LIGO-G010009-00-R AJW/40m, NSF Review, 1/29/011 Caltech 40 meter Prototype Program  Objectives  Accomplishments in the last year »Infrastructure »IFO.

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
Marcus Ng Mentor: Alan Weinstein Co-mentor: Robert Ward
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
E2E school at LLO1  Han2k »Model of the LHO 2k IFO »Designed for lock acquisition study  SimLIGO1 »Model of all LIGO 1 IFOs »Designed for –noise hunting.
Matthew Evans, Ph237 April Application of Simulation to LIGO Interferometers  Who am I? »Matthew Evans, Ph.D. from Caltech on Lock Acquisition 
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO- G05XXXX-00-R 40m meeting, May Experimental update from the 40m team 40m TAC meeting May 13, 2005 O. Miyakawa, Caltech and the 40m collaboration.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
Recent Developments toward Sub-Quantum-Noise-Limited Gravitational-wave Interferometers Nergis Mavalvala Aspen January 2005 LIGO-G R.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
Overview of Research in the Optics Working Group Gregory Harry, on behalf of the OWG Massachusetts Institute of Technology July 25, 2007 LSC Meeting –
G R DC Readout for Advanced LIGO P Fritschel LSC meeting Hannover, 21 August 2003.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
LIGO- G R 40m Progress, LSC meeting, Aug m Laboratory Upgrade Progress Report Osamu Miyakawa, Caltech 40m Technical Advisory Committee.
LIGO-G R Aspen Current Status of the 40m Detuned RSE Prototype Seiji Kawamura 2004 Aspen Winter Conference on Gravitational Waves Gravitational.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Test mass dynamics with optical springs proposed experiments at Gingin Chunnong Zhao (University of Western Australia) Thanks to ACIGA members Stefan Danilishin.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
LIGO- G R 40m Progress, LSC meeting, 3/031 40m Laboratory Upgrade Progress Report Osamu Miyakawa, Caltech 40m Technical Advisory Committee LIGO-G R.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
LIGO-G R AJW/40m, LSC meeting, March Caltech 40 meter Prototype Program  Objectives  Accomplishments in the last year »Infrastructure.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 DC Readout Experiment at the Caltech 40m Laboratory Robert Ward Caltech Amaldi 7 July 14.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
LIGO- G R Sensing and control, SPIE conference, June Sensing and control of the Advanced LIGO optical configuration SPIE conference at.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Conversion of the Glasgow 10m Prototype for Detuned Operation Bryan Barr Institute for Gravitational Research University of Glasgow LSC - AIC August 13.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
LIGO- G R 40m Progress, LSC meeting, 8/021 40m Laboratory Upgrade Progress Report Dennis Ugolini, Caltech 40m Technical Advisory Committee LIGO-G R.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
LIGO- G R 40mAdvLIGO R&D program, 10/8/ Meter Lab program for AdvLIGO R&D Alan Weinstein, Caltech AdvLIGO R&D Technical Review, 10/8/02.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO- G R AJW,report to 40m TAC, Aug 13, Report to 40 Meter TAC  Caltech 40 Meter Prototype »Objectives and scope »Trade-offs and compromises.
Optical Spring Experiments With The Glasgow 10m Prototype Interferometer Matt Edgar.
LIGO- G Z LSC meeting at Baton Rouge, March Caltech 40m Lab Update LSC Meeting Baton Rouge Mar 21, 2007 Robert Ward, Caltech and the 40m.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO-G R DC Detection at the 40m Lab DC Detection Experiment at the 40m Lab Robert Ward for the 40m Lab to the AIC group Livingston LSC meeting.
Advanced LIGO UK 1 LIGO-G K OSEM Development UK Advanced LIGO project Stuart Aston University of Birmingham for the UK Advanced LIGO Team LSC.
LIGO-G Z 3) Current Status & Plan for Japan RSE -- Stabilization and Installation of PRC & Detuning -- LSC Livingston 2002 Kentaro Somiya.
G I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting.
LIGO-G d April 24, 2007 Auxiliary Optics System (AOS) Technical Breakout Presentation NSF Review of Advanced LIGO Project Mike Smith, Phil Willems.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
Auxiliary Optics System (AOS)
Reaching the Advanced LIGO Detector Design Sensitivity
Outline ideas/status K.A. Strain
Update on the Advanced LIGO PSL Program
Design of Stable Power-Recycling Cavities
Homodyne or heterodyne Readout for Advanced LIGO?
Current Status of the 40m Detuned RSE Prototype
Status of LIGO Installation and Commissioning
40m Laboratory Upgrade Progress Report
Advanced LIGO optical configuration investigated in 40meter prototype
Improving LIGO’s stability and sensitivity: commissioning examples
Squeezed Light Techniques for Gravitational Wave Detection
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
Presentation transcript:

LIGO-G R AJW/40m, NSF Review, 1/29/011 Caltech 40 meter Prototype Program  Objectives  Accomplishments in the last year »Infrastructure »IFO planning »modeling  Goals for the coming year: infrastructure and IFO  Schedule through 2004  Personnel and LSC involvement

LIGO-G R AJW/40m, NSF Review, 1/29/012 40m Laboratory Upgrade - Objectives  Primary objective: full engineering prototype of optics control scheme for a dual recycling suspended mass IFO »Table-top IFOs at Caltech, Florida, Australia, Japan (~ complete!) »These lead to decision on control scheme by LSC/AIC (August 2000 LSC) »Then, Glasgow 10m does a “quick” test of the scheme »Then, full LIGO engineering prototype of ISC, CDS at 40m »First look at DR shot noise response (high-f)  Other key elements of LIGO II are prototyped elsewhere: »LASTI, MIT: full-scale prototyping of Adv.LIGO SEI, SUS (low-f) »TNI, Caltech : measure thermal noise in Adv.LIGO test masses (mid-f) »ETF, Stanford: advanced IFO configs (Sagnac), lasers, etc

LIGO-G R AJW/40m, NSF Review, 1/29/013 Need for prototyping  The Advanced LIGO optical configuration and control scheme is extremely complex, with many innovations.  Without a high-fidelity prototype of the system, it would take years to make the transition from Initial -> Advanced LIGO (mistake learned the hard way during Initial LIGO commissioning).  LIGO observatories must remain undisturbed during initial science run, and transition between Initial -> Advanced LIGO must proceed as quickly and efficiently as possible  Full engineering prototype is essential for minimizing downtime between Initial -> Advanced LIGO; prototyping pays for itself.  The Glasgow 10m IFO will test many elements of the optical and control scheme, but will be very limited, and will not reduce the technical risk. Its primary goal is to provide input to the the 40m experiment (K. Strain, LSC AIC chair, Glasgow).

LIGO-G R AJW/40m, NSF Review, 1/29/014 Advanced LIGO technical innovations tested at 40m  a seventh mirror for signal recycling »(length control goes from 4x4 to 5x5 MIMO)  detuned signal cavity (carrier off resonance)  pair of phase-modulated RF sidebands » frequencies made as low and as high as is practically possible »unbalanced: only one sideband in a pair is used » double demodulation to produce error signals  short output mode cleaner » filter out all RF sidebands and higher-order transverse modes  offset-locked arms » controlled amount of arm-filtered carrier light exits dark port of BS  DC readout of the gravitational wave signal Much effort to ensure high fidelity between 40m and Adv.LIGO!

LIGO-G R AJW/40m, NSF Review, 1/29/015 40m Laboratory Upgrade – More Objectives  Expose shot noise curve, dip at tuned frequency  Multiple pendulum suspensions »this may be necessary, to extrapolate experience gained at 40m on control of optics, to LIGO-II »For testing of mult-suspension controllers, mult-suspension mechanical prototypes, interaction with control system »Not full scale. Insufficient head room in chambers. »Won’t replace full-scale LASTI tests.  thermal noise measurements » Mirror Brownian noise will dominate above 100 Hz.  Facility for testing/staging small LIGO innovations  Hands-on training of new IFO physicists!  Public tours (SURF/REU students, DNC media, princes, etc)

LIGO-G R AJW/40m, NSF Review, 1/29/016 Accomplishments in last year: Infrastructure  Dismantling of old IFO, distribution of surplus equipment to LIGO and LSC colleagues  Major building rehab: »IFO hall enlarged for optics tables and electronics racks »roof repaired, leaks sealed »new electrical feeds and conditioners, 12" cable trays, etc »new control room and physicist work/lab space »New entrance room/changing area »rehab of cranes, safety equipment, etc  Active seismic isolation system (STACIS) procured, installed, and commissioned on all four test mass chambers

LIGO-G R AJW/40m, NSF Review, 1/29/017 STACIS Active seismic isolation  One set of 3 for each of 4 test chambers  6-dof stiff PZT stack  Active bandwidth of Hz,  20-30dB of isolation  passive isolation above 15 Hz.

LIGO-G R AJW/40m, NSF Review, 1/29/018 Accomplishments in last year: Infrastructure, continued  New vacuum control system and vacuum equipment  New output optic chamber, seismic stack fabricated  Vacuum envelope for 12 m input mode cleaner fabricated  Electronics racks, crates, computers, network… procured All the above will be installed and commissioned in the coming months!

LIGO-G R AJW/40m, NSF Review, 1/29/019 Accomplishments in last year: IFO planning  Initial-LIGO-like PSL being assembled; installation begins in February  New 12 meter input mode cleaner design finalized; vacuum envelope assembly beginning in February  Detailed optical layout in advanced stages »all in-vacuum components laid out »optical levers for all suspended masses »baffling, scattered light suppression, shutters, etc »Nine output beams routed to optical tables near electronics racks »input mode cleaner, output mode cleaner, mode-matching telescopes laid out »integrated with building, electrical, CDS layout  Suspended optic glass blanks on order  Initial-LIGO SOS suspensions for MC, BS, RM, SM under construction  Scaled SOS suspensions for ITMs, ETMs under design  Detailed WBS for construction  Detailed WBS for experiment is in progress

LIGO-G R AJW/40m, NSF Review, 1/29/0110 Optical Layout  All suspended optics have OpLevs  Almost all of 9 output beams come out in this area  12m input mode cleaner  short monolithic output MC  baffling, shutters, scattered light control  integrated with building, electrical, CDS layout

LIGO-G R AJW/40m, NSF Review, 1/29/0111 Accomplishments in last year: Modeling  Specification of all optical parameters »Cavity lengths, RF sideband frequencies and resonance conditions »mirror trans., dimensions, ROC, optical quality, tolerances…  Detailed length-control model scheme using Twiddle » Adv.LIGO and 40m following parallel paths  Alignment sensing & control modeled using ModalModel (SURF student; requires updating)  Suspensions for 5" test masses modeled using Simulink (SURF student)  Noise in GW channel modeled in Matlab  Model of IFO DC response with imperfect optics in progress using FFT program (CSUDH group)  Model of lock acquisition dynamics using E2E in progress

LIGO-G R AJW/40m, NSF Review, 1/29/0112 PSL MMT MC MMT ITM BS ETM ITM ETM RM RF Vacuum  e  e e e  e e  e5 Length Beam Amplitude Radius Beam Radius of Curvature (units in mm) Optics Parameters (flat ITMs) Lisa M. Goggin, LIGO 40m lab, August 2000

LIGO-G R AJW/40m, NSF Review, 1/29/0113 Length sensing signals from Twiddle Much more diagonal than LIGO I! These numbers vary as one varies arm length, unmatched arms, imperfections, losses, etc. l+ and l- signals are not very robust, but neither are they at LIGO I. PO signal must be multiplied by PO power reflectance (600 ppm nominal); is the signal big enough to be significantly above PD noise? Can make it bigger, with some sacrifice in GW shot noise response; maybe that's appropriate here. Ditto, for modulation depth. Double demodulation is difficult; hard to determine demod phases. Thanks to Jim Mason for all his help!

LIGO-G R AJW/40m, NSF Review, 1/29/0114 LIGO II and 40m noise curves LIGO II 40m

LIGO-G R AJW/40m, NSF Review, 1/29/0115 Goals for the coming year  Infrastructure: »Return to clean-room conditions after building rehab »Install output optic chamber and seismic isolation stack »Install input mode cleaner vacuum envelope »Fully commission vacuum control system and all new hardware »Install new optical tables and associated hardware »Fully commission computing and networking infrastructure »Assemble PEM system and DAQS, begin regular monitoring  IFO: »Install and commission PSL »Begin installation and commissioning of 12m input mode cleaner »Search out environmental noise sources

LIGO-G R AJW/40m, NSF Review, 1/29/0116 Milestones through 2004  4Q 2001: Infrastructure complete »PSL, 12m MC, vacuum controls, DAQS, PEM  4Q 2002: »Core optics and suspensions ready. Suspension controllers. Some ISC. »Glasgow 10m experiment informs 40m program »Control system finalized  2Q 2003: »auxiliary optics, IFO sensing and control systems assembled  3Q 2003: Core subsystems commissioned, begin experiments »Lock acquisition with all 5 length dof's, 2x6 angular dof's »measure transfer functions, noise »Inform CDS of required modifications  3Q 2004: Next round of experiments. » DC readout. Multiple pendulum suspensions? »Final report to LIGO Lab.

LIGO-G R AJW/40m, NSF Review, 1/29/ m Lab Staff  Alan Weinstein, project leader  Dennis Ugolini, postdoc  Steve Vass, Master tech and lab manager  Ben Abbott, technician  Advanced LIGO engineers: Rick Karwoski, Jay Heefner, Garilynn Billingsley, Janeen Romie, Mike Smith, Fred Asiri, Dennis Coyne, Tom Frey, Peter King, etc.  Guillaume Michel, visiting grad student (winter/spring 2001)  Summer 2000: five SURF undergraduates

LIGO-G R AJW/40m, NSF Review, 1/29/0118 LSC involvement  At March 2001 LSC meeting, we will issue a CALL FOR INTEREST in forming an Advanced LIGO Optical Control Configuration experimental group focused on the prototyping activities at the 40m.  There will be many meaty tasks ripe for LSC involvement.  A draft Conceptual Design Document will be available for review by that time.  We expect that the Optical Control Configuration will evolve and maybe depart from the scheme outlined at the August 2000 LSC meeting; we must remain flexible for as long as possible to ensure high fidelity between the 40m prototype and what will be realized in Advanced LIGO!