Preparing a Site Conceptual Model. Typical Site Management Problems: Site complexities  Complicated hydrogeology  Multiple contaminants of concern (COCs)

Slides:



Advertisements
Similar presentations
Site Conceptual Models
Advertisements

THE CONCEPTUAL SITE MODEL A Visual Journey Though Data and Time October 29, 2013.
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
SHOWME Systematic Historical Overview of Water Management and Environmental Data Why Massive Data Display tools needed? Groundwater and Waste Site Monitoring:
Arts in Science Ltd. 51 Emekuku St., Dline, PO Box 4539, Port Harcourt, Nigeria
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
Groundwater Mounding and Minnesota ISTS Rules MPCA 2/21/06.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Mapping Groundwater Vulnerability to Contamination in Texas
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
Understanding the MRBCA Program UST Program Implications Petroleum Storage Tank Insurance Fund May 2004.
VRP Checklist Presented by: Rob Timmins – Remediation Project Officer William Lindsay – Remediation Project Officer Chris Evans – Remediation Project Officer.
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
KELLY HAYDEN Applying GIS to Watershed Pollution Management.
Importance of Quality Assurance Documentation and Coordination with Your Certified Laboratory Amy Yersavich and Susan Netzly-Watkins.
FIGURE 15-1 Simplified cross section developed from site and subsurface characterization.
Vapor Intrusion Guidance Proposed Updates
Phase I and Phase II Environmental Site Assessments Environmental Specialist Brownfields/Voluntary Cleanup Program June 2014.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Vapor Intrusion Evaluation Strategy and Modeling Developments
Overview of US EPA’s Vapor Intrusion Guidance VAP CP Summer Coffee July 14 th, 2015 Carrie Rasik Ohio EPA CO- Risk Assessor
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
Predicting Vapor Intrusion Risks in the Presence of Soil Heterogeneities and Anthropogenic Preferential Pathways Brown University Ozgur Bozkurt, Kelly.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Case Study 1 Application of different tools: RBCA Tool Kit and APIDSS.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Using Ground-Water Model Predictions and the ppr and opr Statistics to Guide Data Collection.
An Overview of Environmental Investigations January 22, 2002 Presented by: DuPont Corporate Remediation Group.
Results Based Management: Logical Framework Matrix (LFM) December 30 th, 2009 Abeer Shakweer, Ph.D., Planning and Monitoring Manager Science and Technology.
Water Quality Data, Maps, and Graphs Over the Web · Chemical concentrations in water, sediment, and aquatic organism tissues.
1 RBCA Tool Kit Exercise. 2 Groundwater protection : Tier 1 compliance point Point of compliance=Point of exposure (on site) compliance point (receptor)
Remediation System Design & Implementation Presented by.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
Monitoring and Evaluation Management of a Training Program.
Causes of Haze Assessment Dave DuBois Desert Research Institute.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Northern Sacramento Valley Geologic Cross-Sections & Sand- Provenance Analysis Geology and Groundwater Conference Kelly Staton November 4, 2009.
Northern Sacramento Valley Geologic Cross-Sections & Sand- Provenance Analysis Geology and Groundwater Conference Kelly Staton November 4, 2009.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Conceptual Site Models Purpose, Development, Content and Application CP Annual Training October 27, 2015.
1 Section 4- Characterization  Characterization is 95% of the Success of ISCO  Develop a complete and comprehensive Conceptual Site Model  ISCO is a.
Hydrogeologic Analysis of the Delphi Corporation Site, Wyoming Michigan Mark Bryson, Emily Daniels, Sara Nagorsen, Kirk Perschbacher, Joe Root, Jason Stewart,
RI/FS/RD/RA USEPA Region III PADEP Golder Associates Inc. Berks Landfill Superfund Site.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
Evaluating the Practicality of LNAPL Recovery Jeff Lane, P.G. November 17, 2015 International Petroleum Environmental Conference (IPEC) IPEC 22 Contact.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
Protection of ground water meeting UPUS Determining ground water zones – Ground water definition – Determining how many zones Examples POGWMUPUS and GW.
Massachusetts Waste Site Cleanup Program _________________________________ Privatized program since 1993 Direct oversight of only the highest priority.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
WASH Cluster – Emergency Training GWD GWD3 1 1 Groundwater Development and Drilling Session 3 Identifying Potential Groundwater Sources.
What’s the Problem: The Vapor Intrusion Issue Brownfields 2008 Heavy Starch: Cleaning the Dry Cleaners Detroit, MI May 5, 2008 Presented by: Henry Schuver,
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Proposed Plan for No Further Action
Improving Site Characterization in New Jersey Allan Motter, NJDEP
Welcome.
Environmental Issues Mapping Field Lab
Designing an Experiment
Designing an Experiment
A&WMA Regulatory Conference Symposium UST Risk Based Corrective Action
Preparing a Site Conceptual Model
Presentation transcript:

Preparing a Site Conceptual Model

Typical Site Management Problems: Site complexities  Complicated hydrogeology  Multiple contaminants of concern (COCs)  Multiple receptors/pathways Multiple phases of investigation and remediation Deliverables that are not stand-alone documents Changes in consultants Changes in regulatory oversight Case load

Common Outcome: An abundance of data Lack of clarity concerning the major site issues and how to move the site toward closure

Suggestion: Direct the Responsible Party (RP) to complete a Site Conceptual Model

Site Conceptual Model (SCM): EPA: A representation of site conditions developed using readily available (existing) data that illustrates the relationship between contaminants, retention/transport media, and receptors. EPA. November Using the Conceptual Site Model to Select Performance Standards and Develop Data Quality Objectives in the CAS.

Purpose: Organize information already known about the site Help identify additional information that must be obtained Suggest when site characterization is complete—i.e., if the SCM is not likely to significantly change upon collection of additional information, the existing data are adequate

SCM Presentation: The SCM is generally documented by written descriptions and supported by maps, geological cross-sections, tables, diagrams and other illustrations. EPA. November Using the Conceptual Site Model to Select Performance Standards and Develop Data Quality Objectives in the CAS.

SCM Support: 1)Local and regional plan view maps showing location of sources, extent of contamination (i.e., an interpretive drawing—not a plot of laboratory results), direction and rate of groundwater flow, and locations of receptors. “Receptors” include, but are not limited to, all supply wells within 2000 feet of the source area. Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 2)Cross-section maps showing subsurface geologic features, depth to groundwater, man-made conduits, monitoring well construction, and an interpretive drawing of the vertical extent of soil contamination (i.e., an interpretive drawing—not a plot of laboratory results) Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 3)Exposure evaluation flowchart (similar to Figure 2 in ASTM’s Standard Guide for Risk-Based Corrective Action Applied at Petroleum Release Sites) Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 4)Plots of chemical concentrations vs. time (e.g., if groundwater monitoring is being conducted, plots should be shown for each monitoring well which has had detectable levels of contaminants) Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 5)Plots of chemical concentrations vs. distance from the source Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 6)Summary tables of chemical concentrations in different media Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

SCM Support: 7)Boring and well logs (including construction/screening) Arulanantham, R. December Assessment and Management of MtBE Impacted Sites.

Summary: SCMs are a “big picture” look at a site contamination problem SCMs may help you through some common site management problems and clarify major site issues