W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
CSC EMU Muon Port Card (MPC)
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Global Trigger and Global Muon Trigger
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back Bar Code Front Regional Cal. Trigger Complete - U. Wisconsin Receiver Card: Electron Isolation & Clock: Jet/Summary: Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC 158/164 tested (126) 154/154 Tested (126) 23/25 tested (18) 23/25 tested (18) (27/28 Custom Backpl Tested) (18) fraction tested (needed) EISO Clock Front Back Five full crates at CERNRest waiting at Wisconsin

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 2 Endcap Muon Trigger Milestone: Production & Testing Complete Mezzanine card TLK2501 serializers OptomodulesGTLP Receivers VME Interface (glue logic) Muon Port Card (Rice): Final production done (tested 67) Total needed: 60 (75 incl. spares) Sector Processor (Florida): Backplane produced (1 needed) 20 SP produced (12 needed): Muon Sorter (Rice): Sorter produced (1 needed)

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 3 Operate fully functional trigger electronics at CERN Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for all electronics subsystems Test interfaces & integration as much as possible before move to USC55 MTCC in SX5 Test multiple trigger components with multiple detector components during the magnet test. Verify trigger functions & interfaces w/detectors on surface Installation in Underground Counting Room (USC55) Started Mid-July ‘06 -- “ready for crates” Racks & Infrastructure installed, cooling operational RCT crates, power, infrastructure fully installed Passed CERN Safety Review Card installation next Underground Counting Room Trigger Commissioning USC55

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 4 Regional Calorimeter Trigger Crates, Fans, Power Supplies, Monitoring, Controls and other infrastructure installed, validated and passed safety check in July Ready for card installation

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger RCT Full Crates Operating at CERN - U. Wisconsin Rear of Full RCT crate fully cabled to HCAL trigger primitive logic Front of Full RCT crate with Jet Capture Card that continuously samples output, checks on the fly for errors and provides readout of 256 crossings Used for integration tests & board checkout after shipment

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 6 ECAL/HCAL/RCT Integration Tests HCAL HTR to RCT Used JCC to verify data 6 cables used - all in sync Latency measurements w/PMT as source of HCAL TPG ECAL TCC to RCT Valid link established Channel number sent as data 2 channels on 20 m cables sent in sync to RCT HCAL HTR & ECAL TCC to RCT 28 cables to RCT from 9 TCC & 18 HCAL HTR outputs Common clocking: LTC, TTCci 28 channels in sync - links stable for >10 hours error free running “Hydra” link cable checked as an option for two SLB’s to one RCT RMC ECAL - HCAL Pattern tests RCT can “lookup” incoming data LUTs can be programmed to duplicate incoming data Have ORCA emulation to help predict outputs HCAL HTR ECAL TCC RCT

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 7 RCT Integration Tests RCT to Local Timing Controller (for MTCC) Tests Receive 56 HCAL links (448 towers) in Green Barracks Send trigger out with RCT Jet Capture Card OR of towers in each half using Quality Bit Validated connection with LTC/GT GT ANDs top & bottom - reduces rate RCT Jet Capture Card to GT Tests Backup Global Calorimeter Trigger JCC in spare VME slot of RCT Crate Currently sends up to 4 trigger bits Threshold  E T, e/  candidate, MIP Tests using RCT pattern successful! ECAL TCC patterns yield JCC output Synchronized to Bunch crossing 0 RCT- GCT Source Card First test with new GCT Completed successfully in July

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 8 CSC Muon Trigger Status (Florida, Rice, UCLA) Peripheral Crate installation underway on disks: Full Track Finder System test complete: DT-CSC Interface Tested:

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 9 CSC trigger operations Operating in MTCC Currently set-up in SX5 as operated in 2004 beam tests Connected 10 chambers in ME+2 & ME+3  20 ° full slice on YE+2 CSC Track-Finder provides a cosmic muon trigger based on a coincidence of LCTs in two or more disks Currently 50Hz with 2-station coincidence CSC track finder has already provided triggers used to pass data from the CSCs to the global DAQ. SP

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 10 Electronics Integration Center (Building 904) User Labs LV Tests System Tests Trigger Tests Assemble one each of critical racks in central trigger core in underground counting room Readout & trigger electronics testing labs See Next Slide

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 11 HCAL ECAL RCT GCT GT/ GMT TTC DTTF CSCTF Trigger Integration Progress in Electronics Integration Center (Pr. 904) Large scale successful integration tests in central racks using common TTC infra- structure involving trigger primitives, regional & global processing: Calorimeter Trigger Muon Trigger Global Trigger

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 12 TriDAS Commissioning in EIC A vital part of the trigger program: EIC (Bat. 904) is the only opportunity to test a large number of channels with close to final infrastructure before moving into USC55. Tests done in EIC are mostly a continuation of previous integration tests done in institute labs, but performed in an environment as close to USC55 as possible: rehearsal for USC55 activities Method: Download and synchronously propagate test patterns within and between trigger systems Use simulated data & data from test beams Goals: Test interfaces, software, synchronization, DCS… Prepare electronics for use in Cosmic Challenge Gain back some time lost in the delay of USC55 by testing everything possible before installation Completion of Electrical Clearance tests

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 13 CSC Track Finder Integration - Florida, Rice, UCLA Slice Test: cosmics running now! preparing full readout and self triggering of a whole trigger sector (60 o ). Since April 05 self-triggering with as close to nominal CMS setup as possible used to pass data CSCs to global DAQ. Goal: magnet test with 1/12th of the fully functioning CSC detector system EIC Integration Integration tests with Drift Tube Track Finder CSC TF crate running in EIC

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 14 CSC Trigger in MTCC, 904 TF Crate NIM logic FED Crate EMU TTC Crate MPC patch panel TF Crate peripheral Crate Green Barracks: TTC Crate Electronics Integration Center: MTCC trigger is up & running!

W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 15 CSC, RCT in MTCC: recent news CSC: CSC triggers have been successfully synchronized with the drift tube triggers and provided triggers for HCAL. RCT: Crate Fully Operational in Green Barracks at Point 5 Cable connections made to HCAL Full modules above and below connected Allows for top-bottom coincidence Here put picture of RCT crate in GB