ON / OFF SD16 CX05 SD11 SD05 CX06 SD12 SD06 CX07 SD13 SD07 CX08 SD27 SD01 CX09 SD15 SD03 SD10 Stable operation Temperature Monitoring and Heater / Pressure.

Slides:



Advertisements
Similar presentations
1. LEVELS OF BIOLOGICAL ORGANISATION AN INTRODUCTION TO HOMEOSTASIS.
Advertisements

Thermostats, Pressure Switches, and Other Electric Control Devices
HEAT PUMPS.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
Blow Dryers A heat transfer problem waiting to happen By Scott Lemmon and Charlie Crosby.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Thermal energy Ch. 6 mostly. Transferring thermal NRG There are three mechanisms by which thermal energy is transported. 1. Convection 2. Conduction 3.
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Heat load study of cryomodule in STF
Air Conditioning Heating Refrigeration
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Preliminary Design for the Coupling Coil Cryostat in MICE
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
Section 3 Using Heat.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
The Clausius Inequality Expressions of inequality/equality relating to heat flow at a fixed temperature. The expression is required for the derivation.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ELECTROMOTIVE FORCE. Consider the following diagram showing a circuit with an external resistance (R) internal resistance (r) and EMF ( ε ). When.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1317 Natural Gas Processing I Chapter 6A Intro to Refrigeration.
Unit 13 Oil-Burning Equipment
Feedback on transfer line sizing and flow calculations for UT
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
Cryogenic behavior of the cryogenic system
TEMPERATURE SENSOR LOCATIONS
SMART ENERGY CRYO-REFRIGERATOR TECHNOLOGY FOR THE NEXT GENERATION VERY LARGE ARRAY J. Gardiner, J. Lawton, J. Hamilton, K. Knight, J. Sloan, S. Spagna.
High Pressure screw compressor
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Heating Unit Controller at NSRC SOLARIS
SNS PPU Cryomodule Instrumentation
Cryogenic behavior of the magnet
SNS PPU Cryomodule Instrumentation
Presentation transcript:

ON / OFF SD16 CX05 SD11 SD05 CX06 SD12 SD06 CX07 SD13 SD07 CX08 SD27 SD01 CX09 SD15 SD03 SD10 Stable operation Temperature Monitoring and Heater / Pressure Feedback CX01 CX02 CX12 Level 1 Level 2 Level 3 CC 1CC 2CC 3CC 4SingleCC 5 Pressure SD02 SD08 SD14 Vacuum Vessel Radiation Shield Cold Mass Heater Power SD26 SD25 SD23SD19 Fill Line Heater Power CX11 CX10

CC1CC2CC3CC4CC5 SS Temp Out Temp Out Temp Out Temp Out Temp Out Temp Out Temp In Temp In Temp In Temp In Temp In Temp In Flow Rate High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp High He Pressure Low He Pressure High He Temp Oil Temp External thermocouples for the single stage cooler. Compressor operation monitoring

Set Point Coil Power supplies and Voltage Tap monitoring and Control Matchin g Coil 1 Matching Coil 2 End Coil 1Centre CoilEnd Coil 2 Value Ramp Rate Voltage VTM1VTM2VTM3VTM4VTM5VTM6VTM8VTM9VTM7VTM1VTM2 Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage Set Point Ramp Rate Voltage VTL2 VTL9VTL10 VTL1VTL4 VTL11VTL12 VTL3VTL6 VTL13VTL14 VTL5VTL8 VTL15VTL16 VTL7 Contactor 3Contactor 2Contactor 1 Open / Close 3 Diode Drop 8 Diode Drop