LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
31 October 2006 M. De La Peña Software Cross-Training Session LBT TCS - ECS 1 Enclosure Control System (ECS) Michele De La Peña.
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Design and Programming Chapter 7 Applied Software Project Management, Stellman & Greene See also:
Specview 32 Release 2.5 Enhancements
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
T Project Review Sotanorsu I3 Iteration
Prepared by: Steve Teo Contributors: Tong Huu Khiem.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
Bar Code Scanning Senior Capstone Experience By: Rachel R. Rouse.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Proctor Caching and System Check September 4, 2014 Becky Hoeft Conference Number: (877) Conference Pin:
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Chapter 6 : User interface design
Status of NA62 straw readout
5 SYSTEM SOFTWARE CHAPTER
5 SYSTEM SOFTWARE CHAPTER
Presentation transcript:

LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard

6-Apr-2009LBT Q Eng/SW Review Highlights (Q1/2009) James Howard taking over for Jonathan Kern on HBS James Howard taking over for Jonathan Kern on HBS

6-Apr-2009LBT Q Eng/SW Review Open Issues Technical Technical PLC Control law remains unknown, but documentation is available PLC Control law remains unknown, but documentation is available Capillaries installed Capillaries installed Schedule Schedule None None Financial Financial None None Resource Resource Mountain and Tucson support pacing operation Mountain and Tucson support pacing operation

6-Apr-2009LBT Q Eng/SW Review Progress (Q1/2009) From last review: From last review: Continue Installation El capillaries at the pads (next week) Continue Installation El capillaries at the pads (next week) Describe new control laws correcting: Describe new control laws correcting: pressure OK pressure OK system shutdown when pocket pressures fail system shutdown when pocket pressures fail control around pressure, not lookup table (LBT) control around pressure, not lookup table (LBT) Rewrite PLC code using new control laws (VoltsDC) Rewrite PLC code using new control laws (VoltsDC) MCSPU software revisions: MCSPU software revisions: Use new CTI PLCIO_rev-4 to communicate with Siemens HPLC Use new CTI PLCIO_rev-4 to communicate with Siemens HPLC Display detailed HBS status in Eng. Interface display page Display detailed HBS status in Eng. Interface display page Add telemetry of HBS tags to MCSPU for diagnostic purposes. Add telemetry of HBS tags to MCSPU for diagnostic purposes. Modify HBS Control/monitor State machine to use newly available tags Modify HBS Control/monitor State machine to use newly available tags Expand and Amend HBS Command set as needed (Q4 ?) Expand and Amend HBS Command set as needed (Q4 ?) MCS needs to copy HBS status info into shared memory for rest of TCS. MCS needs to copy HBS status info into shared memory for rest of TCS. Add HBS information and commands to MCS GUI Add HBS information and commands to MCS GUI

More Progress MCSPU is now communicating with the HBS Siemens PLC over ethernet. There are some occasional problems with that and code has been put in the latest rev. of MCSPU to attempt to diagnose and to re-initialize the connection in the event of a comm. failure. MCSPU is now communicating with the HBS Siemens PLC over ethernet. There are some occasional problems with that and code has been put in the latest rev. of MCSPU to attempt to diagnose and to re-initialize the connection in the event of a comm. failure. The Engineering Interface now has 4 new HBS display pages. The Engineering Interface now has 4 new HBS display pages. Work on an HBS GUI as part of the MCS GUI has begun. Work on an HBS GUI as part of the MCS GUI has begun. VoltsDC got WinCC to display temperatures correctly, but that broke the ability to force values, so work continues VoltsDC got WinCC to display temperatures correctly, but that broke the ability to force values, so work continues Conceptual design for a variable capillary is being turned into a prototype, for testing next week. Conceptual design for a variable capillary is being turned into a prototype, for testing next week. Oil temperature – we are starting to understand what temperature to set it to, and how to do it. Oil temperature – we are starting to understand what temperature to set it to, and how to do it. Hysteresis value appears to work, need to determine what value it should be. Hysteresis value appears to work, need to determine what value it should be. 6-Apr-2009LBT Q Eng/SW Review

6-Apr-2009LBT Q Eng/SW Review

6-Apr-2009LBT Q Eng/SW Review

6-Apr-2009LBT Q Eng/SW Review Planning (Q2/2009) Continue Installation El capillaries at the pads, possibly with variable capillaries Continue Installation El capillaries at the pads, possibly with variable capillaries Control oil temperature Control oil temperature Set hysteresis value Set hysteresis value Continue coming up to speed on HBS Continue coming up to speed on HBS