Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.

Slides:



Advertisements
Similar presentations
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
Advertisements

Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ion Accelerator Complex for MEIC January 28, 2010.
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
Ion Beam Cocktail Development and ECR Ion Source Plasma Physics Experiments at JYFL Olli Tarvainen 11th International Conference on Heavy Ion Accelerator.
XXXVIII th Rencontres de Moriond MORIOND WORKSHOP ON Radioactive beams for nuclear physics and neutrino physics Acceleration of RIB using cyclotrons Guido.
Carbon Injector for FFAG
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
December 2007ESF-Workshop, Athens, Greece University of Jyväskylä, Department of Physics ECR ion source for the highly charged, intensive ion beams H.
J. Rodnizki SARAF, Soreq NRC HB2008, August, 2008 Nashville TN Lattice Beam dynamics study and loss estimation for SARAF/ EURISOL driver 40/60 MeV 4mA.
Particle dynamics in electron FFAG Shinji Machida KEK FFAG04, October 13-16, 2004.
JINR PAC, Dubna, G. Gulbekian Status of the DRIBs III Project cyclotron DC280 new experimental hall (SHE factory) cyclotron U400R reconstruction.
2007/2/111 A Report to the Advisory Committee of CNS The Accelerator Group Outline Progress in April – December 2006 Schedule in Jan – March 2008.
LBNL 88'' cyclotron operations Status of the 88-Inch Cyclotron High-Voltage upgrade project December 14, 2009 Ken Yoshiki Franzen.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
ICIS2015,Aug , 2015, New York, USA Further improvement of RIKEN 28GHz SC-ECRIS for production of highly charged U ion beam T. Nakagawa (RIKEN, Nishina.
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
Study of Compact Medical FFAG Accelerators - Radial Sector Type - T. Misu, Y. Iwata, A. Sugiura, S. Hojo, N. Miyahara, M. Kanazawa, T. Murakami, and S.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Contents Overview of 150 MeV FFAG Accelerator
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1 CNS summer school 2002 The RI-Beam Factory and Recent Development in Superheavy Elements Search at RIKEN ◆ Brief introduction to the RI Beam Factory.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
FFAG Accelerators for Radio-Isotopes Production Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Operation of the RF System for heavy ion accelerators in RIKEN RI Beam Factory K. Suda, N. Sakamoto, K. Yamada, H. Okuno, Y. Higurashi, O. Kamigaito, M.
Recent progress of RIKEN 28GHz SC-ECRIS for RIBF T. Nakagawa (RIKEN) 1.Introduction RIKEN Radio isotope factory project 2.RIKEN 28GHz SC-ECRIS Structure(Sc-coils,
Current Status of Web Application for RIBF Accelerator
Korea Atomic Energy Research Institute Byung-Hoon Oh, Sang-Ryul In, Kwang-Won Lee, Chang Seog Seo*, Jung-Tae Jin, Dae-Sik Chang, Seong Ho Jeong, Chul-Kew.
The 12th Symposium on Accelerator Physics, Yuzhong, Gansu, China1 Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT Youjin.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
The RIKEN RI Beam Factory
NICA injection complex status
Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT
A. Martynov on behalf of accelerator division.
DECRIS-PM ion source for DC-280 cyclotron
Current Status of Electron-RI Collision Project at RIKEN
HIAF Electron Cooling System &
Progress in the Multi-Ion Injector Linac Design
Injector Cyclotron for a Medical FFAG
Acceleration of RIB using linacs
How to run ions in the future?
A. Plastun¹, B. Mustapha, Z. Conway and P. Ostroumov
Beam dynamics of RAON accelerator system
EffiCAS Efficient Facility for Ions at CAS
ADS Accelerator Program in China
FFAG Accelerator Proton Driver for Neutrino Factory
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
commissioning and measurements
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Summary & Concluding remarks
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low intensity Beam now (2008) (Goal: 1p  A U-ion beam) Heavy Ion Beams (2007-) RI Beam Factory (1997-)

Preview of the Talk RILAC ECRIS CSM AVF RRC fRC IRC SRC Status of the beam intensity Upgrade plans of the Injector Simulation results using TRACK Introduction of RIBF Space Charge Forces IonECRIS out RFQ out RILA C out RRC out 1 st Str. out FRC out 2 nd Str. out IRC out SRC out June 2007 U July 2008 U Fixed Frequency Mode

Introduction RIKEN RI Beam Factory RILAC ECRIS RRC The Old Facility (1975~1990) fRC IRC SRC -- World’s First! RIBF (1997~(2012)) BigRIPS (Fragment Seperator)

Min. Energy for RI-Beam production Performance of the RIBF Cyclotrons

Symbolic photos and movie for RIBF construction and comissioning H. Okuno, et. al., “Commissioning of the Superconducting Ring Cyclotron for the RIKEN RI Beam Factory”, IEEE Trans. Appl. Superconduct., vol. 18, no.2, pp226-pp231, June First Beam from SRC at 4PM on Dec Beam Profile of the first beam: 27 Al MeV/u

Variable Frequency mode RFQ+ RILAC 1 st Str. RRC2 nd Str. IRCSRC Freq. (MHz) 36.5 Q18  26  34 E (MeV/u) Example: The main parameters for Kr (345MeV/u) U (345 MeV/u) > 70+) RFQ+

Fixed Frequency Mode for U 345MeV/u acceleration RFQ+ RILAC RRC1 st Str. FRC2 nd Str. IRCSRC Freq. (MHz) Q35  73  86 E (MeV/u) Example: U (345MeV/u) RFQ+ v gain =2

Fixed Frequency Mode Accelerated Beams so far 1 pnA = 6 x 10 9 pps IonECRIS out RFQ out RILA C out RRC out 1 st Str. out FRC out 2 nd Str. out IRC out SRC out June 2007 U July 2008 U T. Kubo, et. al., “Identification of New Isotopes 125 Pd and 126 Pd Produced by In-Flight Fission of 345 MeV/nucleon 238 U: First Results from the RIKEN RI Beam Factory”, Journal of the Physical Society of Japan Vol. 77, No8, August, 2008 The F.C.s were not well calibrated (tend to show larger current than reality). Goal intensity : 1000pnA IonECRIS out RFQ out RILAC out 1 st Str. out RRC out 2 nd Str. out IRC out SRC out Nov Kr June 2008 Ca Variable Frequency Mode 8 times? Good long term stability

Key issues to increase the intensity of U beam Increase the beam intensity from the ion source –New 28GHz Superconducting ECR ion source –Goal intensity of U 35+ >15 p  A ( 1p  SRC) –Operation test will be started in January 2009 Improve transmission efficiency –Flattop acceleration in the cyclotrons –Careful tuning in each accelerator –New injector (Efficient acceleration in the low energy region) –Avoid the emittance growth due to the space charge. Make charge strippers with long lifetimes –The 1 st stripper is critical. –Max. lifetime after RRC –Searching another candidate: Rotating, Gas, Liquid Li… Hasebe, Kuboki: France

Plan A: New injector to RRC

Plan B: Put the 28GHz ECR ion source before the existing RILAC RFQ In the mode for U (345 MeV/u) acceleration Frequency of the injectors :18.25 MHz (Low) Extraction voltage : 5kV (Low) Acc. voltage after the RFQ :127kV (Low)  put 28GHz ECR on the HV deck (127kV) to directly inject to RILAC, skipping RFQ 28GHz SC-ECR 100kV Deck MHz 127kV injection 5kV extraction

Plan B is easy for us. RILAC tank#1~#6 RFQ 18GHz ECR Room for 450kV Cockroft-Walton RILAC tank#1~#6 28GHz SC-ECR Now From April 2009 MEBT LEBT RRC Beam Dynamics Study using the TRACK code 100 kV Deck

LEBT (Outline) 36+,35+,34+ of 238 U x y from Ion Source (27kV) Solenoid 90deg. Bending Magnet with fringing fields to selection slit preliminary 0 mA

LEBT (Neutralization of Space Charge Effect) 100 %75 %50 %25 %0 % Conditions  x,y = 200  mm mrad 238U35+ = 0.5 mA  O(2+,3+,4+,5+,6+) = 10 mA preliminary ?

MEBT (127kV, 0 mA and 0.5 mA) Buncher (1f+2f) after acceleration tube (127 kV) to RILAC Bunching efficiency ~ 52 % (+- 10deg, 0 mA and 0.5 mA) preliminary Transmission : 100 % Transmission : 93 % 127kV is enough high to suppress emittance growth.

RILAC (Wideroe Type, 0 mA and 0.5 mA) Tank #1 Tank #2Tank #3 Tank #4Tank #5Tank #6 preliminary Transmission : 99 % Transmission : 87 %

Emittance (r.m.s.) growth in the RILAC 0.5 mA 0.0 mA 0.5 mA Efficiency in the succeeding cyclotrons will decrease.  We need the new Injector (Plan A)! preliminary

Cyclotron Simulation using TRACK code preliminary rf gap B B B B B B B B B B B B

RRC (0 mA and 0.5 mA) 73 turns 27 % of total turns “Round Beam” or Spiral instability: S. Adam/PSI Injector II ? 0 mA 0.5 mA preliminary

Review of the Talk RILAC ECRIS CSM AVF RRC fRC IRC SRC Status of the beam intensity Upgrade plans of the Injector Beam dynamics using TRACK Introduction of RIBF Space Charge Forces IonECRIS out RFQ out RILA C out RRC out 1 st Str. out FRC out 2 nd Str. out IRC out SRC out June 2007 U July 2008 U Fixed Frequency Mode LEBTMEBTRILACRRC Neut. Factor ????? ???? spiral ????