Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
South Boston Energy Project South Boston, VA
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
OVERVIEW OF THE MINNESOTA PUBLIC UTILITIES COMMISSION Presentation to the Itasca Economic Development Corp. February 14, 2007 By LeRoy Koppendrayer, Chair.
Topics to Cover Interconnection Process Overview
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
1 Environmental Tracking System Fees Regulatory Affairs Standing Committee September 11, 2003 Market Evolution Program Update.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
The Role of the Project Proponent in the NEPA Process PUBLIC LANDS ADVOCACY NEPA & PERMITTING SEMINAR Zeke Williams June 11, 2008.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Portfolio Committee Presentation Government printing Works Audit and Compliance 07 May 2013 Presented by: Chief Executive Officer.
Water Supply Planning Initiative State Water Commission November 22, 2004.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Network Customer Meeting Access Metric Update November 16, 2006.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
1 Market Evolution Program Regulatory Affairs Standing Committee Meeting September 11, 2003.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
OSC Meeting April 27, Transmission Cost Allocation Overview.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Toronto Calgary Moscow Almaty Atyrau Caracas Rio de Janeiro 1 MD Overview : This slide runs a self- contained mini- presentation listing the firm’s services.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
THE ECONOMIC FEASIBILITY OF POWER PLANT RETIREMENTS ON THE ENTERGY SYSTEM Presented to the LOUISIANA PUBLIC SERVICE COMMISSION November 9, 2005 Open Session.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 Market Operations Standing Committee Meeting April 23, 2003 Market Evolution Program.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
1.
An Overview of: Generation Connections: Transmission Connection Cost Responsibility Review July
Review of PUC Discussion on Nodal Market Adoption Technical Advisory Committee September 7, 2005.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
15 Jul 2003Market Operations Standing Committee of the IMO1 Treatment of Combined Cycle Generation and Related Aggregation Issues (MR-00121) John MacKenzie.
Proposed Revisions to Connection Assessment and Approval Process Market Manual 2.10 Bob Gibbons Manager - Long Term Forecasts and Assessments.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Transmission: the Critical Link
Massachusetts Electric Restructuring Roundtable
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Integration of Variable Generation Task Force (IVGTF): Status
Incentives for electricity infrastructure – ERGEG view
Special Protection Systems: Operational and Compensation Issues
Presentation transcript:

Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003

2 Purpose Today Overview of the GTA & Toronto Areas Supply Adequacy Issues Need for Regulatory Planning Regulatory Issues To Be Addressed

3 GTA & Toronto Area Supply: Adequacy Issues IMO’s last March’s 10-year Outlook identified the inadequacy of supply to Toronto as a significant concern. Concern has been triggered by the assumed shutdown of Lakeview generation by It also recognized that load growth in outlying parts of the GTA had created excessive loadings on transmission facilities. The IMO has requested market participants to submit their solutions. Generation and transmission solutions have been proposed.

4 GTA & Toronto Area Supply: Need for Regulatory Planning Short time-frame Complex, interrelated issues Can benefit from a comprehensive approach

5 GTA & Toronto Area Supply: Regulatory Issues Planning process Source of Funding Cost and Rate Recovery OEB Proceedings and Approvals Environmental Permits and Approvals

6 Appendix: Elements of the Ontario planning process for transmission adequacy Annual assessment process (10-year Outlook) –IMO assesses resource adequacy and identifies market participant plans and forecast system constraints –IMO solicits voluntary responses to constraints (all resource types, including merchant and regulated transmission) –IMO assesses whether it must intervene to augment voluntary market responses to address constraints

7 Appendix: Elements of the Ontario planning process for transmission adequacy If urgency warrants IMO intervention: –IMO issues RFP to all potential resources (Generation, Demand, Transmission) –Responses (if any) are assessed by IMO for technical feasibility, and submitted to OEB review and approval Assessment includes associated system (grid) upgrades Currently there is no provision for the IMO to optimize among solutions, conduct cost-benefit analysis and select a preferred alternative –If no responses to RFP, IMO issues DFP to the local Transmitter (who must submit a proposed solution) –IMO assesses the DFP response, and project proceeds to OEB review for approval Environmental approvals may be required

8 Appendix: Elements of the Ontario planning process for transmission adequacy Market participants may at any time file “spontaneous” applications for new resources –Independent of the IMO’s annual assessment process –Includes Generators, Demand Resources, Transmitters (merchant and regulated) –IMO assesses via CAA (Connection Assessment and Approval) process includes Preliminary Assessment and System Impact Assessment –IMO recommendation forwarded to OEB for approval (Leave to Construct) Note: Currently, the IMO can identify and solicit solutions for congestion constraints, but cannot intervene to force a solution