Alan Watson ATLAS Overview week, Prague, 17/09/2003 Rx   Calorimeters (LAr, Tile) 0.2x0.2 0.1x0.1 400 Mb/s analogue ~75m 0.1x0.1 RoI Builder L1 CTP.

Slides:



Advertisements
Similar presentations
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
Advertisements

1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
8 th Workshop on Electronics for LHC experiments - Colmar- September 9 th -13 th 2002Gilles MAHOUT Prototype Cluster Processor Module for the ATLAS Level-1.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
X. Wu, March ATLAS Egamma Trigger Overview Xin Wu University of Geneva.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 (Not just) Backplane transmission options.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
22nd March, 2005CPM FDR, Architecture and Challenges1 CPM architecture and challenges oCP system requirements oArchitecture oModularity oData Formats oData.
ATLAS L1Calo Upgrade1 What data do we put in RTDP? Assume 160 Mbit/s rate from CPMs  24 lines/CPM/CMM at 160 Mbit/s  8 ROIs/CPM/CMM   12 bits / cluster.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 (Not just) Backplane transmission options.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
PreProcessor Upgrade Issues Victor Andrei Kirchhoff-Institut für Physik (KIP) Ruprecht-Karls-Universität Heidelberg L1Calo Weekly Meeting, 10 January 2013.
LHCC Review, CERN, 19/10/99Paul Bright-Thomas, for Alan Watson 1 LVL1 Calorimeter Algorithm Updates Changes since the TDR: Greater “integration” of e/
JEP HW status and FW integration plans Uli Schaefer and Pawel Plucinski Johannes-Gutenberg Universitaet Mainz Stockholm University.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
JFEX Uli Schäfer 1 Mainz Logos ? jFEX (inc. specific software/firmware & Tilecal input signal, options) 30'
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Algorithms and TP Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, Heidelberg, January 11-13, 2010.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
Level-1 Calorimeter Trigger Readout Driver FDR/PRR 15 th August 2006 Introduction to the ROD Norman Gee 15-Aug-2006 Norman Gee.
12 th Workshop on Electronics for LHC experiments - Valencia- 25 th - 29 th Sept. 2006Gilles MAHOUT Production Test Rig for the ATLAS Level-1 Calorimeter.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
Monitoring of L1Calo EM Trigger Items: Overview & Midterm Results Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 11/11/2010.
Upgrading the ATLAS Level-1 Calorimeter Trigger using Topological Information Yuri ERMOLINE, Michigan State University TWEPP 2010, Aachen, Germany,
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Trigger/DAQ/DCS. LVL1 Trigger Calorimeter trigger Muon trigger Central Trigger Processor (CTP) Timing, Trigger, Control (TTC) Germany, Sweden, UK Italy.
TRIGGERING IN THE ATLAS EXPERIMENT Thomas Schörner-Sadenius UHH Teilchenphysik II 4. November 2005.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
UK LVL1 Meeting, RAL, 31/01/00Alan Watson 1 ATLAS Trigger Simulations Present & Future? What tools exist? What are they good for? What are the limitations?
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
The ATLAS Trigger System 1.Global Requirements for the ATLAS trigger system 2.Trigger/DAQ Architecture 3.LVL1 system 4.HLT System 5.Some results from LHC.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
CP Athena Monitoring Status as of 20/05/08 Revised directory structure (again!). Phi scale configurable in degrees, radians or channels. Existing plots.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Configuration and local monitoring
Rainer Stamen, Norman Gee
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Upgrade Phase 2 Introduction and timescales
L1Calo Phase-1 architechure
J. R. A Booth, D. G. Charlton, C. J. Curtis, P. J. W. Faulkner, S
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Implementation of the Jet Algorithm ATLAS Level-1 Calorimeter Trigger
Front-End Cabling ‘Bible’
Testing the PPrASIC Karsten Penno KIP, University of Heidelberg
The First-Level Trigger of ATLAS
Level-1 Calo Monitoring
The ATLAS First Level Calorimeter Trigger
(Not just) Backplane transmission options
Presentation transcript:

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Rx   Calorimeters (LAr, Tile) 0.2x x Mb/s analogue ~75m 0.1x0.1 RoI Builder L1 CTP PreProcessor Timing alignment 10-bit FADC FIR filter BCID LUT Sum 2x2 BC-MUX PreProcessor Timing alignment 10-bit FADC FIR filter BCID LUT Sum 2x2 BC-MUX Jet/Energy Processor Sum Em+Had Jet/Energy Processor Sum Em+Had Jet identification Threshold count E T  Ex, Ey  E T, E T Cluster Processor RoI identification e/  /  classification Threshold count Cluster Processor RoI identification e/  /  classification Threshold count DAQ

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Processing Result counting   PPM 0 PPM 1 PPM 2 PPM 3 CP M0 CPM 1 CPM 2 CP M3 Algorithms based on overlapping windows e/  /  E T cluster + isolation Crates & modules processes  quadrants

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Input Output

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Towers Jet sum ASIC FADCs LVDS 4  delay

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Tests with 2 CPMs LVDS data sources LVDS data input

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003 Custom Backplane: Common design for CP and JE systems

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003

Alan Watson ATLAS Overview week, Prague, 17/09/2003