UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
ICRA Panel System Installation Instructions
A True Handcrafted Company
N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis.
Concrete Pre Cast Panel By Peter Spence ID:
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
The Ariel Assembly Instruction By Laser Dollhouse Designs.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SQXF Shell & Yoke Assembly Procedure
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ICARUS Cold Vessels Thermal insulation Project progress report.
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Structural Engineering Design and Drafting
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Installation of the T600 at Fermilab Fermilab, February 15,
First Wall Panel - Overview
Teleconference ACS – FREIA 31th May 2017
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
MQXC Nb-Ti 120mm 120T/m 2m models
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
ProtoDUNE – DSS Installation, Alignment and QA
LBNF CAD models, Drawings and Component list
By: Shawn Berkeybile, Dave Martin, Zach Palamara, John Sopczynski
News about the WA104 Programme
INSTALLATION SEQUENCE
Endcap shielding senarios:
EHN1 Neutrino Installation Plans
Welcome We’re using a new cost system for BAJA SAE for the 2018 season. The main change will be moving away from an MS Excel document to an online system.
Far Detector Activities Late 2017 – Early 2018
MKTG 2016.
Concrete Structures DR. Nabil Dmaidi.
STRUCTURAL TIMBER FRAMING
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
ESS Concrete Pit Lids.
STEEL PLATES.
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
US-HiLumi – Shipping Post Assembly Status
4 shelf shoe rack assembly instructions
Polarized 3He target installation
Simplified Procedure Draft
DS20k Integration Workshop
Presentation transcript:

UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE

WA105 large prototype (6x6x6 in Prevessin) Updates

WA105 large prototype (6x6x6 in Prevessin) Where is the center?

D.Smargianaki 4 WA105 6X6X6 Roof 2 x Wall Floor * m Without The roof : m * m *External dimensions

EHN1 CE ready by 1-July-2016 We expect that the cryostat preparation/installation will take 6-7 months if done sequentially Can we start some pre-assembly in January 2016 ? Can we push the preassembly to the warm and part of the membrane structure? Can we have the roof be treated separately? D.Smargianaki 5 REQUIREMENTS/CONSTRAINTS

WA105 6X6X6 WARM STRUCTURE PRE-ASSEMBLY SEQUENCE D.Smargianaki 6

7 1. Assemble one by one the floor element and the 4 walls, including the stainless steel plate, on the floor 2. As soon as one is finished it get mounted into a structure 3. With this we prove that the assembly can fit geometrically 4. Once the structure is finished, we measure it. In particular the top to find out how geometrically the roof has to be assembled. We also trace the position of the rods, for a later assembly 5. We bring back one by one the pre-assemblies on the floor and then we add GTT panels where possible PRE – ASSEMBLY SEQUENCE

ASSEMBLE ONE BY ONE THE FLOOR ELEMENT AND THE 4 WALLS, INCLUDING THE STAINLESS STEEL PLATE, ON THE FLOOR D.Smargianaki 8 1

9 OUTER STRUCTURE PRE - ASSEMBLIES Floor 4 x Wall & stainless steel plate everywhere 1

AS SOON AS ONE IS FINISHED IT GET MOUNTED INTO A STRUCTURE WITH THIS WE PROVE THAT THE ASSEMBLY CAN FIT GEOMETRICALLY ONCE THE STRUCTURE IS FINISHED, WE MEASURE IT. IN PARTICULAR THE TOP TO FIND OUT HOW GEOMETRICALLY THE TOP HAS TO BE ASSEMBLED D.Smargianaki

D.Smargianaki 11 2

D.Smargianaki 12 2

D.Smargianaki 13 2

D.Smargianaki 14 2

D.Smargianaki

D.Smargianaki 16 WHERE CAN WE DO THIS ? 1)We need 15 x 15 m 2 to do the flat preassemblies, one by one 2)Then we need 15 x 15 m 2 for the 3rd assembly 3)And we need storage place for the components we are taking down later 4)We need a 40 tons crane in each location 5)2 teams of 4 persons each, working on the 2 locations 6)Plus surveyors and QA people

D.Smargianaki 17 Flat pre- assembly 3rd pre- assembly pre- assembly storage

WE BRING BACK ONE BY ONE THE PRE-ASSEMBLIES ON THE FLOOR AND THEN WE ADD GTT PANELS WHERE POSSIBLE D.Smargianaki 18 5

D.Smargianaki 19 OUTER STRUCTURE PRE - ASSEMBLIES Floor 4 x Wall & stainless steel plate everywhere 5

D.Smargianaki 20 ADDING GTT PANELS Rods in place Partial secondary membrane Partial primary membrane 5

D.Smargianaki 21 ASSEMBLY IN THE FINAL POSITION Weld SS plate in the corners Add GTT foam Add secondary membrane Finish the last layer of foam Pose the missing primary membrane Final welding

D.Smargianaki 22 ROOF Prepare it on the floor Drill holes for penetration Weld reinforcement tubes Install it Install missing foam and membrane in the corners Finish welding membrane

D.Smargianaki 23 FINAL ASSEMBLY