ATSRAC Task 9 Draft EZAP NPRM and Advisory Circular Presented by: Randy M. Boren Northwest Airlines Chair, ATSRAC T9HWG.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

FACILITIES & EQUIPMENT
General Safety Overview and Information
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
MAJOR REPAIRS AND ALTERATIONS
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
Proper Use of Extension Cords Proper Use and Electrical Hazard Awareness for Extension Cord Users Module 2.
EET Survey of Electronics
Controlling Hazardous Energy
Fuel Tank Safety Briefing
1 Status of ATSRAC presented to White House Wire System Safety Interagency Working Group Meeting Kent V. Hollinger September 11, 2001.
Office of Aviation Safety Bob Swaim Airworthiness ABX Air Ground Fire.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
TCCA Aircraft Certification
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
141 SEMINAR Review of Part 91 and Part 43
The Maintenance and Engineering Organization
08 June 2006Portland; Oregon; USAPeter Corbeeel Reducing the risk of smoke and fire in transport airplanes: related EASA rulemaking actions Peter Corbeel.
1 Avionics Workshop Ottawa, Ontario Nov.2003 Installation Approval of Non-required Avionics Equipment ISSUE TCCA Regional aircraft certification engineers.
OSHA Most Frequently Cited Serious Violations
International Aircraft Materials and Fire Test Working Group Contamination/Aging Task Group Contamination Daniel Slaton Boeing Commercial Airplanes Material.
Definitions, Goals and Objectives
HWG-10 Presentation to the FAA Aging Aircraft Workshop Presentation By: Jon Haag Chairman of HWG-10.
U.S./Europe International Aviation Safety Conference By: Ali Bahrami, FAA; Martin Eley, TCCA; Yves Morier, EASA Date: June 5, 2008 “Global Safety Management:
PRESENTS.
Commercial Parts Considerations CAANZ Delegate Conference, Oct 2009 Neil Burton Senior Design Engineer Altitude Aerospace Interiors.
Electrical Safety.
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
ATSRAC Task 9 Harmonization Working Group FAA PMI Workshop Seattle November 6, 2001 Presented by Tony Harbottle Airbus.
Presented to: By: Date: Federal Aviation Administration Airworthiness Preventive Maintenance R1.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
14 October 2015 Aircraft Maintenance Module1 Aircraft Maintenance Management Module MRO- Avionics Shop.
1a.  Exposed part  Live or energized part  De-energized part 1a.
Federal Aviation Administration Maintenance "Personal Minimums" Federal Aviation Administration DOT/FAA.
Maintenance "Personal Minimums"
Techair – we take care On the other side of the 337 what your client does when he gets a mod and how we can produce better mods to help him John Aplin.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle, Washington November 6, 2001.
Electrical Safety. Definitions v Exposed part v Live or energized part v De-energized part 1a.
ELECTRICAL SAFETY. ELECTRICAL INSPECTION THE FOLLOWING EXAMPLES ARE INTENDED TO ASSIST THE BUILDING MANGER IN DETERMINING THE DEGREE OF COMPLIANCE, WTHIN.
Federal Aviation Administration Plane Sense R1 11/05/2012.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle Washington.
Chapter 2 Development of Maintenance Programs
1 Common Standard Wiring Practices Documents ATSRAC Task 7 Working Group presented by Don Andersen HWG7 Co-chairman.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Electrical Safety Craig Shurson CSP, ARM Regional Loss Control Coordinator Hortica - The Florists Mutual Company.
Improvement of Maintenance Criteria - Task 3 1 Improvement of Maintenance Criteria ATSRAC Task 3 presented by T J Harbottle Task 3 Working Group Chairman.
BACKGROUND NSTM 300 was completely re-written to clarify and update requirements for today’s increasingly complex shipboard electrical systems. The enclosed.
Night Vision Imaging System (NVIS) Maintenance
Presented to: By: Date: Federal Aviation Administration AIRWORTHINESS Positive Safety Culture Failure to Follow Procedures 1 R1.
Federal Aviation Administration Downloaded from Plane Sense R1 11/05/2012.
1 ATSRAC Overview presented to EAPAS Workshop for FAA Inspectors/Engineers Kent V. Hollinger November 5, 2002.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Chapter 6 Requirements for a Maintenance Program.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Electrical Safety OSHE 382, Spring 2016
The Control of Hazardous Energy (Lockout-Tagout)
Aeronautical PUBLICATIONS
ACCEPTANCE PROCEDURE FOR ALL SHIPMENTS
OSHA Most Frequently Cited Serious Violations
The Control of Hazardous Energy (Lockout-Tagout)
Personal Protective Equipment
Aging Systems Task Force
Electrical Safety.
Control of Hazardous Energy
    ELECTRICAL SAFETY    .
Introduction to ATA chapters ATA CHAPTERS Aircraft general - ATA Airframe systems - ATA Structure - ATA Propeller/rotor - ATA.
Presentation transcript:

ATSRAC Task 9 Draft EZAP NPRM and Advisory Circular Presented by: Randy M. Boren Northwest Airlines Chair, ATSRAC T9HWG

ATSRAC Task 3 Enhancement of Inspection Criteria and Expectations Maintenance Program Enhancement  Maintenance Practices  EZAP

ATSRAC Task 9 Draft SFAR and other rule language to require  EZAP  Protection and caution information  Training Draft A.C. for method of compliance

EZAP Enhanced Zonal Analysis Procedure

EZAP An analytical logic procedure specifically designed to identify applicable and effective tasks that…

1) minimize accumulation of combustible materials,

2) address wiring discrepancies,

3) address installations where wiring is in close proximity to both primary and backup flight controls.

Draft EZAP NPRM

SFAR Portion of NPRM Mandates TC/STC Holders to apply certain new certification requirements to existing aircraft

Rule Change Portion of NPRM Mandates new requirements for instructions for continued airworthiness for new TC/STC’s, and new operating requirements for Operators and Repair Stations

Effect on TC/STC Holders

SFAR Effect on TC/STC Holders - For existing designs…. 1.TC/STC Holders must perform an analytical logic procedure specifically designed to identify applicable and effective tasks that minimize accumulation of combustible materials, address wiring discrepancies, and address installations where wiring is in close proximity to both primary and backup flight controls.

SFAR Effect on TC/STC Holders - For existing designs…. 2.TC/STC Holders must communicate to FAA and operators the results of the analytical logic procedure.

SFAR Effect on TC/STC Holders - For existing designs…. 3.TC/STC Holders must update Instructions for Continued Airworthiness to include tasks derived from the analytical logic procedure.

SFAR Effect on TC/STC Holders - For existing designs…. 4.TC/STC Holders must ensure that the standard practices section of the maintenance instructions include protection and caution information to minimize contamination and accidental damage to electrical wiring interconnection systems.

SFAR Effect on TC/STC Holders - For existing designs… 5.TC/STC Holders must include protection and caution information to minimize contamination and accidental damage to electrical wiring interconnection systems in all newly created maintenance instructions, including service bulletins, where applicable.

Rule Change Effect on TC/STC Holders - For new designs… Part 25, Appendix H - Instructions for Continued Airworthiness 1.Scheduled maintenance instructions for electrical wiring interconnection systems shall include tasks derived from an analytical logic procedure that provides a means to identify applicable and effective tasks …

Rule Change Effect on TC/STC Holders - For new designs… Part 25, Appendix H - Instructions for Continued Airworthiness (continued) … that minimize accumulation of combustible materials, address wiring discrepancies, and address installations where wiring is in close proximity to both primary and backup flight controls.

Rule Change Effect on TC/STC Holders - For new designs… Part 25, Appendix H - Instructions for Continued Airworthiness (continued) 2.Instructions for maintenance, alteration, or repairs must include protection and caution information designed to minimize contamination and accidental damage to electrical wiring interconnection systems where applicable.

Rule Change Effect on TC/STC Holders - For new designs… Part 25, Appendix H - Instructions for Continued Airworthiness (continued) 3.Instructions for maintenance, alteration, or repairs of electrical wiring interconnection systems must be in a standard format, and must include wire separation guidelines and special wiring identification requirements.

Rule Change Effect on TC/STC Holders - For new designs… Part 25, Appendix H - Instructions for Continued Airworthiness (continued) 4.Instructions for continued airworthiness of electrical wiring interconnection systems must include electrical load data, and instructions for updating electrical load data.

Rule Change Effect on TC/STC Holders Part 25, New Rule – EZAP for Modifications 1.For each new modification to a TC/STC, the TC/STC Holder shall determine if the modification requires application of an analytical logic procedure that provides a means to identify applicable and effective tasks that minimize accumulation of combustible materials, address wiring discrepancies, and address installations where wiring is in close proximity to both primary and backup flight controls.

Rule Change Effect on TC/STC Holders Part 25, New Rule – EZAP for Modifications 2.Apply the analytical logic procedure for each modification as determined in (1.). 3.Include tasks derived from the application of the analytical logic procedure in the modification instructions. These tasks shall be uniquely identified in the instructions for future traceability.

Draft EZAP NPRM Effect on Operators and Repair Stations

NPRM Effect on Operators & Repair Stations 1. Special Maintenance Program Requirements 2. EWIS Training Program Requirements 3. Analysis of “Orphan” STC’s

1. Special Maintenance Program Requirements a) Protection and Caution Information, Part 91, 121, 125, and 129 Operators Maintenance instructions must include protection and caution information designed to minimize contamination and accidental damage to electrical wiring interconnection systems where applicable.

1. Special Maintenance Program Requirements (continued) a) Protection and Caution Information, Part 145 Repair Stations The Repair Station General Instructions Manual must include protection and caution information designed to minimize contamination and accidental damage to electrical wiring interconnection systems where applicable.

1. Special Maintenance Program Requirements (continued) b) Analytically Derived EWIS Tasks Part 91, 121, 125, and 129 Operators The maintenance program must include instructions for the continued airworthiness of electrical wiring interconnection systems that are developed using an analytical logic procedure that provides a means to identify applicable and effective tasks ….

1. Special Maintenance Program Requirements (continued) … that minimize the accumulation of combustible materials, address wiring discrepancies, and address installations where wiring is in close proximity to both primary and backup flight controls.

2. EWIS Training Program Requirements Part 121, 125, and 129 Operators, and Part 145 Repair Stations Each operator/repair station must have a training program that accomplishes the following:

2. EWIS Training Program Requirements (continued) a)Ensures acceptable awareness of wiring as a system that requires adherence to proper procedures, methods, techniques, and practices Target Audience: All persons who perform maintenance, inspection, alteration or cleaning of aircraft.

2. EWIS Training Program Requirements (continued) b)Ensures an acceptable knowledge of housekeeping practices to be followed during the performance of maintenance, inspection, alteration, and cleaning in order to minimize contamination and accidental damage to electrical wiring interconnection systems. Target Audience: All persons who perform maintenance, inspection, alteration, or cleaning of aircraft.

2. EWIS Training Program Requirements (continued) c)Ensures acceptable knowledge of procedures, techniques, and practices to be used when performing maintenance, inspection, alteration, and cleaning of electrical wiring interconnection systems. Target Audience: All persons who perform maintenance, inspection, alteration, and cleaning of electrical wiring interconnection systems. The training should be specific to the tasks they perform.

3. Analysis of Orphan STC’s Part 91, 121, 125, and 129 Operators For each STC for which there is no viable STC Holder to comply with the requirements of SFAR xxx…..

3. Analysis of Orphan STC’s a)Determine if the STC requires application of an analytical logic procedure that provides a means to identify applicable and effective tasks that minimize the accumulation of combustible materials, address wiring discrepancies, and address installations where wiring is in close proximity to both primary and backup flight controls.

3. Analysis of Orphan STC’s b)Apply the analytical logic procedure for each STC affected c)Amend the aircraft maintenance program as required based on the results of the analytical logic procedure

Draft EZAP Advisory Circular

Draft EZAP A.C. EWIS Definition Inspection Definitions Guidance for GVI / Zonal Inspections Maintenance Practices EZAP Logic

EWIS – Electrical Wiring Interconnection System An electrical connection between two or more points including the associated termination devices and the necessary means for its installation and identification.

Included in EWIS: (1) Wires and cables (2) Bus bars (3) Connection to electrical devices (4)Circuit breakers or other circuit protection devices (5)Connectors and accessories (6) Electrical grounding and bonding devices (7) Electrical splices

Included in EWIS: (8) Materials used to provide additional protection for wires (9) Shield or braids (10) Conduits that have electrical termination for the purpose of bonding (11) Clamps and other devices used to route and support the wire bundle (12) Cable tie devices (13) Labels or other means of identification (14) Pressure seals associated with EWIS

Not Included in EWIS: (1) Wiring inside avionics equipment, (2) Equipment including non-required miscellaneous equipment qualified to environmental conditions and testing procedures approved by the Administrator other than those specifically included in this definition, (3) Equipment qualified to a technical standard order (4) Portable, carry on, or otherwise non- permanently mounted electrical equipment. (5) Fiber optics

Inspection of EWIS

GVI – General Visual Inspection A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight or droplight and may require removal or opening of access panels or doors. Stands, ladders or platforms may be required to gain proximity to the area being checked.

GVI – General Visual Inspection A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure or irregularity.

GVI – General Visual Inspection GVI is accomplished within touching distance unless otherwise specified.

GVI – General Visual Inspection GVI allows use of a mirror to enhance visual access to all exposed surfaces in the inspection area.

Zonal Inspection A collective term comprising selected General Visual Inspections and visual checks that are applied to each zone, defined by access and area, to check system and power plant installations and structure for security and general condition.

DET - Detailed Inspection An intensive examination of a specific item, installation, or assembly to detect damage, failure or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses or other means may be necessary. Surface cleaning and elaborate access procedures may be required.

DET - Detailed Inspection Not the same as DVI… DET allows tactile examination to determine condition.

Guidance for GVI / Zonal Inspection of EWIS

EWIS Discrepancies Detectable by GVI / Zonal Inspection Wiring / Wire Bundles Wire-to-wire or wire-to-structure contact/chafing Wire bundle sagging or improperly secured Wires damaged (obvious damage due to mechanical impact, overheat, localized chafing, etc.) Lacing tape and/or ties missing/incorrectly installed Wiring protection sheath/conduit deformity or incorrectly installed End of sheath rubbing on end attachment device Grommet missing or damaged

EWIS Discrepancies Detectable by GVI / Zonal Inspection Wiring / Wire Bundles (continued) Dust and lint accumulation Surface contamination by metal shavings/swarf Contamination by liquids Deterioration of previous repairs (e.g., splices) Deterioration of production splices Inappropriate repairs (e.g., incorrect splice) Inappropriate attachments to or separation from fluid lines

EWIS Discrepancies Detectable by GVI / Zonal Inspection Connectors External corrosion on receptacles Backshell broken Rubber pad or packing on backshell missing No backshell wire securing device Fool-proofing chain broken Missing or broken safety wire Discoloration/evidence of overheat on terminal lugs/blocks Torque stripe misalignment

Maintenance Practices

Learned Complacency - Institutionalized acceptance of discrepant conditions

Common Sense “…Clean and protect as you go”

EZAP Logic Chart