Alex Lin Emily Schwartz Sarah Snider Kate Wittels.

Slides:



Advertisements
Similar presentations
City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
Advertisements

Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
K INCORA V ILLAGE C ENTER ZMAP Board of Supervisors Committee of the Whole May 18, 2010.
Board of Trustees Meeting Comprehensive Plan and Zoning Amendments Process Monday, April 2, 2012.
GOVERNOR’S HOUSING CONFERENCE 2013 Creative Financing Sources/Structures to Produce Affordable Housing.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Osborn MIT A proposal to redevelop the Osborn Triangle
City of Waynesboro Entrance Corridor Design Guidelines.
Community Opportunities The values associated with Smart Growth communities encourage affordable, mixed income housing; higher density; and a vibrant,
2nd Annual Membership Meeting Competitive Neighborhood Business Districts.
CITY OF AVONDALE ESTATES Fenner Dunlop Property Stakeholders Public Meeting February 25, 2010.
Financial Considerations; Determining Developer’s ROI in Downtown Palmetto Bay 223 k 185 k 189 k 280k 168 k 218k 248k 196k 197k 216k 227k 236k 255k 235k.
CHAPTER NINE INTRODUCTION TO INCOME- PRODUCING PROPERTIES: LEASES AND THE MARKET FOR SPACE.
© 2005 The McGraw-Hill Companies, Inc., All Rights Reserved McGraw-Hill/Irwin Slide 1 CHAPTER NINE INTRODUCTION TO INCOME- PRODUCING PROPERTIES: LEASES.
Size 2 Acres, sf 420 ft x 220 ft Existing Structure 4 floors underground parking: for 1,100 cars Column grid ~ 35’ Ramps, elevators, and ventilation.
1 RTD TOD Program University of Denver November 2004.
Blessed Sacrament Campus Jamaica Plain, Boston A newly formed joint venture, Church Square Community Partners LLC has recently purchased the Blessed Sacrament.
Multi-Family Development Trends in Delaware David L. Edgell, AICP Principal Planner.
Implementing State Density Bonus Law in Berkeley November 13, 2014 City of Berkeley Planning & Development Department.
Charting Your Course to a Vibrant Downtown Connecticut Main Street Center Mixed-use/Mixed-Income Development.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
Update of Development Trends in Westminster 27 June 2005 CITY DEVELOPMENT OVERVIEW AND SCRUTINY COMMITTEE.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
WAYNESBORO BROWNFIELDS ASSESSMENT & REDEVELOPMENT PLANNING PROJECT May 20 th, 2015 Reuse Planning: Environmental (Prime):
1 P3 CONNECT July 20, 2015 Jim Tucker Senior Vice President.
Planning & Community Development Department Predevelopment Plan Review for Art Center College of Design Master Plan City Council June 8, 2015.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
New Urbanism Theory and Practice
Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Marissa Berardi and Brent Myers-Lawson
Downtown Ridgefield Planning & Development Open House Presentation June 18, 2015.
Urban Land Institute FEBRUARY 26, 2013 Property Tax Appeals and Financial Opportunities Presented by a Challenging Market: Using the Tax Appeal Process.
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
Overview [SITE]Site Characteristics [MKT]Market Conditions [OPP]Opportunities [CNST]Constraints [DEV]Development Opportunity.
Mueller Redevelopment
Downtown Berkeley Development Feasibility StudyCity of Berkeley City Council Meeting Downtown Berkeley Development Feasibility Study City of Berkeley City.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
What areas of knowledge describe real estate? Legal Market/economics Financial Investment Real estate services Chapter 1 Introduction.
City Federation of Women’s organizations Redevelopment proposal 100 West Seneca Street Julianne Kwon John Norwood Chris Persheff Prajna Rao Affordable.
The Office of Sustainability develops and advocates for programs, policies and actions by government, citizens, businesses, and institutions that improve.
HUMPHREY STREET OVERLAY DISTRICT 2015 Proposed Zoning Bylaw Amendment Public Information Session.
“Osborne” synergy Chandan Singla: Kyungwon Kim : Sean Lee : Vipasha Dasgupta MARKET RESEARCH o PROGRAM o FINANCIAL ANALYSIS o DEAL o DESIGN.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
City of Carrollton Transit Oriented Development January 5, 2008 Peter J. Braster TOD Manager.
DRAFT Clark County Land Use Categories – Urban Areas 10/8/2015 – Draft, for discussion1.
RR Farms, LLC Presented by James Stowers, Esq. Wright, Casey & Stowers, P.L. --- Pioneer Square --- Pioneer Square.
Osborn Campus Expansion of The Campus - An Enduring MIT Community Phoenix Development Group Bozho Deranja, Anthony Guma, Tianjin Luo, James Rizzo.
WHITE FLINT SECTOR PLAN Financial Analysis, Infrastructure Financing & Economic Benefits.
City of Maitland Community Redevelopment Agency Proposed Town Center Development Consistency with Downtown Maitland Revitalization Plan (DMRP)
The Three Levels of Development Planning 1 Small Area Plan Zone / CDD DSP / DSUP.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
The MIT The MIT learning from the built environment.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
Dreamer Development, LLC Northeast Gateway A Mixed-Use Land Bridge Development Minneapolis, MN.
RFQ/P Opportunity Site 1 (1.4 acres) Catalyst Retail Anchor Tenant  Site 2 (.54 acres) & 4 (.63 acres)  Stand alone retail or mixed of uses with retail.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
Planning and Zoning Division Jefferson County RZ Sevens Residential Memory Care ODP Case Manager: Russell D Clark.
ARCH – 4601 Feasibility Study Presentation
DISCUSSION OF THE FUTURE DEVELOPMENT OF THE YWCA BUILDING 78 N
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Parking Generation Analysis Storrs Center
Agenda 15th and Race Project Summary Current Requests
Valley & Third Streets Redevelopment
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
83 North Lake Avenue Predevelopment Plan Review
EXCLUSIVE MULTI - FAMILY OFFERING
Presentation transcript:

Alex Lin Emily Schwartz Sarah Snider Kate Wittels

Live

Work

Connect

4 Executive Summary Vision: Redeveloping and revitalizing the 22-acre site (Osborn Triangle) into a 24-hr mixed-used community with flexible development options to adapt to future needs of MIT and the surrounding community. Program: The program will consist of 2.4 Million Square Feet In a Mix of Uses Phases: Phase 1 – 500,000 Square Feet Phase 2 – 1.3 Million Square Feet Phase 3 – 200,000 Square Feet Phase 4 – 400,000 Square Feet Deal Structure: Three Way Partnership: Developer, MIT, Private Investor

5 Development Vision “This 22 acre redevelopment plan seeks to lead MIT into the future by re- branding the campus of the world’s leading technical institute into a vibrant and urban educational community.”

Master Plan

7 Program Total Square Feet in Four Phases of Development: 2,400,000 (2,670,000, including Shire Building) Total FAR: 3.23 Total For MIT Use: 1,150,000 SF 260,000 SF (Student Dorms & Fraternity – 600 beds) 325,000 SF (Office) 500,000 SF (Lab/R&D) 64,00 SF (Conference/Special Use) Total Speculative Development:1,300,000 SF 630,000 SF (Residential – 630 Units) 80,000 SF (Office) 156,000 SF (Lab/R&D) 300,000 SF (Hotel – 679 Units) 22,000 SF (Retail) 46,000 (Garage) 35,000 (Special Use)

8 Market Residential - Rental Strong Demand From MIT and Surrounding Biotech MIT Needs At Least 500 Rooms Residential Condo NorthPoint to Bring Large Increase in Supply Apartments With Option to Convert Are Good Choose Retail Not a Location for Destination Retail Mix of Restaurants/Bars/Grocery Will Add to 24-Hour Vibrancy $35.00 NNN Average Retail Rent

9 Market Continued… Lab/R&D Driven by Large Biotech Companies and Institutions 8.6% Availability Rate and $55.00 NNN Average Rents Office Driven by Similar Users as R&D as Well as Technology Companies 11% Availability Rate and $49.00 Gross Average Rents Hotel Demand From Surrounding Businesses and Universities Need for Extended Stay Hotel & Mid- Scale Options

10 Design Approach Shire Building Serves as a Natural Divide Greenway Provides Continuity Through Site Flexible Options Allow Project to Quickly Respond to Market Conditions Design Components 100% Corner – Entertainment Zone Mass Ave Residential Zone Main Street Residential Zone Dedicated Academic Zone

11 Entertainment Zone 100% Corner Massachusetts Ave. and Osborn St. Two hotels Main entrance to convention center Key retail elements Access to performance artist space 24/hour corner Site of Urban Ring Stop

12 Mass Ave Residential Zone Maintain solid street edge along Mass Ave. Student Housing Luxury Housing Complex Continuous first floor retail along Mass Ave.

13 Main Street Residential Zone 630 Market Rate Residential Units Heights of Residential Buildings in line with Area Standard Located residential zone on Main Street in keeping with neighborhood characteristics Re-use of several existing buildings

14 Academic Zone Mix of R & D and Office Space Closely integrated with existing campus facilities Used Shire Building as Natural Buffer from Residential Zone Agglomeration of academic uses

15 Permitting Approach Proposal includes 3.23 FAR Maximum FAR If All Residential = 3.85 Maximum FAR If No Residential = 2.81 Average FAR = 3.33 We are proposing 37% residential (including student housing) Mixed use is in best interest of community 3.23 is likely to be acceptable to Cambridge

16 Community & Public Benefits 24-hour community with public amenities Greenway and open space amenities Preservation of historical structure – Shire Building integration Redevelopment of under-used land, checking and cleaning up potential contamination Promotion of flexible and green building standards

17 Financial Summary  Total Development Cost Hard Costs$616.8 Million ($255/SF) Soft Costs$153.5 Million ($63/SF) Land Costs$200 Million ($75/SF)  Total Cash Flow$201.8 Million  Implied Land Value$200 Million ($75/SF) WACC7.5% Terminal Cap Rate6.5%

18 Sensitivity Analysis WACC:7.0%7.5%8.0%8.5%9.0% 5.0% 388,320, ,119, ,496, ,176, ,905, % 329,079, ,879, ,971, ,099, ,032, % 279,711, ,846, ,033, ,036, ,638, % 237,939, ,895, ,700, ,136, ,997, % 202,134, ,508, ,559, ,078,761 82,876,833 Terminal Cap Rate:

19 Deal Structure Special Purpose Vehicle (e.g., Trust or LLC) Equity Capital Funding – Three-way partnership Developer – “first in, last out” Developer fee Promote MIT Endowment – “second in, second out” Preferred return Promote Private Investor – “last in, first out” Preferred return Promote Debt Capital Funding: Commercial Lender