’ To understand how we can describe routes and places using an Ordnance Survey map Describe the route from.
Large urban centers have begun to worry about the sustainability of their water supplies Watershed.
The Great Ohio Lake-To-River Greenway PICTURE THIS…. An 100 mile-long green band of protected open space running through fertile farmlands, lush woodlands,
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
Raster Based GIS Analysis
Topographic Base Maps Objective – Displays surface features (topography, roads, lakes & river, cultural features) and a grid system (TRS, UTM, Lat/Lon)
Large urban centers have begun to worry about the sustainability of their water supplies Watershed.
Elk Island Public Schools
Sep. 21, 2006 v FME Worldwide User Conference - Vancouver Geomatics and FME from a Corporate Perspective Nadia Shahriari Namini – City of Calgary, Alberta.
Topographic Map Activity Typo Lake Charles Hendrickson.
Manning Park Fuel Reduction Project, 2005 Judy Millar, RPBio Okanagan Region, WLAP.
Lauri Hietaniemi InnoEnvi Project InnoElli Innovative Actions Programme (PRAI) in South Finland in Green.
L. Guilliams, C. Pennington, G. Shreve Sidewalk Inventory City of Seguin, Texas Wellness and Lifetime Knowledge WALK.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
One to One Tuition Lead Networks February 10 th and 11 th 2010 Hilary King and One to One Support Team.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
Rachel Cavin, Manager James Dodds, Assistant Manager Taylor Dorn, GIS Analyst Kyler McNew, GIS Analyst Cartographic Modeling of Sidewalk Location Selection.
October 29, 2013 Calgary flood 2013 – Resilience of City’s workforce supports Continuation of operations Ron Schafer, Transportation Planning Sandy Virgo,
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Lt. Col. Paweł BORYN, PhD POLISH EXPERIENCES IN PREPARING HIGH- RESOLUTION MAPS FOR JTLS.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
Lakes, Ponds Wetlands, Streams, Rivers, and Groundwater
Meghan Spencer 11/28/12 4F One of Alberta's beautiful lakes.
9 January 2004 Advisory Panel on Computer Networking 1 NATO Science Programme Security Through Science NATO Science Programme Security Through Science.
Site Suitability for Lake Overholser Cassi Poor CRP 551.
South East Fire & Rescue Service Regional Management Board – Achieving Level 3 of the Equality Standard – Update report. Doug Feery 16 th January 2008.
Students will learn about the different physical regions of Canada by writing a summary of their research, making a model of their assigned region, and.
Trademark Fee Cost Analysis TPAC Status Briefing #2 – Public August 28, 2009.
KARA – Development & Traffic Update KARA AGM – March 29, 2012.
Mapping It Out Grade 2 Social Studies Online. Blueprint Skill Geography Grade 2 Recognize that a map contains elements such as title, scale, symbols,
Are You a Smart 4 th Grader? Geography 1 What are the 5 themes of Geography?
Driver Attentiveness Detection System (DADS) P roject Plan Project Team Members  Matthew Parks – Project Leader  Steve Tegtmeyer  Chris Klutch  Justin.
SRD Mapping Activities Stakeholder Mapping Forum June 5 th and 7 th, 2007 Greenwood Inn & Suites Edmonton & Calgary.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Conclusion BACKGROUND Since the basis of this analysis is not based on the skill of the offender, but rather, an inherent dependence on environmental and.
9. SYMBOLIC FRAMEWORK #2 Scouts, Venturer Scouts, and Rover Scouts Version 1.0 – Dated 15 Jan 2016.
Maps of Alaska Mapping Activity 6 Regions of Alaska.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Topographic Maps. Lesson Objectives Define a topographic map and state its uses. Define a topographic map and state its uses. Describe how contour lines.
Eastern Alberta Trade Corridor - Local to Global Forum – Port of Wild Horse Business Plan - Status Report - PROLOG Canada Inc. The Van Horne Institute.
GIS Project1 Physical Structure of GDB Geodatabase Feature datasets Object classes, subtypes Features classes, subtypes Relationship classes Geometric.
DeWitt County Emergency Response Handbook 1 of 9 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
Put name of kaizen event here
World Cultural Geography
Directions Choose one of the following Cities and Destinations:
June 26, 2017.
Submissions Subcommittee
El Dorado County Western Slope Community Wildfire Protection Plan
Segmented analysis of prostate cancer pathway from referral to treatment: This work was carried out in partnership between the Transforming.
Grade 2 Social Studies Online
Onboarding New Employees
Segmented analysis of the lung cancer median pathway from referral to treatment: This work was carried out in partnership between the Transforming.
Grade 2 Social Studies Online
Grade 2 Social Studies Online
Social Studies Online Introduction
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
<<Project Name>> – Engagement Status
Grade 2 Social Studies Online
Welcome to our EoE OD Network
projects update ATLANTA district
HN Accounting Review. HN Accounting Review Background Based on 5 year cycle, HNC and HND Accounting due for review Consultation indicated that existing.
Social Studies Online Introduction
Presentation transcript:

Seisland Surveys Ltd. Geodatabase Development Joint Partnership With Niagara College Progress Presentation Presented By: Brad Turcotte & Gregg Donahoe

Consultants Gregg Donahoe (HBA) Brad Turcotte (HBA) Geography

Project Goal The goal of the project is to improve Seisland Surveys’ vast Alberta information system by creating a network ready geodatabase for proximity analysis and routing. The project will be completed in April of 2003.

Summary Of Progress to Date

Summary of Challenges to Date Data Transformation from NAD27 to NAD83 Calculating Total Length of Line Segments Reference Map Detail

Summary of Challenges to Date (cont.) Data Transformation from NAD27 to NAD83 Since Dropped from Project Scope

Summary of Challenges to Date (cont.) Calculating Total Length of Line Segments

Summary of Challenges to Date (cont.) Reference Map Detail

Resources Required To date we have used ½ of these Resources

Team Member Allocations as of March 5 th

Costs Major Tasks Projected Vs. Refined Transforming Data 16 hours 16 hrs. Cleaning Data 135 hours235 hrs. Final Project Doc. 20 hours 20 hrs.

Refined Total Cost to Seisland Surveys Ltd.

Examples of Progress to Date (Roads) Roads Cleaned Trans-Canada (Hwy 1), Highway 2 from Slave Lake to Calgary, Highways 11, 21, 56, 36, 41, 9, 93 (Icefields Parkway), the Yellowhead (16) and 27. Secondary Roads that have been cleaned include 791, 590, 850, 593, 853, 589 and 855.

Examples of Progress to Date (Roads cont) IceFields Parkway (93) & Highway 9

Examples of Progress to Date (Rivers)

Project Changes Project Township grid cleaning removed from scope Data Transformations no longer needed Data Cleaning Scope (Roads and Water)

Project Changes cont. Road Layer

Project Changes North Saskatchewan River, and Beaver Hill Lake Water Layer Example

Project Changes cont. Water Layer Now clean Just the following major rivers Milk River, Little Bow, Bow, Elbow, South Saskatchewan, North Saskatchewan, Slave, Peace, Smokey, McLeod, Battle, Athabaska, and the Lesser Slave River

Remaining Tasks Clean Park Layer Clean Roads/Water Final Report Clean! Clean! Clean!

Thank-you for attending our presentation Questions ? Brad Turcotte Gregg Donahoe