1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.

Slides:



Advertisements
Similar presentations
Maynard Operation Sequence Technique (MOST)
Advertisements

Predetermined Motion Time Systems (PMTS)
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Operations Management Statistical Process Control Supplement 6
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Quality Management 09. lecture Statistical process control.
Ch. 29: Predetermined Time Systems
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Sections: Direct Time Study Procedure
Time Study Procedure - Overview
1 ISE Ch. 26: Predetermined Time Systems Frank and Lillian Gilbreth broke work into therbligs (elements). The next step is to assign time values.
WORK SAMPLING Lecturer: S.U.Seçkiner Source: Motion and Time Study Design and Measurement of Work.
2000 by Prentice-Hall, Inc1 Chapter 17 - Human Resources in Strategic Planning  TQM recognizes importance of employees  Education & training viewed as.
CHAPTER 8TN Process Capability and Statistical Quality Control
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 8 Human Resources in Operations Management.
Maintenance Work Measurement
Time Study Method Step 1...Selecting Work Elements Step 2...Timing the Elements Step 3...Determining Sample Size Step 4... Setting the Standard.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
IE 101-Industrial Engineering Orientation
1 EI441 Work Analysis and Design Text book: Motion and Time Study by R.M. Barnes, 7 th ed. (1980). Topics: 1.Introduction, Productivity, Definition and.
Productivity One of the most important responsibilities of an operations manager is to achieve productive use of organization’s resources. Productivity.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
INSY 3021 Auburn University Spring 2008 Performance Rating.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
Chapter 4 Process Design.
Work Study Process Analysis Operation Analysis (Micro) Motion Study
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Statistical Process Control (SPC)
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
Statistical Quality Control/Statistical Process Control
CONFIDENCE INTERVALS.
Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Work Measurement Vital inputs for: Standard Time
MICROMOTION STUDY It is a technique for recording and timing an activity. It consists of taking motion pictures of the operation with a clock in the picture.
Job Analysis. The process of collecting and organizing information about jobs performed in the organization and the principle elements involved in performing.
Process Capability and Statistical Quality Control.
Predetermined Time Systems
7 Design of Work Systems.
Work Sampling Sections: How Work Sampling Works – part 1
Work Study Process Analysis Operation Analysis (Micro) Motion Study
7 Design of Work Systems.
WORK STUDY WORK MEASUREMENT JOSEPH GEORGE KONNULLY.
WORK STUDY WORK MEASUREMENT.
Introduction to Methods Engineering
Operations Management Work Measurement Supplement 10
Chapter 25 Time Study Supplementary Material from:
Predetermined Time Systems
JOB DESIGN Work Measurement.
RECORDING TECHNIQUES.
Ch. 29: Predetermined Time Systems
Predetermined Motion Time Systems
Predetermined Motion Time Systems
Predetermined Motion Time Systems (PMTS) BY okolie jude…………
Work Study Process Analysis Operation Analysis (Micro) Motion Study
Predetermined Motion Time Systems (PMTS)
Work Study Process Analysis Operation Analysis (Micro) Motion Study
Principles of Marketing
(Lecturer in Mech. Deptt.)
Production and Operations Management
Chapter 12 Inference for Proportions
Presentation transcript:

1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement Direct time study Predetermined time system Standard time data Work sampling

2 Systematic procedure that divides an operation into motions or work elements, with a set of time data assigned to each elements Allowance excluded Various available systems, for examples Work - Factor System Method - Time Measurement (MTM)

3 Developed from 4-year implementation of Micromotion study Employed in 1938 Four techniques: Detailed Ready Brief Mento-Factor

4 Body Members Finger, Hand, Arm, Body, Leg, Foot, etc. Distance by Inch Weight & Resistance Manual Control Basic, Definite stop, Directional control, Care, Change of direction Time Unit: 1/10,000 min

5 Body Members Distance by Inch Weight & Resistance Manual Control T, FT, L, HT F, H, A, FS 0 = Basic 1, D = Definite stop 2, S = Directional control 3, P = Care 4, U = Change of direction

6 A10 Description of job: ….. Time Required: …... A30WS Description of job: ….. Time Required: …..

7 More Focus on Basic elements First developed for Drill Press Work Time Unit: 1/ 100,000 hr (TMU, min) A family of MTM

8 Transport (Reach & Move) Grasp Pre-Position Assemble Use (Manual, Process or Machine) Disassemble Mental Process Release

9 Reach Class of Reach: A - E Distance measured in Inch Motion of hand Example: R8C, Time Unit= 11.5 Equivalent to …… Min.

10 Move Class of Move: …….. Load measured in ……. Motion of hand ?? Example: mM10C, Time Unit= …... Equivalent to …… Min.

11 Trial time study, Based on work instruction & work station layout Verify time data, Compared to Direct time study Applicable to most of jobs No Rating Factor Facilitate Motion-Minded training Tools & equipment Design / Setup Estimate processing time required for cost estimation

12 Selection of Various Systems Well trained analyst ????

13

14 Applications 1)Determine machine utilization / downtime 2)Determine allowances 3)Establish time standards Concept: To find out the proportions of total time devoted to various activities that constitute a job, by taking a large number of observations at random times.

15 Basic idea Random sampling over a long period of working hour Binomial distribution: p,q ratio out of n observations, which approaches Normal distribution when n is large n pq Distribution of a proportion: at 95%CI and +/- 5% relative accuracy, Z = 1.96 Mean, proportion of working time = p Standard Deviation =

16 0) Obtain cooperation from all concerns 1)Trial observations or a past record 2)Determine the number of obs. needed: Alignment chart 3)Design data collection procedure a. Observer: number of person, position b. Period of the study c. Time table for daily random observation d. Observation sheet 4)Assure 95% CI and +/- 5% relative accuracy 5) Calculate utilization ratio or standard time

17 Table of Random Numbers Daily working hours Frequency of daily obs. Routes of observation Observation sheet Observe At First sight Data Summary and control Recheck CI and accuracy level

18 Control Chart (P chart) is to make sure every reading is in normal condition mean UCL = p + 3sigma LCL = p - 3sigma day p, daily mean = expected value of relevant proportion, p sigma = standard deviation of p 3 sigma = 99.7% of population should fall within the range

19 P chart: To detect unusual situation during the study Within chart values Out of chart values Reasons of the unusual daily p a) accident b) lack of proper production flow c) a change in expected value of p reconstruct the p chart, using the new information

20 95% CI & +/- 5% relative accuracy Alignment chart or Table for determining the number of obs. given degree of accuracy, value of p at 95% CI Table for determining the degree of accuracy given number of obs., value of p at 95% CI

21 total output during total time Rep. Time = (total time spent) (proportion) Normal Time = Rep. Time (Performance Index) Std. Time = Normal Time + Allowances

22 Advantages: compared with Direct time Study No continuous observation Normally less cost Study crew operation by one analyst Study long cycle time operation Easy to observe Don’t need specialist Operator would not feel under too much attention

23 Disadvantages No details about operation Not suitable for short cycle task ??