Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
Advertisements

GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Solar Probe Plus FIELDS Quarterly Management Nov 15, 2012.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
GoetzFIELDS iCDR – I&T Solar Probe Plus – FIELDS Integration and Testing Instrument CDR Keith Goetz University of Minnesota 1.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Risk Management 1. Risks and Risk Management Risks are potential events that have negative impacts on safety or project technical performance, cost or.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
BonnellSPF AEB CDR PEER REVIEW – RESPONSES Solar Probe Plus FIELDS Antenna Electronics Board AEB I-CDR Peer Review Responses (rev A, 13 Jan 2015) J. Bonnell.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
1 NG9-1-1 Initiative Action Team Conference Call #5 October 3,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
Solar Probe Plus FIELDS Quarterly Management DCB_RFS-ADC July 18, 2013.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus FIELDS Instrument Suite Date Likelihood of Occurrence (probability) Consequence of Occurrence.
SPP Fluxgate MAG input to FIELDS Quarterly Review – 7/18/2013 Bob MacDowall, Ron Oliversen, Dave Sheppard, Scott Murphy, Jim Odom, Jack Connerney.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
Solar Probe Plus FIELDS MAG Peter Harvey. MAG FSW Requirements.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
Solar Probe Plus FIELDS Quarterly Management June 18, /18/2014FIELDS Quarterly Management1.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Solar Probe Plus FIELDS Glaser – ME Slides for Quarterly July 18, 2013.
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Program Management Agenda
SPP/FIELDS Quarterly UMN 27 September 2016
Solar Probe Plus – FIELDS SCM FM2 Instrument Pre-Ship Review
Solar Probe Plus FIELDS Pre-AGU Science Meeting
Solar Probe Plus – FIELDS V1234 PA/Antenna Instrument Pre-Ship Review
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Solar Probe Plus – FIELDS Main Electronics Package
Solar Probe Plus FIELDS
Keith Goetz University of Minnesota
Solar Probe Plus FIELDS
Solar Probe Plus – FIELDS Main Electronics Package
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Solar Probe Plus – FIELDS V1234 PA/Antenna
FIELDS Keith Goetz Solar Probe Plus A NASA Mission to Touch the Sun
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
Introduction and Overview
Presentation transcript:

Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014

Agenda 1. Electrical Status (All) DCB-RFS, FSW Daughterboard AEB, PREAMP TDS-LNPS, FSW DFB MAG SCM 2. Mechanical/Thermal - Bill D., David G., Paul Turin, Millan D. a. MEP b. Antennas c. Thermal 3. Systems (Goetz) Power Is Tight on Spacecraft Harness Drawings ICD Changes 4. Assurance - Fischer/Le a. Parts Ordering Documentation b. Radiation Meetings w/APL 5. Management (Harvey) a. iPDR Action Item Status - All Complete! b. Changes in the weekly report, issues c. Adding monthly liens & threats d. Quarterly Estimate At Completion e. Risks to iCDR schedule f. I&T Schedule g. Peer Review Coordination 6. Deliverables to APL MOC Products review - Delivered 8/1/14 MICDs - delayed due to CAD issues

Action Items All Have Been Completed !

PHASE C/D MILESTONES

ETU I&T SCHEDULE Arrival Estimates Continue to Slip Some Reductions in Work Seen (negative values) Without Reductions, Slip is Roughly 10 days / 30-day month Processors Coming in Late, Yet Needed to Start I&T

ETU I&T SCHEDULE June Schedule – PROTO-RTAX logistics not supportable August Schedule – After 2 months, 1.5 months delayed.

ETU I&T SCHEDULE August Revised Schedule DCB EM1 to be used to start I&T DCB EM2 to be swapped in at end of FIELDS1 I&T After successful CPT, PROTO RTAX are burned, assembled and tested. Peer reviews during November ICDR Slides needed early December Environments in December ICDR (Jan 14).

ETU I&T SCHEDULE