CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.

Slides:



Advertisements
Similar presentations
HEAT PUMPS.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
G2P Target installation and Beyond. Schedule Pivot before.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Boiler Mountings.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Progress and Plan for Superconducting RF Cavity RF Group.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
Burle Leak Check 3/19/2012 Jeff Williams Jun Xie.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Installation of the T600 at Fermilab Fermilab, February 15,
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Installation of the T600 at Fermilab
Completion of the MICE-US construction project
Proximity Cryogenics P&IDs meeting
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Definition of work flow for string DESY Example on critical operation
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
PANDA The conceptual design of the control Dewar
SNS PPU Cryomodule Instrumentation
Vacuum System Design for the Target Monolith System
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At 15:16 on 1/10/12 a vacuum burst occurred while Nitrogen Shields were at ~ 120K and the insulating vacuum suddenly declined from 1E-6 to 3 Torr. –Safety interlock system closed gate valves, protecting turbo pumps and RGA. 2/6/12NML Weekly Meeting - Updated1

Plot of Vacuum Event 2/6/12NML Weekly Meeting - Updated2

Diagnosis of Problem Investigation –1/10 evening shift and 1/11 day shift conducted studies that determined it was a leak from Nitrogen circuit to insulating vacuum Installed roughing pumps on insulating vac. and connect RGA via bypass line to insulating vacuum space. Used RGA and vacuum gauges to test each of the circuits (2 He. And 1 Nitrogen) Results –Both Helium circuits showed no response (Good) –Nitrogen circuit showed a direct vacuum and RGA response –Vacuum was worse at upstream end of CM1 2/6/12NML Weekly Meeting - Updated3

Pressurizing Nitrogen 2/6/12NML Weekly Meeting - Updated4

Detailed Investigation Next Step –Since leak was big enough that there was no hope of recovering insulating vacuum and/or cooling down 80K shields, decision was made to warm up, locate leak, and repair. Pinpoint Leak –Cryo (Jerry Makara), TEV (Scott McCormick), and NML vacuum (Ron Kellett) experts led leak checking and repair efforts. At Room temp., first verified warm leak, then connected (3) leak detectors (upstream, downstream, and on feedbox) tied into TEV chart recording cart, to give real-time comparison of response by each detector. Flowed trace amount of helium into Nitrogen circuit from upstream feedbox and monitored response on leak detectors. 2/6/12NML Weekly Meeting - Updated5

Leak Check of CM1 2/6/12NML Weekly Meeting - Updated6 Path of Helium Flow

Plot of He Leak Check The leak detector test with helium showed the feed cap interface (green) responding first, followed by the feed can (red), and the end cap (blue). The delay is ~10 sec. 2/6/12NML Weekly Meeting - Updated7

Additional Leak Checks Leak detector positions were swapped and test was repeated –To verify the results were not equipment dependent (slower response time, etc.) –Results were consistent with first test Additional tests were done to try to pinpoint if leak was in supply or return line –Introduced He from downstream end, with supply line pressurized with Nitrogen and return line venting (to force He to only go through return-line path) –Introduced He into downstream end, with Nitrogen supply off (to repeat initial test, but with He coming from other end) 2/6/12NML Weekly Meeting - Updated8

Repair Leak check and vacuum readings were all consistent and point towards leak at upstream interconnect region, supply side (possibly weld, bellows, or feedthru?) Repair Plan –Isolate all gas sources ✔ –Vent CM1 insulating vacuum ✔ –Open upstream bellows ✔ –Remove insulation and shields to expose Nitrogen interconnects ✔ –Inspect and leak check as necessary to find leak ✔ –Repair leak ✔ –Certify repair ✔ –Close up and cooldown ✔ 2/6/12NML Weekly Meeting - Updated9

Repair – Update (1/27/12) Large bellows on upstream end was opened and insulation and shields were removed. –Initial visual inspection did not show any obvious problem. –Leak check of Nitrogen circuit by pressurizing with Nitrogen and using “Snoop” showed a leak at the supply side temperature sensor feedthrough. Upstream Supply and Return temp. probes were removed and flanges blanked. New surface mounted sensors were installed at each location. Helium leak check was conducted to verify there were no leaks in Nitrogen circuit, and feedthru flanges were thermal shocked using liquid Nitrogen to verify they are leak tight. 2/6/12NML Weekly Meeting - Updated10

Repair – Update (1/27/12) 2/6/12NML Weekly Meeting - Updated11 Blanked Feedthru Leak indicated by bubbling “Snoop”Upstream LN2 Supply Line Surface Mounted Sensor

Repair – Update (2/1/12) Surface mounted sensors were tested. Copper shields and superinsulation were installed on upstream end. Large bellows was closed and secured. Pump down of insulating vacuum and leak check was conducted. Nitrogen line and insulating vacuum space leak tight. Turbo pumps turned on. Cooldown started. 2/6/12NML Weekly Meeting - Updated12

Timetable 1/4 – 1/6: Warmup (~ 50 hours) 1/7 – 1/8: Weekend 1/9: Began Cooldown 1/10: Vacuum burst at 15:16, spent night shift troubleshooting 1/11: Troubleshooting during day shift (using RGA and vacuum levels), determined it was a Nitrogen leak, decision to warm up, began warm-up in evening 1/12: warm-up continued 1/13: warm-up continued, installed 3 leak detectors 1/14 – 1/16: Holiday weekend 1/17: warm-up complete, leak checked, determined problem at upstream interconnect 1/18-1/19: leak check continued, problem suspected at upstream supply interconnect 2/6/12NML Weekly Meeting - Updated13

Timetable 1/20: Isolated gas supplies, vented insulating vacuum 1/21-1/22: Weekend 1/23: Upstream bellows opened, shielding & insulation removed, visual inspection 1/24: “Snoop” leak check found leak in upstream supply temp. feedthru, Nitrogen supply isolated 1/25: Removed supply and return side temp. probes and blanked- off feedthrus. He leak check of Nitrogen circuit to verify no leaks. 1/26: Repeated leak check and thermal shocked blanked feedthrus with liquid Nitrogen. 1/27: Completed installation of surface mounted sensors 1/28-1/29: Weekend 1/30: Tested temp. sensors, installed shield and insulation, closed large bellows, turned on pumps and did initial leak check 2/6/12NML Weekly Meeting - Updated14

Timetable 1/31: Turbo pumps turned on, final leak checks conducted. Ready for cooldown 2/1-2/3: Cooldown 2/4-2/5: Weekend 2/6: Cooldown completed 2/6/12NML Weekly Meeting - Updated15