Principal funding: Bonneville Power Administration, NOAA-Fisheries Principal Investigator: Dr. Chris Jordan, NOAA-Fisheries Actual work on the project.

Slides:



Advertisements
Similar presentations
Collaborative, Systemwide Monitoring and Evaluation Program
Advertisements

Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Monitoring Watershed Restoration Effectiveness Nez Perce Tribe DFRM-Watershed Division Rebecca A. Lloyd, Project Leader.
Salmonid Natural Production Monitoring & Evaluation Project Confederated Tribes of the Umatilla Indian Reservation BPA Project #
Interior Columbia Basin TRT Draft Viability Criteria June, 2005 ESU & Population Levels.
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
Funding Monitoring in 2006 – the Programs role in a West Coast Partnership November 16, 2005.
Ecosystem Diagnosis and Treatment in the Columbia Cascade Province Project Goal: The Columbia Cascade Province will have an implementation strategy that.
A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
UW Offsite Habitat and Fish Survival Effectiveness Monitoring Objective: Assist in developing and applying central guidance and criteria for improving.
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) and StreamNet NW Power & Conservation Council, Sept. 20, 2006.
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Lower Snake River Compensation Plan Hatchery Evaluations – Salmon River Project No Nez Perce Tribe Department of Fisheries Resources Management.
Assessment of Bull Trout Populations in the Yakima River Watershed.
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
WRIA 8 Fish in/Fish out Monitoring Summary
Frank Leonetti, Snohomish County
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Monitoring of Great Basin Redband Trout 6 Year Pilot Study ODFW Native Fish Investigations Project.
Summary of Recommendations: Peer Review of FY 13 Science Workplan Trinity River Restoration Program Preliminary Fiscal Year 2013 Science Workplan.
Yakama Nation Pacific Lamprey Recovery Project Core Data And Monitoring Framework.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
TRIBAL DATA NETWORK COLUMBIA RIVER INTER-TRIBAL FISH COMMISSION.
Coho Reintroduction in the Upper Columbia: Using Adaptive Management to Achieve Success Fisheries Resource Management Yakama Nation.
Modelling salmon and habitat. What is a model A simplified abstraction of a more complex object A model airplane - has some of the characteristics - Boeing.
Missing collaborator. Conceptual Overview SHIRAZ Landscape Processes Land Use Freshwater Habitat Biological Response Land use & landscape processes affect.
Scientific motivation of the CHaMP project: How CHaMP data can be used to answer fish and habitat management questions Chris Jordan – NOAA-Fisheries Brice.
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
Integrated Status & Trend (ISTM) Project: An overview of establishing, evaluating and modifying monitoring priorities for LCR Steelhead Jeff Rodgers (ODFW)
Proposed Approach for Developing Columbia Basin Salmon and Steelhead Goals June 3, 2015.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Hancock Springs A natural lab for studying the roles of physical habitat, nutrient availability, and non-native species to inform river restoration John.
1 Habitat Action Effectiveness Program for the FCRPS BiOp.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
The Non-tidal Water Quality Monitoring Network: past, present and future opportunities Katie Foreman Water Quality Analyst, UMCES-CBPO MASC Non-tidal Water.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
PNAMP Habitat Status and Trends Monitoring Management Question: Are the Primary Habitat Factors Limiting the Status of the Salmon and Steelhead Populations.
Habitat Status and Trend in the Upper Columbia ESU Chapter 3 John Arterburn.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
State of the Forest: Data harmonization and management Helping us to know whether we are getting the job done.
UNIT 8: Fisheries assessments. 2 Fisheries data Why do we need fisheries data? FAO (2005): “Information is critical to EAF. It underpins the formulation.
Monitoring Challenges for VSP Parameters in the Oregon Portion of the Lower Columbia River Jamie Anthony Monitoring Coordinator.
Evaluating Fish Response to Habitat Restoration Overview of Intensively Monitored Watershed Research in the PNW Rationale for IMW approach Extent of current.
Estimating Steelhead Redd Abundance and Variance in the Wenatchee River Basin Andrew Murdoch WDFW Chad Herring WDFW Kevin See QCI Chris Jordan NOAA.
The concept of a Master Sample: Lower Columbia Example An Update Phil Larsen Pacific States Marine Fisheries Commission c/o USEPA 200 SW 35 th St. Corvallis,
Status & Trend Monitoring Data End User Management Questions, Directives, Research & Monitoring Plans and Other Strategies 1.Federal Columbia River Estuary,
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Establishing a Network of Intensively Monitored Watersheds in the Pacific Northwest PNAMP Effectiveness Monitoring Workgroup April 7, 2005.
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
Columbia River Basin Monitoring, Evaluation, Research, and Reporting (MERR) Plan DRAFT Nancy Leonard Fish, Wildlife, Ecosystem Monitoring and Evaluation.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
A Data Management Approach to Support Aquatic Resources Monitoring.
What do we have in common? Do more with less! PNAMP Integrated Status & Trend Monitoring Workgroup.
November 3-5, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Upper Columbia Sub-Region 2 Listed ESU/DPS Steelhead-
ISEMP Data Management System. Support entire workflow Based on required functions Based on understanding of the data ISEMP Data Management System.
Iowa Rivers Information System Inventory, Modeling, and Evaluation of Basin, In-Stream Habitat, and Fishery Resource Relationships Kevin Kane, Iowa State.
Chad Herring WDFW Andrew Murdoch WDFW. Wenatchee Basin Steelhead Spawning Distribution.
RTT Analysis Workshop Synthesis: Data Gaps and Research Needs (Chapter 5) Presented by Keely Murdoch MaDMC Chair Yakama Nation.
Coordinated Assessments Project Overview & Next steps January 17, 2012 Presented to: Independent Science Review Panel Tom Iverson, CBFWA.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
Comparative Survival Study Annual Meeting
BPA Expectations for Regionally Coordinated RM&E Programs Jim Geiselman – BPA BPA Expectations on the Development of Standard.
Yakima River Steelhead Status and Trends RM&E Project Overview:
Missing collaborator.
Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop
Presentation transcript:

Principal funding: Bonneville Power Administration, NOAA-Fisheries Principal Investigator: Dr. Chris Jordan, NOAA-Fisheries Actual work on the project done by ~100 collaborators Brief Overview of ISEMP

Why this project exists: Current monitoring programs throughout the Columbia basin were not developed under a cohesive design Data from current monitoring programs in Columbia River Basin of unknown adequacy for ESA assessments & recovery planning Data collection not based on statistical samples, lacks standardized sampling, protocols, and data management strategy

How this project is addressing these issues: Creating a framework within which monitoring plans can be developed under a cohesive design Design monitoring programs to meet policy needs Identifying information gaps, developing standardized protocols to assess status of anadromous salmonids & their tributary habitat, creating data management strategy

This project’s true goals: Mission –BPA’s research and development test-bed for the generation of tools, guidance and best management practices for efficient status and effectiveness monitoring of salmonid populations and habitat status and restoration in the interior Columbia River basin. Operating principals –Design data management to support the full life-cycle of data, from generation to analysis. –Foster the cultural change required to improve data collection, management and analysis practices. –Develop answers come from quantitative assessments of data and on-the-ground examples, not opinions.

What ISEMP is actually doing for the F&WP Designing and implementing status and trends monitoring and data analysis that – can answer management questions – is cost effective – integrates existing programs to the maximum extent Designing effectiveness monitoring for tributary habitat restoration at the population scale that – can assess actions efficacy – serve as a general model for project selection, implementation, and evaluation Data management that – makes data available, now and into the future – maximizes the information content of existing data – maximizes the potential to share/compile information across the F&WP

Delivering RME guidance that integrates across scales and programs Delivering assessments of protocols and indicators for information content (relative to ESA fish population processes) Delivering sampling design assessment for robustness, efficiency, practicality Demonstrating and expand the community of practitioners’ willingness to try something different Delivering tools (data management and analysis) for general distribution and use What ISEMP is actually doing for the F&WP

Status and Trend Effectiveness/IMW 3 Approaches Traditional Experimental Modeling 3 Subbasins Wenatchee/Entiat John Day Salmon

Why three pilot basins? Why such different approaches? – Geographic differences may dictate indicators – Institutional differences Existing RME Existing infrastructure/local management support Each pilot basin offers a unique set of opportunities and pathways – Data driven design (Wenatchee/Entiat) – Model driven design (Salmon River) – Mechanism driven design (John Day River) But end result will be single monitoring design guidance

Wenatchee River Basin Pilot Project 50 GRTS sites for physical and biological stream reach habitat metrics and fish density stratified by stream order and gradient 60 headwater streams samples quarterly for organic matter input to fish bearing streams stratified by ecoregion and land use 25 miles of spawning ground index surveys done weekly 25 GRTS sites for spawning surveys outside of index areas samples monthly 5 smolt traps running “continuously” 5 water quality monitors w/ 5 sensors logging hourly, plus monthly water grabs for chemistry Smolt trap and water quality sites

Intensively Monitored Watersheds are a good idea: biology of fish-habitat relationships is complex Can best be understood by concentrating monitoring and research efforts at a few locations Enables enough data on physical and biological attributes of a system to be collected Develop a comprehensive understanding of the factors affecting salmon production in freshwater

What will it really take to do watershed- scale restoration (with monitoring)? Are projects actually implemented to address watershed- scale response? Who is coordinating the implementation of actions at the scale of watersheds? – At smaller scales it is ok to separate effectiveness monitoring from action implementation – There can be no separation between monitoring and actions at watershed scale – Watershed scale restoration actions must be run by the monitoring program

Lemhi River Effectiveness Monitoring Pilot Lemhi HCP Hydrograph normalization Tributary reconnection Need to monitoring overall program for “effectiveness”

Habitat QuantityHabitat Quality Channel Characteristics by Land Use Type: A Relating habitat availability to capacity, (c i ) 13 and 14; B Calibration using empirical and GIS data, ; C Hypothesis testing, 29 and 30 (cross- sectional), (pre/post). Survival/Productivity by Life History Stage: A Relating habitat quality to survival/productivity, (p i ) 15 and 16; B Calibration using empirical estimates of survival/productivity, 24-28; C Hypothesis testing, 31 and 32 (cross- sectional), (pre/post). Fry 1-3, (N 3,t+1 ) Parr 1-3, (N 4,t+1 ) Presmolt 1-3, (N 5,t+1 ) Smolt 1-3, (N 6,t+2 ) Egg 1-3, (N 2,t ) Ocean Immature Adult 8-10, (o t+x ) 1-3, (N 6,t+1 ) Spawner 1-3, (N 1,t ) Mature (Yes) 8-10, (o t+x ) Harvest (T) 11, (o t+x ) Survival (5-7), (O t+x ) Mature (No) Lemhi River Basin Pilot Project Habitat restoration effectiveness model

Lower 25 rm is simplified, straightened, plane- bedded channel On-going, proposed and potential in-stream restoration projects 60 treatment sites 10 pre-existing treatment sites 25 untreated control sites Snorkel, habitat surveys, other on-going monitoring to evaluate overall program effect on salmonid productivity Entiat River Effectiveness Monitoring Pilot

Bridge Ck (JDB) Effectiveness Monitoring Pilot

Data management – our meta data model

Rationale for project Developing tools to integrate existing projects into a programmatic approach to monitoring and evaluation. Developing tools to integrate data and information from existing projects into basin-wide data sets Good investment strategy for F&WP increase the value of existing projects, increase the efficiency of current work, generate standards for assessment and evaluation of projects and project proposals.