Use only with permission of Susan Crosson Chapter 9 Standard Costing and Variance Analysis Fall 2007 Crosson.

Slides:



Advertisements
Similar presentations
Budgeting and Variances
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
11 Flexible Budgets and Overhead Analysis Chapter  See Chapter 10 notes for a discussion of the flexible budget  For a manufacturing firm, the flexible.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
© John Wiley & Sons, 2005 Chapter 11: Standard Costs and Variance Analysis Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Chapter 11: Standard Costs.
ACTG 321 Agenda for Lecture 14
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Using Variances under Standard Cost System
Standard Costing and Variance Analysis
Variance Analysis Chapter 7 Prepared by Diane Tanner
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Budgets and Variances continued: Production variances.
Manufacturing Overhead Variances Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 46.
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 The Flexible Budget: Factory Overhead Chapter Fourteen.
23 Performance Evaluation Using Variances from Standard Costs
Use only with permission of Susan Crosson Chapter 7 The Budgeting Process Fall 2007 Crosson.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Factory Overhead Planned, Applied & Actual
Controlling Manufacturing Costs: Standard Costs
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
Standard Costing and Variance Analysis
Chapter 2 Cost Concep Chapter 2 Cost Concepts and Cost Allocation Fall 2007 Crosson.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
© John Wiley & Sons, 2005 Chapter 11: Standard Costs and Variance Analysis Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management Measuring,
1 Adapted by Cynthia Fortin, CPA, CMA Introduction to Managerial Accounting, Brewer, Garrison,Noreen.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Flexible Budgets and Overhead Analysis Chapter 7.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Chapter 22. Prepare a flexible budget for the income statement.
Standard Costing and Variance Analysis
Chapter 9 Introduction to a Standard Cost System.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Variance Analysis: Manufacturing Overhead
Production Cost Variance Analysis
STANDARD COST.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 8A.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
20 Monitoring Performance in Cost, Profit and Investment Centers
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Managerial Accounting
Foundations and Evolutions
Standard Costs and Variances
Performance Evaluation Using Variances from Standard Costs
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
© 2017 by McGraw-Hill Education
© 2017 by McGraw-Hill Education
Presentation transcript:

Use only with permission of Susan Crosson Chapter 9 Standard Costing and Variance Analysis Fall 2007 Crosson

Use only with permission of Susan Crosson Learning Objectives: Responsibility Accounting & Cost Centers Cost Performance Evaluation using Master and Flexible Budgets Standard Costing Basics for Cost Centers Performance Evaluation using Standard Costing: Spending and Efficiency Variances Compute and Analyze DM,DL,VOH, and FOH variances

Use only with permission of Susan Crosson Responsibility Accounting: Cost Center: An information system that classifies data according to a manager’s responsibilities for organizational resources Manager accountable for costs that have well-defined relationships between the center’s resources and products or services.

Use only with permission of Susan Crosson Cost Performance Evaluation using Flexible and Master Budgets ACTUAL PRODUCTION FLEXIBLE BUDGET MASTER BUDGET Actual Output x Actual Quantity x Actual Cost Actual Output x Standard Quantity x Standard Cost Estimated Output x Standard Quantity x Standard Cost

Use only with permission of Susan Crosson What Do You Know? Flexible Budget Preparation Look and listen to SE5. P2 parts 3 & 4

Use only with permission of Susan Crosson P2 Cost Performance Evaluation ACTUALPRODUCTION (46,560) APRIL FLEXIBLE BUDGET (46,560) MASTER BUDGET (50,000) DM $4,975 DL $5,850 IDL $1,290 Supplies $ 960 VH&P $1,325 VO $2,340 FH&P $3,500 Depreciation $4,200 I&T $1,200 FO $1,600 Total $27,240 DM $.10 x 46,560= $4, DL $.12 x 46,560= $ IDL $.03 x 46,560= $ Sup. $.02 x 46,560= $ VH&P $.03 x 46,560= $1, VO $.05 x 46,560= $2, FH&P $3,500 Dep. $4,200 I&T $1,200 FO $1,600 Total $26,796 DM $5,000 DL $ 6,000 IDL $1,500 Sup. $1.000 VH&P $1,500 VO $2,500 FH&P $3,500 Dep. $4,200 I&T $1,200 FO $1,600 Total $28,000

Use only with permission of Susan Crosson Performance Evaluation using Flexible and Master Budgets ACTUAL PRODUCTION FLEXIBLE BUDGET MASTER BUDGET Actual Output x Actual Quantity x Actual Cost Actual Output x Standard Quantity x Standard Cost Estimated Output x Standard Quantity x Standard Cost Standard Costing

Use only with permission of Susan Crosson Standard Costing Basics: Master Budget Prepared for year As part of the Master Budget, Standard Quantities and Rates set for Materials, Labor, Variable Overhead and Fixed Overhead (i.e., predetermined rates—remember applied OH? During year Journal Entries use these Standards Managers monitor Cost Centers by computing and analyzing Price and Quantity Variances for Materials, Labor and Variable Overhead and Budget and Volume Variances for Fixed Overhead

Use only with permission of Susan Crosson Material, Labor, and Variable Overhead Variances ACTUAL PRODUCTION FLEXIBLE BUDGET Actual Output x Actual Quantity x Actual Cost Actual Quantity x Standard Cost Actual Output x Standard Quantity x Standard Cost Spending or Price or Rate Variance Efficiency or Quantity Variance

Use only with permission of Susan Crosson Use the following information to answer questions: The California Steel Works uses a standard costing system. BUDGET: BUDGET: The variable standard cost of producing one case of steel brackets is: Direct material (5 $1 per pound) $ 5.00 Direct labor (2 $2 per hour) $ 4.00 Variable overhead (2 $3 per hour) $ 6.00 Thus, total variable cost per case $ The predetermined overhead rate is $7 per direct labor hour ($3 VOH and $2 FOH). Based on a master budget of 20,000 cases. ACTUAL: ACTUAL: During the past accounting period the company produced 25,000 cases and the actual cost per case were: Direct material (5 $.90 per pound $ 4.50 Direct labor ( 2 1/4 $1.80 per hour) $4.05 Variable overhead ($148,750/25,000 cases) $ 5.95 The actual fixed overhead was $105,250.

Use only with permission of Susan Crosson Material, Labor, and Variable Overhead Variances ACTUAL PRODUCTION 25,000 cases (AAA) ACTUAL Quantity AT STANDARD Cost (AAS) FLEXIBLE BUDGET 25,000 cases ( ASS) DM: 25,000 x (5 $.90 per pound)= $112,500 DM: 25,000 x 5 x$1= $125,000 DM: 25,000 x (5 $1 per pound)= $125,000 DL: 25,000 x ( 2 1/4 $1.80 per hour)= $101,250 DL: 25,000 x 2 1/4 x$2= $112,500 DL: 25,000 x (2 $2 per hour)= $100,000 VOH: $148,750 VOH: 25,000 x 2 ¼ x$3= $168,750 VOH: 25,000 x (2 $3 per hour)= $150,000 Spending or Price or Rate Variance Efficiency or Quantity Variance

Use only with permission of Susan Crosson Material, Labor, and Variable Overhead Variances ACTUAL PRODUCTION FLEXIBLE BUDGET Actual Output x Actual Quantity x Actual Cost Actual Quantity x Standard Cost Actual Output x Standard Quantity x Standard Cost Favorable or Unfavorable Spending or Price or Rate Variance Favorable or Unfavorable Efficiency or Quantity Variance

Crosswalk to Variable Overhead Account Variable Overhead Actual VOH: Actual Output x Actual Quantity x Actual Cost Applied VOH: Actual Output x Standard Quantity x Standard Cost ( SAME AS FLEXIBLE BUDGET!!!) Underapplied aka Net Spending & Efficiency Variances Overapplied aka Net Spending & Efficiency Variances Dr. COGS xx Cr. OH xx Dr. OH xx Cr. COGS xx

Use only with permission of Susan Crosson Fixed Overhead Variances ACTUAL PRODUCTION MASTER or FLEXIBLE BUDGET APPLIED OVERHEAD ActualFixedOverheadBudgetedFixedOverhead Actual Output x Fixed Overhead Rate* * (Standard Quantity x Standard Cost) Budget or Spending or ControllableVariance Volume or Uncontrollable Variance

Crosswalk to Fixed Overhead Account Fixed Overhead Actual FOH:ActualFixedOverhead Applied FOH: Actual Output x Fixed Overhead Rate* * (Standard Quantity x Standard Cost) Underapplied aka Net Budget and Volume Variances Overapplied aka Net Budget and Volume Variances Dr. COGS xx Cr. OH xx Dr. OH xx Cr. COGS xx

Use only with permission of Susan Crosson Use the following information to answer questions: The California Steel Works uses a standard costing system. BUDGET: BUDGET: The variable standard cost of producing one case of steel brackets is: Direct material (5 $1 per pound) $ 5.00 Direct labor (2 $2 per hour) $ 4.00 Variable overhead (2 $3 per hour) $ 6.00 Thus, total variable cost per case $15.00 The predetermined overhead rate is $7 per direct labor hour ($3 VOH and $2 FOH). Based on a master budget of 20,000 cases. ACTUAL: ACTUAL: During the past accounting period the company produced 25,000 cases and the actual cost per case were: Direct material (5 $.90 per pound $ 4.50 Direct labor ( 2 1/4 $1.80 per hour) $4.05 Variable overhead ($148,750/25,000 cases) $ 5.95 The actual fixed overhead was $105,250.

Use only with permission of Susan Crosson Fixed Overhead Variances ACTUAL PRODUCTION BUDGET (MASTER or FLEXIBLE) APPLIED OVERHEAD $105,250$80,000* *(20,000 cases x $2/DLH x 2DLH) $100,000* * 25,000 cases x $4/case or 25,000 cases x $2/DLH x 2DLH Favorable or Unfavorable Budget or Spending or Controllable Variance Favorable or Unfavorable Volume or Uncontrollable Variance

Use only with permission of Susan Crosson What Do You Know? Compute and Analyze DM,DL,VOH, and FOH variances P4 Look and listen SE6, SE7, SE8.

Use only with permission of Susan Crosson What Do You Know? Variance Analysis P3 P7

Use only with permission of Susan Crosson Homework P4