1 © 2011 Infosys Ltd. ERP Testing Challenges– Need for a Stable Test Environment Presented At STEP AUTO 2011 – ERP testing Conference – Dec 8, 2011 by.

Slides:



Advertisements
Similar presentations
High level QA strategy for SQL Server enforcer
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Configuration Management
Workshop on the Strengthened Approach to Supporting PFM Reform PFM Performance Measurement Framework And Procurement Pamela Bigart World Bank.
IFMIS IMPLEMENTATION IN MALAWI BY RECKFORD KAMPANJE ACCOUNTANT GENERAL ‘Implement it’
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
Know the Difference™ Incident Investigation Solution Martin Perlin Marketing Director, Evolven A HIGH STAKES RACE AGAINST TIME Prevent high impact IT environment.
Predictor of Customer Perceived Software Quality By Haroon Malik.
QAAC 1 Metrics: A Path for Success Kim Mahoney, QA Manager, The Hartford
15 October th INTOSAI KSC Steering Committee Meeting in Cairo.
Systems Engineering in a System of Systems Context
Modern Project Management CHAPTER ONE Student Version McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
University of Southern California Center for Systems and Software Engineering Assessing the IDPD Factor: Quality Management Platform Project Thomas Tan.
Wireless Directions University of California, Davis Wireless Technology Team February, 2001.
Performance Testing Design By Omri Lapidot Symantec Corporation Mobile: At SIGiST Israel Meeting November 2007.
Software Testing and QA Theory and Practice (Chapter 16: Test Team Organization) © Naik & Tripathy 1 Software Testing and Quality Assurance Theory and.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
Load Test Planning Especially with HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
1 Chart of Account Conversion May 21, 2009 Presented by Matt Adelman.
National Grant Partnership February 12, 2009 Michael Pellegrino.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Management Information Systems
Ch.4: QA in Context  QA and the overall development context Defect handling/resolution How alternative QA activities fit in process Alternative perspectives:
Know the Difference™ ITIL Solution Martin Perlin Marketing Director, Evolven BOOST YOUR ITIL ® INITIATIVES Evolven Comparison assists in many ITIL v3 areas.
Agile Assimilation & Scaling. 2  About me…  How did we start?  Bottom-up  Task Force  Learning  Pilots  First stage analysis + recommendations.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Title Consultation on the 7 th replenishment of IFAD’s resources IFAD’s operating model : overall structure and components Consultation on the 7th replenishment.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
Balamurali L Senior SQA Manager Diana Ambrose Senior Lead SQA Arun Kumar V Senior Engineer QA
Managing Risk Through Performance Measurement FIRMA Risk Management Training Conference Lori Loken-King - SVP Union Bank, N.A., Operational Risk Management.
Installation and Maintenance of Health IT Systems
 CS 5380 Software Engineering Chapter 8 Testing.
© 2006 IBM Corporation Business Partnering and DITA Carolyn Henry Mary Paquet Jennifer Wickman.
Modern Project Management CHAPTER ONE Student Version McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
A simple performance measurement framework A good performance measurement framework will focus on the customer and measure the right things. Performance.
Lean Six Sigma in MIDAS 1. Lean Six Sigma (LSS) Defined Lean Six Sigma is a recognized industry best practice for business improvement which focuses on.
1 © 2011 Infosys Ltd. Pay Per Test Case Presented At STEP AUTO 2011 – ERP testing Conference – Dec 8, 2011 by Jitendra Atale, Project Manager – Package.
Managing Regulatory Changes June 24, Regulatory Change Management Critical Component of successful overall regulatory compliance risk management.
Top Down View of Estimation Test Managers Forum 25 th April 2007.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Optimizing Live Migration of Virtual Machines across Wide Area Networks using Integrated Replication and Scheduling Sumit Kumar Bose, Unisys Scott Brock,
WARNING IT projects are a Health Hazard a look at major risks in IT projects.
Bridging the Gap: The Role of the Private Sector in Climate Change Adaptation Richard Welford Chairman, CSR Asia Adaptation Knowledge Platform Learning.
Release Management at Xilinx Dilip Deshpande January 24 th, 2006.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Got Data? A Guide to Data Preservation in the Information Age Written by Francine Berman Presented by Akadej Udomchaiporn.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
1 Summarize from: Sustainability of ERPS performance outcomes: The role of post-implementation review quality Nicolaou A. and Bhattacharya S. International.
1 Deloitte Consulting LLP Predictive Modeling for Commercial Risks Cheng-Sheng Peter Wu, FCAS, ASA, MAAA CAS 2005 Special Interest Seminar Chicago September.
PD 8 OSFI Capital Update Stuart Wason Senior Director Actuarial Division OSFI CIA Appointed Actuary Seminar September 18, 2009.
Object-Oriented and Classical Software Engineering Eighth Edition, WCB/McGraw-Hill Stephen R. Schach 1.
LIFE CYCLE OF AN ENTREPRENEURIAL VENTURE
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Practical IT Research that Drives Measurable Results Vendor Landscape Plus: Enterprise Content Management Suite ECM: A vendor marketing concept, not an.
System Software Laboratory Databases and the Grid by Paul Watson University of Newcastle Grid Computing: Making the Global Infrastructure a Reality June.
Planning for Application Recovery
“Its All In The Numbers” – Predictive Analytics in Software Testing
Managing the Project Lifecycle
Attention CFOs How to tighten your belt and still survive May 18, 2017.
Work Package 11 Name David Giaretta Institution APA/STFC
Introduction of Week 6 Assignment Discussion
Quantifying Quality in DevOps
Supplier Improvement Program Update
Virtual Collaboration Hub
MBML_Efficient Testing Methodology for Machine Learning
Cloud Management Mechanisms
Integrating Outcomes Learning Community Call February 8, 2012
Management and supervision of men convicted of sexual offences
Presentation transcript:

1 © 2011 Infosys Ltd. ERP Testing Challenges– Need for a Stable Test Environment Presented At STEP AUTO 2011 – ERP testing Conference – Dec 8, 2011 by A. Raghunath, Senior Project Manager – Package testing Pinaki Sen Sarma, Project Manager – Package testing

2 Table of Contents Nuances of ERP Testing & related discussion Typically how QA environment is provided Environment transition activity Types of environment issues Environment Issue Impacts Recommended activities for improved environment stability Conclusion

3 Nuances of ERP Testing Integration of multiple modules But are these enough? What are the critical success factors other than skill set? Do we take anything for granted? There may be quite a few contributing factors, but for our discussion, we will focus on THE NEED FOR A STABLE TEST ENVIRONMENT The bigger picture – End to end perspective Niche Skill set

4 Typically how QA environment is provided The instances for QA environment (Stage environment) could be created in multiple ways: Copy of past release environment Copy of production Hardware of the QA environment is almost never at par with the production environment because of the cost factor involved!

5 Environment transition activity Environment related verifications done during transition phases are: i.Pre-flow activity ii.IT Verification iii.Smoke Test iv.Ramp-up

6 Types of environment issues and associated impacts a.Concurrent Program (CP) Issue b.TIBCO Issue c.Data-sync Issue d.Performance Issue e.Unplanned Environment Downtimes Teams IssueQADevelopmentInfraDBAs Concurrent Program IssueYes Yes (Occasionally) TIBCO IssueYes No Performance IssueYes NoYes (Occasionally) Data-sync IssueYes NoYes Environment DowntimeYes

7 Environment Issue Impact (Contd..) Environment issues account for the most number of defects in a majority of the releases we have handled this far. Following is the Pareto analysis of one such release:

8 Environment Issue Impact (Contd..) There can be a wide range of issues which fall under the environment issue category :  CDB & Concurrent Program issues constitute 26% of the environment related defects  Many of the CDB issues were pertaining to replication of data from DB1 -> DB2  Less frequent sub root-causes (like Cross Functional Issue, Invalid Trigger, SABRIX Issue etc ) have been clubbed under Misc category.

9 Environment Issue Impact (Contd..) It’s not just the environment issues per-se that affects testing, but also the frequency of recurrence of the same. While some of them are one-time issues, there are quite a few which recur very frequently, resulting in more effort wastage than originally anticipated:

10 Environment Issue Impact (Contd..) We had captured data for effort loss across 2 consecutive releases and following were our findings: Converting the above effort loss into dollar values shows the significant impact of an unstable environment on the overall cost. Quarterly ReleaseTotal Available HrsActual Impacted Hrs Release 1 – Core Projects Release 1 – Project B Release 1 – Regression Total Release Total % Effort Lost for Release 1 15% Release 2 – Core Projects Release 2 – Project B Release 2 – Regression Total Release Total % Effort Lost for Release 2 19% ReleaseTotal QA Cost Actual Loss (%) Actual Loss (‘000s of $$) Release 1700 K15 %105 K Release 2400 K19 %76 K We need a stable test environment!

11 Recommended activities for improved environment stability Strengthening the environment transition process Data-sync verification during instance copy Dedicated Infra/DBA support to monitor environment issues More hardware support for testing instances Robust resolution mechanism for QA issues (w.r.t environment) Creation of focused teams for environment monitoring Separate performance test environment Looking at new paradigms like Cloud computing / Virtualization as options for creating the test instance

12 Conclusion Initial drivers for cost reduction – Offshoring Looking for additional efficiencies – one key area is a stable QA environment Adequate attention, proactive monitoring and other factors can reduce cost between 15 – 20% Newer Paradigms like Cloud computing / virtualization of QA environment will help in driving additional efficiencies.

THANK YOU! © 2011 Infosys Technologies Ltd. 13