6-7 April 06 MAC Review Global Design Effort 1 European Regional Program Brian Foster GDE University of Oxford.

Slides:



Advertisements
Similar presentations
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
HPRF Faraday Activities in support of LCUK David Wilcox Doug Clunie HPRF Faraday Partnership 13 April 2007.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
Brian Foster - 1 European perspectives for the ILC Brian Foster Oxford Specific examples of ongoing work from collaborations and major countries.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows LCUK Meeting, Oxford 29/01/04 UK LC-ABD Collaboration UK Beam Delivery System Plans Philip Burrows Queen Mary, University of London.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
European Design Study Towards a Global TeV Linear Collider Susan L Smith.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Lutz Lilje DESY -MPY- SCRF Infrastructure for ILC EGDE Meeting Lutz Lilje.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
Report on ECFA Gerard van der Steenhoven Based on plenary ECFA meeting of 26 Nov. CERN Issues: – Business as usual (chair, CERN, DESY) – ESGARD.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
FP7: EuCARD after a year of preparation… A.Jeremie.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
CLIC-ILC BDS & MDI work.
Nick Walker (DESY) EU GDE Meeting Oxford
Olivier Napoly, coordinator CEA/Irfu
INFN and the ILC S. Bertolucci, INFN.
Presentation transcript:

6-7 April 06 MAC Review Global Design Effort 1 European Regional Program Brian Foster GDE University of Oxford

6-7 April 06 MAC Review Global Design Effort 2 Overview h Specific examples of ongoing work from collaborations and major countries Summary General outline of ILC-related collaboration in Europe.

6-7 April 06 MAC Review Global Design Effort 3 Euro Collaborations h TESLA (wider than Europe alone) Coordinated Accelerator Research in Europe EuroTeV - LC research programme UK Linear Collider Accelerator & Beam Delivery LCABD – PPARC & CCLRC-funded European XFEL

6-7 April 06 MAC Review Global Design Effort 4 TESLA 55 Institutes in 12 countries (43 institutes 9 countries in Europe). Successful (ever growing) collaboration for over a decade. Responsible for developing SCRF to the point where it is a viable option for a Linear Collider. TESLA Technology Collaboration now: - no longer a collaboration focused on ILC; - many institutes interested in ‘technology’ (for light sources, ERL etc.); - ‘mission’ now to advance SCRF technology (main customers: XFEL, ILC, Proton Driver…)

6-7 April 06 MAC Review Global Design Effort 5 VUV-FEL Status

6-7 April 06 MAC Review Global Design Effort 6 CARE CARE is EU FP6-funded programme on Coordinated Accelerator Research in Europe. It is a very broad programme, incorporating e.g. work on SC high-intensity proton linacs, high-field magnet development, etc. Here we are concerned only with those elements directly related to ILC. The most relevant workpackage is on SCRF. Here there are 11 institutions involved: DESY, CEA/DSM/DAPNIA, CNRS-IN2P3-Orsay, INFN Legnaro, Milano, Roma2, Frascati, Paul Scherrer Institute, Technical University of Lodz, Warsaw University of Technology, IPJ Swierk. Budget is 19 M€ over 4 years, incorporating ~44 FTE. There is significant overlap with TESLA / TTF / XFEL.

6-7 April 06 MAC Review Global Design Effort 7 EuroTeV programme also EU FP6 funded. It is purely concerned with LC – generic matters of use both to ILC and CLIC. Focussing on ITRP R2 items. Part of European Design Team. Beam Delivery System Damping Rings Diagnostics Metrology & Stabilisatio n Global Accelerator Network Integrated Luminosity Performance Studies Polarised Positron Source Scientific coordination from CERN & DESY

6-7 April 06 MAC Review Global Design Effort 8 EuroTeV 27 institutes participate: HU Berlin, Birmingham, Bristol, Cambridge, CCLRC, CEA, CERN, Darmstadt, DESY, Elettra, FHI-IGD, GSI, LAL, INFN-Frascati, Lancaster, LAPP, Liverpool, Manchester, Mannheim, Oxford, PSI, QMUL, RHUL, Rostock, UCL, Udine, Uppsala Total Budget is 27.6 M€, of which EU contribution is 9 M€. Funds 110 FTE, of which 30 are new posts funded by EU. Mostly Accelerator-Physics-related R&D. Little effort included for major engineering – i.e. actually building a major accelerator facility.

6-7 April 06 MAC Review Global Design Effort 9 Recent Progress Selected recent progress on CARE SCRF: 3 new prototype designs of power couplers from LAL-Orsay: To be built in industry and tested in 2006.

6-7 April 06 MAC Review Global Design Effort 10 Recent Progress Tuners: (CEA, DESY, INFN-Milan, IPN-Orsay, TU-Lodz) fast tuner development based on piezo-electric or magnetostrictive elements. Several devices either under test or will be ready within next few months. Results already looking promising. Detuning without piezo compensation  180Hz FLAT TOP Detuning with piezo compensation < 10Hz

6-7 April 06 MAC Review Global Design Effort 11 Recent Progress Test facility in CARE: CryHoLab Saclay and being used in tests; e.g. cold tuning system & piezo actuators warm & cold test. CryHoLab will be dismantled, improved & reinstalled over first half of year ready for another series of tests..

6-7 April 06 MAC Review Global Design Effort 12 Cavity Preparation Electropolishing studies DESY

6-7 April 06 MAC Review Global Design Effort 13 Cavity Preparation Optimisation of the electropolishing technique:

6-7 April 06 MAC Review Global Design Effort 14 Cavity Preparation Investigation of large-grain DESY - electropolished and then baked: Baking effective irrespective of the type of cavity or how it has been chemically treated.

6-7 April 06 MAC Review Global Design Effort 15 Cavity Preparation Baking seems to have permanent good effect: Now seem to be gaining some theoretical understanding of what is going on in terms of diffusion of interstitial oxygen. T = 120 °C / 2 days + Air exposure -for 4 years – without any particular precautions Hydrofluoric Treatment High Pressure Rinse

6-7 April 06 MAC Review Global Design Effort 16 Euro XFEL German government Feb gave go-ahead for XFEL as European project, ~ 40% required from European partners. Planfeststellungsverfahren TDR preparation, including a detailed cost study Administrative issues advancing International involvement progressing German Government Coalition agreement 13 countries have signed MoU for preparatory phase

6-7 April 06 MAC Review Global Design Effort 17 Euro XFEL Length quantized n  /2 (possibility of ERL) 2 more cryostats (TTF3/INFN) ordered Industrial study module assembly (M6) Superferric magnet (CIEMAT) BPM (Saclay) Integrated HOM absorber TTF3-type coupler Industrialization launched (Orsay) Tuner w/piezo (Saclay) Industrialization in preparation LLRF development (collab. Warsaw/Lodz)

6-7 April 06 MAC Review Global Design Effort 18 UK LCABD B’ham, Bristol, Cambridge, CCLRC(DL & RAL), Dundee, Durham, Lancaster, Liverpool, Manchester, Oxford, QMUL, RHUL, UCL working on coordinated beam-delivery system project. Also two new Accelerator Institutes, Cockroft & Adams, playing major role. Three-year programme; 41 post-doc physicists + technical staff + graduate students + 23 new posts. 15 M€ programme; significant overlap with EuroTeV – ~ 2/3 of staff in EuroTeV – to which UK is biggest contributor.

6-7 April 06 MAC Review Global Design Effort 19 Electro-optic Z-profile Utilise change in optical properties of medium under E field Propagating electric field

6-7 April 06 MAC Review Global Design Effort 20 France in ILC Vacuum furnaceClass 10 clean roomUltra-pure water production Klystron/modulator Reception, cleaning, mounting Conditioning and tests => Diagnostics LAL effort on TTF couplers Manufacture of 30 TTF-III couplers in industry

6-7 April 06 MAC Review Global Design Effort 21 Italy in ILC Cryomodules, Cavities and Ancillaries R&D, Construction and Commissioning Cost Optimization and Industrial Studies Damping Rings - Layout and Engineering Design Cost Optimization and Industrial Studies Ultra-fast Multi-frequency RF Kickers Beam Diagnostics: OTR, DF, Bunch Length Photocathode preparation and handling

6-7 April 06 MAC Review Global Design Effort 22 Russia in ILC Russia major source of expertise in all aspects of accelerator R&D. BF visited Russia last week to discuss increased involvement from labs and individuals - positive response. In particular JINR are enthusiastic and wish to be considered as a possible ILC site.

6-7 April 06 MAC Review Global Design Effort 23 CERN in ILC CERN major players in CARE, EuroTeV, ELAN. Lots of common projects/synergy with CLIC developments. Civil engineering studies for the possibility of CERN as an ILC site. Cryogenic plant expertise carries over directly from the LHC experience.

6-7 April 06 MAC Review Global Design Effort 24 Future Plans National programmes expected to continue beyond current end-dates although without major ramp-up. Calls for proposals for Framework VII within the EU will be coming up around end of ‘06. Preparatory thinking going on involving GDE, TESLA, EuroTeV and other interested parties. Proposal for EU has to build on FP6 and be qualitatively more advanced. Infrastructure based at CERN for cavity R&D/test currently preferred. LoI  CERN Strategy Group.

6-7 April 06 MAC Review Global Design Effort 25 Future Plans Other, smaller and more specific programmes will “cluster” around this. Coordination with GDE R&D board to minimise wasteful duplication of efforts. Maximise synergy and what we can learn, particularly about industrialisation, from the European XFEL.

6-7 April 06 MAC Review Global Design Effort 26 Summary The European R&D effort continues to be very large and diverse, supported by a number of EU initiatives and strong national programmes. Excluding XFEL synergies, European programme ~ 250 FTEs & 21 MEuro. A great deal of progress is being made, and almost all of the European milestones are being met on time. For the future, we need to extract at least as many resources from EU in FP7 as we did as in FP6. This requires listening to Brussels and tailoring our proposals to what we think has best chance of success. At same time, we need to optimise use of resources world-wide.