P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
(T-488) FONT: C Clarke, C Swinson, P Burrows, T Hartin, G Christian, H Dabiri Khah SLAC: Mike Woods, Ray Arnold, Steve Smith et al.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Dec 2004 Simulation of Low Energy backgrounds in the ILC IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White,
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Preliminary Design of FONT4 Digital ILC Feedback System Hamid Dabiri khah Queen Mary, University of London 30/05/2005.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Dec 2004 Low Energy backgrounds in the TESLA IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White, S Molloy.
Dec 2004 Simulation of Low Energy backgrounds in the TESLA IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White,
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Simulation of feedback BPM signals in an intense background environment A Hartin, P Burrows, G Christian, C Clarke, B Constance, H Khah, C Perry, C Swinson.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
(T-488) FONT: C Clarke, C Swinson, P Burrows, T Hartin, G Christian, H Dabiri Khah SLAC: Mike Woods, Ray Arnold, Steve Smith et al.
Dither Luminosity feedback versus Fast IP feedback
BDIR/MDI Summary ECFA Final Plenary
In collaboration with P. N. Burrows, A. Latina and D. Schulte
BDIR/MDI Summary ECFA Final Plenary
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
FONT stripline BPM resolution
(T-488) FONT: C Clarke, C Swinson, P Burrows, T Hartin, G Christian, H Dabiri Khah SLAC: Mike Woods, Ray Arnold, Steve Smith et al.
Presentation transcript:

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background tests at SLAC/ESA (T-488) Status of IP Fast Feedback Prototype

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT: Feedback On Nanosecond Timescales Oxford + Daresbury: Philip Burrows Glenn Christian Hamid Dabiri Khah Tony Hartin Alexander Kalinin Colin Perry Vice Glen White Graduate students: Christine Clarke Christina Swinson Ben Constance SLAC, KEK, DESY, CERN

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 IP Intra-train Feedback Concept e- e+ Vibrations/noise cause beams to miss one another Measure beam position Kick beam back into collision Feedback circuit Outgoing beams deflected ‘Intra-train’ FB

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 warm smaller detector larger detector smaller L* larger L* common cryostat QD0 QF1 vacuum connection & feedback kicker Seryi

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 ILC digital feedback prototype (FONT4) KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e-

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT4: latency budget Time of flight kicker – BPM: 7ns Signal return time BPM – kicker: 15ns Irreducible latency: 22ns BPM processor: 7ns ADC/DAC ( MHz cycles) 40ns Signal processing (8 357 MHz cycles) 25ns FPGA i/o3ns Amplifier 40ns Kicker fill time3ns Electronics latency: 118ns Total latency budget: 140ns

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT4 hardware KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- In fabrication by TMD

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT beamline at KEK ATF (1.3 GeV 3-bunch train w. spacing c.150ns) BPM processor board Amplifier/FB board FEATHER kicker

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT4 initial beam tests (June 2006) KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- 154ns

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 June 2006: 1 st test of PCB version of analogue BPM processor 2 nd tests of digital FB: timing, synchronisation, triggering, gain adjustment in FPGA (ADC 714/10 = 71 MHz) November 2006: 3 rd tests of digital FB: ADC 357/4 = 90 MHz 2 nd tests of (modified) PCB BPM processor January – March 2007: 1 st test of FONT4 amplifier Closed-loop FB : Develop into ‘turnkey’ system : Deploy x, x’, y, y’ system at ATF2 FONT4 test plan

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Oxford test bench setup

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Oxford test bench setup

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 ILC interaction region Engineering details TBD!

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Nominal IP feedback hardware locations Engineering details TBD!

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Nominal IP feedback hardware locations Engineering details TBD!

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Pair-induced EM backgrounds BPM e+e- pairs Low Z mask

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Pair-induced EM backgrounds BPM e+e- pairs Low Z mask

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT Test Module for ESA low Z mask beamcal BPM QFEX1 Material model of ILC outgoing beamline

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 FONT Test Module (T-488) Installation at ESA Beam

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Beam scan across module (12 Jul 06) Noticeable degradation of signals 10**7 beam Modelling in progress

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Modelling of ESA data Primary beam simulation and transport (MAD) Generate showering in module (GEANT3); track shower particles to BPM Simulate response of BPM to noise hits Beam scan across module

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Modelling of noise on BPM strips

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Simple time-of-flight analysis Primary beam signal Example of noise (for illustration only) Time (ns)

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Simulated signal + noise results (work in progress)

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Example showing beam scan vs. data data at x=1.75

P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Details seem to matter Study of copper vs steel striplines (5000 input electrons) Watch this space for further developments… Particle Studio code being used for better signal modelling