Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.

Slides:



Advertisements
Similar presentations
BUILDING AIR CONDITIONING
Advertisements

New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Components of HVAC System
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
SENIOR THESIS PRESENTATION
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Brian Ault – Mechanical OptionSpring 2008 Senior ThesisBarshinger Life Science & Philosophy Ann & Richard Barshinger Life Science & Philosophy Building.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Senior Thesis 2013 Ji Won Park Mechanical Option Advisor: Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Miller Children’s Hospital Pediatric Inpatient Addition Long Beach, CA.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Heating, Ventilating, and Air Conditioning
Grunenwald Science and Technology Building
Eastern Pennsylvania Laboratory Facility
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Heating, Ventilating, and Air-Conditioning
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Feasibility of Ice Storage
The Bond Street Wharf Baltimore, Maryland
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
Lehigh Valley Heritage Center
Presentation transcript:

Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais

 Building Description  Existing Mechanical System  Proposed Redesign  Alternative Option  Emergency Power System  Equipment Installation  Redesign Conclusions Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Shell and Core construction  4 Story, 64,000 square feet  Fit-outs based on tenant needs  Keep construction cost low  Maximize leasable area 12,700 ft 2 open, 3,300 ft 2 core Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Multi-disciplinary offices  Conference and waiting rooms  Patient exam rooms  2 Linear accelerators  PET/CT scanner  Nuclear lab  Infusion suites  Radiology rooms Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Structure Steel superstructure Reinforced, composite concrete slabs  Electrical 1500kVA utility transformer 480Y/277V, 2,500 amp main switchboard  Construction AIA 111, Guaranteed cost plus fee Chris Nicolais / DASCO MOB / AE senior thesis 2008

 3 packaged roof top AHUs Direct expansion electric cooling 20% outdoor air  Fan powered VAV terminal units Electric reheat coils at each box Ducted supply, plenum return  9 Domestic water heaters watt elements Chris Nicolais / DASCO MOB / AE senior thesis 2008

Ground Floor First Floor Chris Nicolais / DASCO MOB / AE senior thesis 2008 AHU-137,000 cfm130 ton AHU-310,680 cfm30 ton

Second Floor Third Floor Chris Nicolais / DASCO MOB / AE senior thesis 2008 AHU-236,000 cfm130 ton

DesignSimulationDesignSimulation AHU-137,000 cfm25,070 cfm130 tons78.3 tons AHU-236,000 cfm15,915 cfm130 tons70.6 tons AHU-310,680 cfm5,278 cfm30 tons19.2 tons Total83,680 cfm46,263 cfm290 tons168.1 tons Difference37,417 cfm121.9 tons Chris Nicolais / DASCO MOB / AE senior thesis 2008

 All electric energy consumption  Electric heating coils  Domestic water heaters Chris Nicolais / DASCO MOB / AE senior thesis 2008

 2 Computer room ACUs Nuclear lab equipment cooling  Fan powered HEPA ceiling modules Clean and ante rooms  3 Chillers with closed loop glycol systems Direct cooling for both linear accelerators and the PET/CT scanner Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Goals Reduce energy consumption Improve system efficiency Decrease annual operating cost Reduce emissions  Concerns System cost Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Create a dedicated chiller plant Cool using chilled water Heat using boiler water  Equipment Necessary Chiller Cooling Tower Boiler Chilled Water AHU Chris Nicolais / DASCO MOB / AE senior thesis 2008

 AHU ton, 45,488 cfm  Chiller 136 ton electric screw chiller R-134a refrigerant 85˚F EWT / 44˚F LWT Single load constant flow primary pump  Cooling Tower Design 3 gpm per ton gpm induced draft crossflow Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Gas-fired boiler Sized for space heating and service hot water using ASHRAE Applications Handbook 865,534 BTU per hour Fin-tube radiators at perimeter loads Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Hot water storage tank 492 gallon capacity Water – water heat exchanger uses boiler water Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Existing v. Redesign Redesigned system consumes 1.57% more energy Redesigned System produces less SO 2 and NO x Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Data based on RS Means 2008 Mechanical Cost Data and contractor payment sheet provided by engineer  Redesigned system equipment costs $14,047 less than existing system equipment, no payback period Chris Nicolais / DASCO MOB / AE senior thesis 2008

Redesigned system operating costs $15,654 less each year Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Utilize campus chilled water 4 chiller plant 216,280 tons per year needed Purchase at $0.10 per ton Chris Nicolais / DASCO MOB / AE senior thesis 2008 Cooling$13,859 Pumps$1,560 Cooling Tower Fans$6,258 Total$21,667

 Eliminate purchase of new chiller and cooling tower total savings $69,536 More costly to connect to existing plant  Complications Connecting healthcare and non-healthcare buildings to the same plant Different building codes Owner would prefer stand-alone building for resale Hospital retains capacity for future expansion Chris Nicolais / DASCO MOB / AE senior thesis 2008

 RS Means 2008 Mechanical Cost Data Chris Nicolais / DASCO MOB / AE senior thesis 2008 Existing equipment: 38 days, $36,389

Chris Nicolais / DASCO MOB / AE senior thesis 2008 Redesigned equipment: 35 days, $42,476

 Maximize leasable space  Existing floor plans leave no room for mechanical equipment Construct a 200 square foot mechanical housing Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Equipment housing increases mechanical system first cost by $5,500  Make area in ground floor plan Requires 0.4 percent reduction in leasable space Approximately 79.3% open for tenant use 80% ideal for MOB Chris Nicolais / DASCO MOB / AE senior thesis 2008

 Engineers limited by shell and core design Low first cost mechanical equipment Approximate occupant loads for system sizing Easily adaptable equipment for fit-out floor plans  Redesign system 1.57% energy consumption increase Reduced emissions $15,654 annual operating cost savings Even equipment and installation costs  Redesigned system would be preferred to optimize performance Chris Nicolais / DASCO MOB / AE senior thesis 2008

Thanks to Leach Wallace Associates, DASCO Companies, Dr. William Bahnfleth, AE friends