SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
1 TPC online  offline calibration November 2002.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
DPNC Yannick FAVRE Electronics Highlights /12/ Electronics Highlights2 Electronics group  3 Engineers  Daniel La Marra  Stéphane Débieux.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Qualification Test of UFE Board  Schematic diagram of UFE  Board types and current status  Qualification test procedures  VA & UFE test setup 
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 Activities in Wuhan TopMetal sensor & ALICE ITS upgade Xiangming Sun CCNU ALICE ITS Upgrade and O2 Asian Workshop 2014.
AMS Tracker Data Reduction Status Claude Zurbach Laboratoire de Physique Théorique et Astroparticules – Montpellier Houston, AMS-TIM, January 08, 2007.
Review of SiLC activities LPNHE/ IN2P3 / CNRS / U. Paris VI & VII: J.E.Augustin, G.Badet, A.Charpy, C.Ciobanu, J.David, M.Dhellot, W.da Silva, G.Daubard,
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,
News on GEM Readout with the SRS, DATE & AMORE
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
EUDET ANNUAL MEETING OCT 6th-8th 2008, NIKHEF A 130nm CMOS Digitizer Chip for Silicon Strips readout at the ILC on behalf of W. Da Silva 1, J. David 1,
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
+ SwissFEL Matlab Toolbox ADAQA used for Emittance Measurements Bolko Beutner, Rasmus Ischebeck PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Standalone Silicon Test Infrastructure and Transnational Aspects
Micromegas Vertex Tracker Status Report
Calicoes Calice OnlinE System Frédéric Magniette
SiTRA multipurpose and standalone test infrastructure
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
Sheng-Li Liu, James Pinfold. University of Alberta
Development of built-in diagnostics in the RADE framework (EN2746)
Test Beam Measurements october – november, 2016
Testbeam status report
Presentation transcript:

SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008Alexandre General Overview  Mechanics Module conception Tools development Clean room Modules manufacturing I.DAQ FEE electronics ALTERA 2 Software development  Status of the last test beam Overview Some results II.Project Test SiTr chip Alignment study

October 6th-8th, 2008Alexandre Status of the 2007 beam-test and testbench with Paris Faraday Paris: 3D table PM + Scintillator for triggering Infrared laser Radioactive sourceSr90

October 6th-8th, 2008Alexandre Status of the 2007 beam-test and testbench with Paris Some results of VA1 Pedestal subtraction Common noise study Signal to Noise

October 6th-8th, 2008Alexandre Status of the 2007 beam-test and testbench with Paris Some results of SiTr130-4: Pedestal study (vs channel, sample...)‏ Signal to noise Vs Channel Signal to noise Linearity

October 6th-8th, 2008Alexandre Project Testing the SiTr chips  New HPK sensors performance characterization  Performance extraction of the new chip SiTr (more statistics)‏  Alignement system (M.Fernandez Garcia, I.Villa)‏ Develop an environnement for modules manufacturing for EUDET collaboration (G.Badet, A.Charpy, G.Daubard, C.Evrard, P.Ghislain, D.Imbault, P.Repain)‏  parameters of HPK sensors: dimension, pitch, transparency  Front-end electronics  Development of toolbox  Clean room installation

October 6th-8th, 2008Alexandre Mechanic development Module conception (LPNHE team)‏ Modules with two sensors Different FEE (chip development)‏ Bonding constraints (I.McGill) Faraday cage integration Alignment study Easy and secure handle Study for global structure Schematic view PAFEEVA

October 6th-8th, 2008Alexandre Mechanic development Tools conception for “automated” manufacturing Precise alignment of the different parts of the modules:  silicon strips  pitch adapter connectivity  FEE Perfect integration on the carbon fiber support during the gluing Analogical video camera Suction system with micro metric screw System tolerance

October 6th-8th, 2008Alexandre Mechanic development Tools conception for “automated” manufacturing Keep alignement during the gluing process Perfect integration on the carbon fiber support during the gluing Gluing tool Suction transfert tool

October 6th-8th, 2008Alexandre Mechanic development Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done Work environement

October 6th-8th, 2008Alexandre Mechanic development Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done Work environement

October 6th-8th, 2008Alexandre Mechanic development Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done Work environement

October 6th-8th, 2008Alexandre Mechanic development Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done Work environement

October 6th-8th, 2008Alexandre Mechanic development Faraday cage (I.Villa and V.Saveliev)‏ Two reference sensors equipped with the VA1' chip Example of configuration: Sensors equipped with SiTr chip Collimator for alignment study Possibility to do a “standalone” tracking + EUDET tracking

October 6th-8th, 2008Alexandre Data Acquisition System Flexible system: work with VA1 chip, SiTr (A.Comerma, H.PHAM, R.Sefri), and future Idea: develop a DAQ, can work in EUDET environnement or on standalone for local test Easy upgradable system → FPGA board with USB output/input Real tool box to automatize the different study: pedestal, calibration, alignment etc....

October 6th-8th, 2008Alexandre Data Acquisition System Hardware parts FPGA board with USB connexion (A.Comerma) – VHDL code to manage (M.Dhellot, A.Charpy): SiTr-130 and FEE acquisition for tracking VA1 acquisition for reference tracking

October 6th-8th, 2008Alexandre Data Acquisition System Software parts Slow control is managed by Labview code (J.F.Huppert)‏ DAQ system is written in C++ and using the Root framework (C.Ciobanu, A.Charpy): Set the DAQ system and chip configurations Written the raw data Possibility of on-line monitoring Send the data to EUDET DAQ system if needed

October 6th-8th, 2008Alexandre Data Acquisition System Software parts DAQ system is written in C++ and using the Root framework (C.Ciobanu, A.Charpy): XML Documentation generated by Doxygen (Activity diagram, time diagram)‏ Universal raw data format Unified the control command for the DAQ system Possibility of on-line monitoring Send the data to EUDET DAQ system if needed

October 6th-8th, 2008Alexandre Summary Mechanical status  Tools are ready to produce the module sensors  Availability for EUDET collaboration → Need to know new specification for tool customization or if changes is needed DAQ status  VHDL and C++ code is under development (will be ready for the next testbeam)‏  Next step: SiTr130 management Next tasks  Validation of the DAQ system  Behaviour study of the electronics and sensors with local tests  Characterization of the new SiTr chips → beam DESY in March 2009 Status is available on the following link:

October 6th-8th, 2008Alexandre Thanks