Outline Overview of Activities FY 09 Budget  Changes since baseline budget Fall ’08. FY 09 Budget Status Mid-year Review  FY 09 so far.  Projection.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Mu2e WGM 6/15/2011 R. Ray Mu2e Project manager. Reviews We were on Lehman’s schedule for early August. We gave up that slot 2 weeks ago when it became.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
BUDGET MANAGEMENT TRAINING PEOPLESOFT 8.9 Scott McElroy Office of Budget & Finance.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Designing a Budget Making it work without working too hard 1.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
PAC Meeting, December 12, Prebys 1 The Problem.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
CMS ROC Report Patricia McBride May 26, 2005.
JRA3 Institute of Physics ASCR Prague
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
4th FRC meeting, Antti Onnela, CERN-PH-DT
Summary/Conclusions of the SuperB PID Sessions.
HL-LHC upgrade at IPHC news
Status Report and highlights from workshop II
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Outline Overview of Activities FY 09 Budget  Changes since baseline budget Fall ’08. FY 09 Budget Status Mid-year Review  FY 09 so far.  Projection for the remainder of FY 09. Opportunities for new ECAL participants Housekeeping issues Summary US CMS Annual Meeting US CMS ECAL Manager Report B. Cox May 8, 2009

Opening of the CMS detector to allow access to the ECAL. Repair of bad channels; At present, the percentage of bad channels are less that 1% in the barrel and endcaps (0.64% for the barrel 60,000 channels and 0.38% of the endcap 14,468 crystals). Addressing the B field (600 G) problem in the laser barracks. At present, we have dealt with air conditioning, interlocks of laser lamps so they are off during ramp- down of CMS solenoid, magnetic shielding of the lasers, and purchase of instrumentation that is tolerant of magnetic fields. In June when the magnet once again turned on, we will see of there is anything more to do. LED’s on both endcaps are totally functional after all fixes. Both blue superbrights and orange LEDs are operational. The operation of the LED system from the cavern in a “manual”mode is in place. Full operation from the cavern under computer control is well along. Upgrade of the barrel low voltage and optical links Overview of Activities – FY 09 Slide I

The strategy of operation of the LED and the Laser calibration system by the CMS DAQ via the TTCci and the EMTC modules with the full calibration, testing, and soak light pulses in the 11.4K of abort gaps has been decided. This strategy has been partially implemented. At present, since the checkout of the ECAL is still underway, with the trigger checks and repairs of individual channels still on progress, the LED system is heavily used for this check out. This slows the integration of the LED and Laser together and into the DAQ since the requests are to keep flashing manually. Participation in the CRAFT runs and the PFG are on- going but more manpower needed. Severe shortage of office space (need contiguous space if possible) Overview of Activities – FY 09 Slide II

An extra $11,817 was allocated to the University of Virginia for a small test beam LED system for the planned checks of lead tungstate and photodetector rad damage vulnerability. An extra $4,431 was allocated to Caltech to purchase a B-Field tolerant power meter and IR viewer. An additional $21,761 was approved for extra COLA’s for new, long term postdocs and faculty who were arriving in May and June. Approved Budget (Fall 08) Additions after March Review38,009 Current FY 09 Budget909,370 DOE Budget738,583 NSF Budget 170,787 Total909,370 FY 09 Budget

Team Account - DOEFY 09 Budget FY 09 Oblig thru Mar09 Projected FY 09 Oblig Personnel344,307194,850$349,000 M&S126,44222,613$55,000 Travel + Transport27,17833,101$70,000 COLA +short term stays205,42897,054$228,000 Communications3, ,000 Total706,664348,384$704,000 The main readjustment is to “rationalize” and, perhaps, readjust the distribution of funds between the M&S and the COLA and travel budgets Still may not be completely fully accounted for are the barrel low voltage and optical link upgrades: more M&S than has been allowed in the projection? The radiation tests at H4 and other places will require more resources in FY09/10? CERN Team Account

FY 09 Summary FY 09 Summary and FY 10 Estimate FY 09 Budget Projected FY 09 Oblig FY 09 Excess or (Shortfall) Personnel$383,304$389,000($5,696) Cornell (not agreed to yet)$25,000 M&S$227,785$144,000$83,785 Travel + Transport$27,178$80,000($52,822) COLA$267,794$290,366($22,572) Communications$3,309$2000$1,309 Total$909,370$930,366($20,996) The major imbalance appears to be between M&S and Travel + Transport + COLA, which may indicate a shift from detector workto physicist intensive work.

Opportunities for New ECAL participants DAQ - DQM - DCS - Operations/Monitoring (Borheim) Calibration (Gataullin) Simulation - (Heltsley) Craft/Cruzet analysis (Franzoni) Prompt Feedback Group (Ortimoto) Barrel (Singovski) Endcap (Ledovskoy) US Contacts to talk to Number of players: See the overall ECAL organization chart

Housekeeping issues Office space; trying to get three offices in Bldg 510 We are renting the “Chalet” for the summer- June 1-August 30 Occupancy for 4-6; I need to know who wants a place. I need information about the FTE’s at CERN in FY09 and FY10; most institutions have been responsive but those that have, please respond.. Be alert and let me know if there are any NEW requests for funds to cover COLAs, new M&S, short term visits, transport. Be aware that midsummer, I will be preparing the FY10 budget request. Think hard about what you might need in FY10. Any other complaints/beefs/needs I should know about?

Summary and Conclusions II We are on budget at present/ perhaps a bit over with new colas. The major uncertainty in the 2009 budgeting is how much M&S compared to for Travel + Transport + COLA’s, ie. people expenses vs. M&S at CERN. The ECAL detector is coming together nicely. Concerns:  The schedule for the magnet operation should not slip in order for us to see if the laser barracks B field problem is solved.  The final insertion of the laser/LED into the controls system (fast and slow) is not yet completed. On track for mid summer but will be nervous until we can sit in the control room and control!  The upgrade work on optical links and LV for the barrel. How do we meet the service obligations of US ECAL within a reasonable budget is unclear since most of the ways you can get credit requires one to be at CERN.

My major concern is too few people on the ground at CERN  on the short term to man the 24/7 CRAFT/CRUZET runs to start in June and go until full running in the fall.  in the next 1-2 years, to bring the ECAL up to optimal performance.  A very annoying concern is office space. I expect the budget for next year to be similar but with the emphasis shifting from M&S to physicist expenses as we try to calibrate and stabilize the ECAL detector. There will be off-line test beam work and test bench work to continue studying details of the detector performance. Summary and Conclusions II