2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon.

Slides:



Advertisements
Similar presentations
Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
Advertisements

SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
European VLBI Network of Radio Telescopes - a killer application for Grid ? - Mike Garrett FP6 GRID Meeting, March 2003.
Arecibo 40th Anniversary Workshop--R. L. Brown The Arecibo Astrometric/Timing Array Robert L. Brown.
NAIC-NRAO School on Single-Dish Radio Astronomy. Arecibo, July 2005
Project Partners Project Collaborators The Council for the Central Laboratory of the Research Councils Funded by EPSRC GR/T04465/01
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
MmVLBI in the Future: technical/experimental Shep Doeleman Haystack Observatory.
27/09/06 D. Fenech Jodrell Bank Observatory Supernova Remnants in the Central Starburst Region of M82 EVN Symposium 2006.
7th US VLBI Technical Meeting at Haystack Observatory, November 3-4, 2009 Arecibo VLBI Report Arecibo VLBI Team: V. Arun, R. Ganesan, T. Ghosh, C. Salter.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Panorama of the Universe: Daily all-sky surveys with the SKA John D. Bunton, CSIRO TIP, Ronald D. Ekers, CSIRO ATNF and Elaine M. Sadler, University of.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI: Science with Multi-Gigabit Global Networks Dr Shaun Amy (Dr Chris Phillips, Dr Tasso Tzioumis) Australia Telescope National Facility 22 January.
GÉANT and The Future of Pan-European Networking CCIRN, 3 rd July 2004 John Boland CEO HEAnet Member of DANTE Board of Directors.
Supernovae and Masers in Arp220: Pushing the limits of VLBI sensitivity Supernovae and Masers in Arp220: Pushing the limits of VLBI sensitivity P.J.Diamond.
E-VLBI: Connecting the Global Array of Radio Telescopes through High-Speed Networks Participating U.S. organizations: MIT Haystack Observatory MIT Lincoln.
Marcin Okoń Pozna ń Supercomputing and Networking Center, Supercomputing Department e-Science 2006, Amsterdam, Dec Virtual Laboratory as a Remote.
21 st Century VLBI Mike Garrett (JIVE) Astro-lunch, 16 April
Trial on the Efficient Use of Trunk Communcation Lines for VLBI in Japan Noriyuki Kawaguchi NATIONAL Astronomial Observatory,Japan eVLBI Workshop
An African VLBI network of radio telescopes as an SKA precursor Michael Gaylard Hartebeesthoek Radio Astronomy Observatory (HartRAO) P. O. Box 443, Krugersdorp.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
High Bandwidth Data Acquisition and Network Streaming in VLBI Jan Wagner, Guifré Molera et al. TKK / Metsähovi Radio Observatory.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
High Sensitivity VLBI Sheperd Doeleman MIT Haystack Observatory.
High Rate Internet Data Transfer for eVLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester All Hands Sept 2005.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
1 Gbps Disk-Based VLBI Observation for Future East Asia VLBI Observations Kiyoaki Wajima 18 March 2009 동아시아 VLBI 워크샵 Yamaguchi University Introduction.
E-VLBI: Creating a Global Radio Telescope via High-Speed Networks Alan R. Whitney MIT Haystack Observatory SLAC Data Management Workshop 17 March 2004.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
Research Networks and Astronomy Richard Schilizzi Joint Institute for VLBI in Europe
Extragalactic Absorption Lines Observed from Arecibo Chris Salter (National Astronomy & Ionosphere Center, Arecibo Observatory, Puerto Rico)
Arecibo (JIVE/EXPReS +) Presented by : Tapasi Ghosh Other active players: Arun Venkataraman, Chris Salter, & Emmanuel Momjian. A brief history.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
NAIC’s 2009 Program Plan & Budget Presentation December 2008 Radio Astronomy & Future Plans (Continued) Chris Salter (NAIC, Arecibo Observatory)
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
The Future of the VLBA 27 & 28 January 2011 Arecibo, the VLBA and the HSA Chris Salter Arecibo Observatory (National Astronomy & Ionosphere Center) ‏
Fig. Blazar Sequence ( Fossati et al ) Blazar ・・・ ⇛ Blazar Sequence( Fossati et al ) This characteristic was discovered among bright blazars.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
A Global 86 GHz VLBI Survey of Compact Radio Sources Sang-Sung Lee MPIfR In collaboration with A.P. Lobanov, T.P. Krichbaum, A. Witzel, J.A. Zensus (MPIfR,
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
Arecibo’s Existing VLBI Capability Arecibo’s Existing VLBI Capability DAR - VLBA4 MK5A Max 1-GHz IF The Big Dish (Gain~10k/Jy,SEFD~3-5 Jy)‏ Correlator.
AUSAC March Arecibo Tapasi Ghosh, Chris Salter, Arun Venkataraman Outline: 1. The Present Capability & Operations 2. Post-painting Observations.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
2005/7/131 Plans and Options for e-VLBI on the VLBA Jon Romney NRAO, Socorro 4 th e-VLBI Workshop 2005 July 13.
Mapping the U.S. Scientific Future in VLBI ftp.aoc.nrao.edu/pub/VLBIfuture VLBI Future Committee: Shep.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
Current Network Architecture. First eVLBI with JIVE: September 2004 The first eVLBI test observations took place on Sept. 10, The source, ,
Data delayed Real Time Data Transfer for Very Long Baseline Interferometry Simon Casey, Richard Hughes-Jones, Stephen Kershaw, Ralph Spencer, Matt Strong.
Data-Acquisition and Transport – Looking Forward to 2010 and Beyond Definition of ‘Data-Acquisition and Transport’ Continuum of Transport Options Limitations.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Very Long Baseline.
About JVN about JVN Status Status Results Results Future plans Future plans Japanese VLBI Network (JVN): recent results and future plans for EAVN Kenta.
EInfrastructures: Usage Policy Mike Garrett Joint Institute for VLBI in Europe (JIVE, Dwingeloo, The Netherlands) eInfrastructure meeting, Dublin, April.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
A potted outline of the EVN data
SA1: overview, first results
Arecibo (JIVE/EXPReS +)
A Jet Driven γ-Ray Burst Event?
The 40m YEBES RT and the HSA
SA1: third year overview
Presentation transcript:

2006 AUSAC Meeting VLBI/eVLBI with the 305-m Arecibo Radio Telescope Arecibo VLBI Group Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman (Jon Hagen)

2006 AUSAC Meeting VLBI Operations Telescope proposals: 28 (10 HSA, 15 Global/EVN, 3 e-VLBI) Observing Runs : 40 (14 HSA, 18 Global/EVN, 5 eVLBI, 3 NME) Standard Operations at 1Gbit/s from Feb-2005 Operations at 327 MHz, L-, C-, and X-bands No. of VLBI runs: 2001=12, 2002=15, 2003=16, 2004=24, 2005=36. eVLBI in eVLBI continuum demonstrator on March 05 Sustained operations at 32 Mb/s (occasional fringes at 64Mb/s) Joined EXPReS Consortium (funded Oct. 05) Demonstration of eVLBI to E.C. Science Commissioner, July 05

2006 AUSAC Meeting eVLBI Advantages No need for disks/tapes. Speed at which results are obtained. Target of Opportunity. Real-time monitor of Station reliability. Reduced manpower at VLBI station. No longer observing blind. Disadvantages Fear of single point failure. No multi-pass correlation. Loss of low bandwidth stations. Presently lower max bit rate than disks. Capital and recurring costs of links.

2006 AUSAC Meeting Data Path to JIVE  PRISANET (PR) of the Arecibo Obs./UPR.  AMPATH (US) of Florida Intl. Univ.  Abilene (US) of Internet 2.  SURFnet (NL) of SURFnet BV. Data rate: 32 Mbps. DAR/Formatter MK5 JIVE in2net

2006 AUSAC Meeting EXPReS Objectives: 1) Create production-level e-VLBI service. 2) Reliable telescope connection to the JIVE correlator via Internet. 3) Data flow of up to 16 Gb/s into correlator via infrastructure of trans-continental dimensions and capability of generating real-time cosmic radio source images. 4) Design and prototype hardware, software and data transport services to support future e-VLBI facilities with net data flows of hundreds of Gb/s.

2006 AUSAC Meeting e-VLBI Plans & Possibilities Need to upgrade Mark-5 system (~$5k). –Faster CPU –Gb/s ethernet Present link from AO is shared OC-3 (155 Mb/s) –Cannot sustain > 32 Mb/s to JIVE In near term focus on optimizing OC-3 link –Reserve bandwidth (at a cost) –More efficient protocols (TCP variants) Update observatory switch to be OC-12 (655 MB/s) compatible (~$20k). If available, OC-12 may cost $200k/month at present. Cheaper fiber expected after communication link to St. Croix established.

2006 AUSAC Meeting High-SensitivityVLBI Science - I D. Hough (Trinity U. Tx.) & C. Aars (Angelo State U, Tx) Search for pc-scale jets in extremely faint FRII Radio Galaxy Nuclei. RMS noise =10  Jy/beam Peak flux=1.5 mJy (3C34), 4 mJy (3C132)

2006 AUSAC Meeting High-Sensitivity VLBI Science - II Extragalactic Supernova Remnants SN2001em 18-cm eVLBI; Garrett et al. 3.5-cm HAS; Bietenholz & Bartel Odd SN thought possibly to be an off-axis GRB. VLBI shows this to be unlikely as source is not Expanding relativistically. SN1979C 6-cm HAS; Bartel & Beitenholz Shell structure revealed in this SNR for The first time. Peak brightness = 230  Jy/beam

2006 AUSAC Meeting High-Sensitivity VLBI Science - III Nuclei of ARP cm Global; Lonsdale et al. RMS=5.5  Jy /beam; Linear resolution ~ 1 pc Detect 49 point sources with 60  Jy < S < 1.2 mJy. Four of the sources are new, implying an SN- rate of 4  2 per year in ARP cm 1Gbps EVN; Parra & Conway Observed Arp220 for 10 min (rms=30  Jy/beam) as part of 100 source ULIRG sample. First two 5-GHz detections in Arp220, neither coincident with 18-cm compact sources. Western detection confirmed with VLBA archive data & 18-cm ToO data, believed to be ultra-luminous SNs similar to SN1986J.

2006 AUSAC Meeting Current & Near-Future Activities Continue support of HSA and Global/EVN arrays. For 2005, five e-VLBI tests scheduled, starting 16 March. Purchase more Mark-5 disc packs. Offer has been made to host the next EVN Technical Operation Group (TOG) meeting of EVN at Arecibo. When available, upgrade to Mark-5B. Explore options for a supplementary antenna to improve efficiency of phase-referenced VLBI, etc.

2006 AUSAC Meeting Timeline The post-upgrade 305 m Arecibo radio telescope became a part of the VLBI network in late 1990s for the HALCA mission of the Japanese VSOP project (S2 recorder). In 2001, Arecibo acquired its hybrid tape-based VLBA-Mark IV (VLBA4) recording system. In 2004, the Observatory procured its Mark 5A disk-based recording system, enabling the largest telescope in the world to become electronically connected to other radio telescopes in the world in real time via eVLBI observations.