Machine Protection TTF Martin Staack DESY MVP TTF2 Review Meeting at Salzau, 20.-22. January 2003.

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
MIKE AMBRISCO Solar Charging Systems. Overview Background info.  Why do we need a charging system?  What happens without a charging system?  What does.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
Paul Chu FRIB Controls Group Leader (Acting)
MICE Target Review Chris Booth Sheffield 12 th June 2006.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Global accelerator TTF Raimund Kammering DESY MVP TTF2 Review Meeting at Salzau, January 2003.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
The Machine Protection System for the European XFEL E. Castro on behalf of the MPS team
TESLA Test Facility TTF II Review Meeting, Salzau, January 2003 Introduction to the Electron Beam Diagnostic Session Dirk Nölle DESY, MPY
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
M. Körfer, DESY Salzau Light guide dosimeters and loss monitors H. Henschel, J. Kuhnhenn Fraunhofer-Gesellschaft INT M. Körfer, K. Wittenburg.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
CERN Timing Workshop, Geneva, 15 Feb Geneva, 15 Feb 2008 Franck Di Maio – ITER IO Geneva, 15 Feb 2008 Franck Di Maio – ITER IO CERN Timing Workshop.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
NML Machine Protection System (MPS) Arden Warner Fermilab August 2 nd, 2007.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
ILC Machine Protection System (MPS) MPS ≡ collection of devices intended to keep the beam from damaging machine components. both from damage caused by.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Summary of Session 1 - CLIC MP workshop 6-8/6/2012, R.Schmidt 1.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Registered participants participants from outside Cern.
Introduction; Machine protection, experience and challenges: Review of existing solutions and challenges faced by future installations Purpose of machine.
ILC Beam Instrumentation – Introduction Remarks –
RF acceleration and transverse damper systems
Dependability Requirements of the LBDS and their Design Implications
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
M.Jonker CTC MPO-WG status
FMEA PROCESS FLOW Causes/ failure mechanisms Product definition
Notes on Machine Protection for long bunch trains
Diagnostics overview and FB for the XFEL bunch compressors
RF Local Protection System
BCM-BIS Interface Szandra Kövecses
3 GHz and 30 GHz Conditioning Programs
The LHC Beam Interlock System
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
Powering scheme for Hollow Electron Lens
Close-out.
ODH Monitoring System Yong Kian Sin Personnel Safety System
Presentation transcript:

Machine Protection TTF Martin Staack DESY MVP TTF2 Review Meeting at Salzau, January 2003

Martin Staack, DESY MVP22. January What is the purpose? The Machine Protection System... switches off the beam in case of subsystem failure protects the accelerator from damage minimizes activation by beam losses manages beam permissions displays information about machine status collects information about subsystem failures

Martin Staack, DESY MVP22. January Main Components of the MPS Collimators passive machine protection PLC „Beam Interlock System“ (BIS) processing slow Interlock signals (ms)processing slow Interlock signals (ms) manage Operation Modes and Beam Modesmanage Operation Modes and Beam Modes processes status information for the control systemprocesses status information for the control system Beam Interlock Concentrator (BIC) processing fast Interlock signals (2-3 µs)processing fast Interlock signals (2-3 µs) Photomultipliers, Toroid system fast Beam Loss detection

Martin Staack, DESY MVP22. January TTF Operation Modes...are determined by Machine settings

Martin Staack, DESY MVP22. January TTF Beam Modes Beam TTF... Long Pulse Train (800µs) Short Pulses (10 bunches) Single Bunch No beam...are determined by Operation Mode Collimator and Screen positions Beam losses Operator wishes

Martin Staack, DESY MVP22. January Signal flow in the MPS

Martin Staack, DESY MVP22. January Overview over the MPS

Martin Staack, DESY MVP22. January Laserinterlock Laserinterlock (Siemens PLC) protects the Laser from damage in case of subsystem failureprotects the Laser from damage in case of subsystem failure provides information about system statusprovides information about system status processes status information for the control systemprocesses status information for the control system independent system for the backup laserindependent system for the backup laser

Martin Staack, DESY MVP22. January The end