ARD All-Hands Tor Raubenheimer November 22 nd, 2010.

Slides:



Advertisements
Similar presentations
Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Advertisements

SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
Feng Zhou Thank Brachmann, Decker, Ding, Huang, Loos, Raubenheimer, Turner et al for the contributions March 6, 2013 Recent LCLS injector studies & plans.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 Enhancements to the Linac Coherent Light Source.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Accelerator Research at SLAC for Future HEP Programs Tor Raubenheimer SLUO Annual Meeting September 18, 2008.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
AARD June 17, 2011 This talk is: V:\ARDB\business\AARD_ pptx.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
AS Diagnostic Collaboration Mark Boland
Contributions to ELI-NP on RF accelerator activities Andrea Mostacci Università di Roma, Sapienza The joint Sapienza/INFN-LNF group is active in the field.
Low Emittance RF Gun Developments for PAL-XFEL
I.V. Bazarov, ERL advisory mtg, Sept 2012 CLASSE Cornell University CHESS & ERL Cornell Laboratory for Accelerator-based ScienceS and Education (CLASSE)
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
SLAC FEL R&D Test Facilities Test Facility Task Force R. Hettel May 4, 2011.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Leveraging the SLAC Expertise Outlook and Strategy Tor Raubenheimer May 4, 2011.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
R&D opportunities for photoinjectors Renkai Li 10/12/2015 FACET-II Science Opportunities Workshops October, 2015 SLAC National Accelerator Laboratory.
SLAC Accelerator Development Program: X-Band RF Power Sources Michael V. Fazio OHEP Accelerator Development Review January 24-26, 2011.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
LCLS-II Design and FEL R&D
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
A Compact X-Band FEL Linac Chris Adolphsen SLAC. Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC.
SLAC Accelerator Research Program Tor Raubenheimer SLUO Meeting, July 17, 2009.
X-band Based FEL proposal
LCLS-II will use sectors (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
CALIFES A proposed electron beam test facility at CERN
CompactLight H2020 Design Study Proposal
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Sara Thorin, MAX IV Laboratory
Status and Interest of the X-ray FEL SINAP
SuperB Injection, RF stations, Vibration and Operations
WP11: electron and proton beam testing
Gu Qiang For the project team
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
LCLS-II-HE FEL Facility Overview
LCLS-II-HE FEL Facility Overview
SLAC ARD Test Facilities
Requests of Future HEP e+/e-Facilities
WBS 5.0 LCLS Strategic Projects Division
Jim Clarke ASTeC Daresbury Laboratory March 2006
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Presentation transcript:

ARD All-Hands Tor Raubenheimer November 22 nd, 2010

Outline LCLS-II AED review FACET SAREC review Accelerator education Budgets and program Future opportunities –X-band rf program –BES Test facilities Questions

LCLS Upgrades From J. Stohr presentation to DOE

LCLS-II (Two Tunnel option) Challenge is writing a CDR by March!

AED Review External review during last week of October –Number of specific suggestions but also some general comments: 1.Aligning the underlying lab culture with the vision for SLAC is foundational its success. Specific mention of aligning lab vision to reality with regard to centrally managed/field deployed: change vision or change reality. 2.Lack of integrated approach to good engineering practices across the lab and within Engineering. 3.Improve the formulation and execution of budgets for resources and costs. Institute formal, monthly (quarterly) metrics reviews where milestones, costs, resource utilization and variances are reviewed at the division and AD levels.

FACET and SAREC Review FACET construction making great progress –Beam expected next summer First proposals for FACET will be reviewed January 10-12

ARD Education Programs Strengthening education programs in Accelerator Science and Technology –Restarted Accelerator Physics courses on campus –Developing new campus web pages with Applied Physics –Improving ARD web pages for student information Suggestions for further improvement welcome!

Budget Status Budgets for FY11 are being finalized based on expected funding –HEP Accelerator Science is up 1M$ to support PWFA program –HEP Accelerator Development is down 0.5M$ –ILC program is roughly flat at 10.5M$ (plus 5M$ carry-forward) Funded at 80% through continuing resolution –LARP and BES Accelerator R&D are flat at ~2M$ + carry-forward –LCLS and LCLS-II support are ~4M$ –LCLS Accelerator physics ~1M$ –Operations funding for FACET and ESTB of 6M$ and 0.4M$ There are some new account numbers and some old accounts have been closed –Please pay attention to timesheets and adjust as efforts change

Redirection within ARD LCLS operation support and LCLS-II programs are growing –LCLS accelerator physics program being created Developing plan for next generation of BES-supported test facilities –High brightness injectors, seeding and beam manipulation ILC program will be decreasing over next few years  Project-X, X-band R&D, and photon science programs –Project-X is focused on CW solid-state rf sources and pulsed 1.3 GHz rf sources; X-band R&D program is still being defined Building FACET and ESTB – will operate 4 test facilities Planned participation in HL-LHC program Super-B effort at SLAC put on hold until clarity in the international community Please pay attention to timesheets and adjust as efforts change

LHC Great progress –1200 bunches now –75 ns looks good HL-LHC program aimed at 2020 upgrades

X-band Program Three elements to program: research, development and commercialization –Strong effort in US High Gradient collaboration researching high gradient structures and starting to research novel rf sources –Small effort developing improved rf sources (modifying existing klystrons and output structures) –Starting effort in commercialization (req for 2 commercial tubes) X-band program has suffered greatly due to lack of ‘pull’ from community –Very few ‘users’ of technology except in boutique cases Biggest impediment to adoption is lack of commercial power sources and an operating demonstration linac –Working with LLNL on MEGa-ray 250 MeV linac –Exploring other options for X-band technology

Community Interest in X-band Rf Applications Lawrence Livermore National Lab (MEGa-ray ICS) LANL (hard X-ray 50 keV FEL facility) Extreme Light Infrastructure – Romania (600 MeV ICS) Idaho Accelerator Center (60 MeV ICS) PSI (extension of hard X-ray FEL facility) Trieste (extension of soft x-ray FEL facility) UK (new soft x-ray FEL) Shanghai (new hard x-ray FEL) KVI / University of Groningen (soft X-ray FEL) PAL (new hard x-ray FEL) CERN (path towards a linear collider) NSLS-II (compact storage ring injector) 12

Los Alamos MARIE

Linac MeV Linac GeV Linac-3 6 GeV BC1BC2 Undulator L = 40 m S rf gun X undulator LCLS-like injector L ~ 50 m 250 pC,  x,y  0.4  m X X X-band main linac+BC2 G ~ 70 MV/m, L ~ 150 m Use LCLS injector beam distribution and H60 structure (a/ =0.18) after BC1 Transverse wakes have small impact due to short low charge bunches  tolerances of 1 mm rms Possible to operate in multibunch mode to feed undulator farm  effective rep rate of few kHz X-band Linac Driven Compact X-ray FEL 14

BES Accelerator Test Facility BES is starting to explore options for a stronger accelerator R&D program –Meeting on October 6 th “Discussion on the Integration of Accelerator Physics R&D and Operations” –Output of workshop: should integrate R&D into operating facilities and community should develop a plan for dedicated test facilities –Been using LCLS to further R&D concepts: slotted foil, THz, self- seeding –Developed multi-facetted plan towards a high brightness injector Possible opportunity for more rapid development or larger- scale program –Bob Hettel in charge of developing SLAC proposal for BES Test Facility(s)

High Brightness Injector Program Three Parallel Experimental Efforts Cathode Test Facility ASTA Facility Photocathode R&D aimed at understanding LCLS lifetime and damage issues Test rf gun modifications before installation in LCLS-I or II Longer term R&D aimed at high brightness cathodes with lower thermal  (coatings, smoothness, new materials) LCLS-II Injector Incremental upgrade of LCLS-I with opportunity for R&D during commissioning Injector R&D Program NLCTA Facility Simulation and experimental program aimed at significant improvement in brightness 1)Design studies on rf gun design, CSR micro- bunching and cathodes 2)Rf gun development and testing at NLCTA in )NLCTA R&D on injector beam physics Construction in ~2014 and commissioning in ~ May be additional opportunity for larger-scale program

Rf Gun Development with LLNL X-band rf gun has potential to enable compact linacs –Compact single-frequency linac compared with lower rf frequency –Higher brightness with ~ 3x higher peak currents for similar  –Lower emittance at low charge emittance dominated) Constructing XTA in NLCTA and rf gun in collaboration with LLNL Rf gun detail Rf gun test beam line

100 MeV linac with variety of power sources, laser systems and flexible beam line –Direct laser acceleration –Echo-7 seeding experiment –Microwave rf gun and structure testing –Shared between HEP and BES programs Accelerator R&D at End Station B Class 10,000 Clean room 20 feet Chicane -1 Echo-7 Beam line Evolve NLCTA into Injector Test Facility on ~ 2016 timescale  LCLS-III Flexible UV and IR laser 18

Happy Thanksgiving!