NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.

Slides:



Advertisements
Similar presentations
NCSX Mod Coil C1 features requiring rework at PPPL.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
CE En 112 Engineering Drawing with CAD Application
Chapter 20 Working Drawings
Engineering Graphics Stephen W. Crown Ph.D.
1 Blueprint Reading for the Machine Trades, Sixth Edition Unit 12: Auxiliary Views Russ Schultz and Larry Smith PowerPoint presentation created by LaVonne.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
Ch.9 Tolerancing Objective: Learn how to present tolerance, types of tolerance presentation, fit types and terminology Why tolerance is so important in.
Installation. Indoor Unit Installation Typical Installation.
TECH 104 – Technical Graphics Communication
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
Registered Electrical & Mechanical Engineer
CGT 110 – Technical Graphics Communication
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
Dimensioning and Tolerancing
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
Presented by Brad Nelson Tom Brown, Mike Cole, Paul Fogarty, Paul Goranson, Phil Heitzenroeder, Wayne Reiersen, Dave Williamson, and others NCSX PAC Meeting.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near.
Cold Magnetic Shield Update
NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
NCSX B. Stratton May 13, 2005 Modular Coil Winding Dimensional Control Plan Peer Review.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review.
NCSX NCSX Preliminary Design Review1 Conventional Coils and Structure Phil Heitzenroeder, Len Myatt, and Mike Viola for the NCSX Engineering Team.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March F.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 MC B3 Inspection MTM data: dated 12/22/06 1/6/07 Pro/E model: b3_mtm_data_check.asm T. Brown / D. Williamson.
1 MC B1 Inspection MTM data: FIDUCIALS.IGS DATA.IGS 9/26/06 Pro/E model: b1_mtm_data_check.asm.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
PEER Review of Coil Tolerances and Trim Coil Requirements plus Magnetic Material in Test Cell April 19, 2004 Art Brooks.
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Update on PANDA solenoid design and analysis Gabriella Rolando Helder Pais Da Silva Herman ten Kate Alexey Dudarev 3 November
ELECTRONIC ASSEMBLIES AND SOLDERING TECHNIQUE –PART II
Presentation transcript:

NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II

NCSX 2 Charge Questions Does the lead block design meet requirements (EM, elec, therm, struct, fab)? Are the lower lead blocks and terminals ready for fabrication (C1)? What is the procurement plan for C2-C6, A, B? What issues remain for Type-C? How to solve? What is status/schedule for comprehensive FDR documentation?

NCSX 3 FDR Part I Results – Cladding (4/27) To be addressed by this review

NCSX 4 Lead block and terminal requirements RequirementTRC Design SolutionType-C Changes Provide an accurate means of positioning the conductor. Eighteen block G10 asm with slots and finger guides, line-to-line contact everywhere. G-11CR material, reduce no. of blocks, increase slot widths, mount to complex tee shape. Provide a practical geometry for assembly. Multiple parts, compact bends.Increase min bend radius, fewer parts ok. Isolate the conductors electrically. Compact design but with discrete conductor slots, allowance for varying insulation thickness. Spacing increased, esp between jumpers. Provide thermal continuity with winding pack. Chill plate between upper/lower blocks and side plate extends through MCWF. Same design as TRC. Minimize field errors to island size < 1% total flux Mod coil set with TRC-style leads is ok if leads oriented a certain way. Errors cancel within each coil. Same orientation of new leads gives similar results, but more interaction between coils. Meet clearance requirements for machine assembly. Jumpers base block height increased for ease of fabrication, design would interfere with TF. Height minimized through use of angled terminal jumpers assembly.

NCSX 5 Modifying the TRC geometry Minimize large gaps by conforming to winding pack Change conductor path to ramp up, exit WP at 45-deg angle Minimum radius increased, but MCWF opening slightly larger Lead block envelope after “subtraction” of winding pack TRC conductor path Type-C

NCSX 6 Lead blocks assembly Seven G-11CR blocks, max dimensions are 6.5 x 11 x 3.25-in thick Side-A Side-B Lower block Upper block Side plate Top plate

NCSX 7 Lead blocks assembly Oversize holes for alignment Tee mount bushing Layer #1-2 ramp Positioning tab Upper lead block

NCSX 8 Upper / lower blocks combine features Split blocks used in TRC good for manual machining, but require additional fasteners, glass cloth between interfaces Combined block suitable for NC machining, minimal drawing details SE142C-122 Side-A Lower Block Finger Slots SE142C-134 Side-A Lower Block Straight Slots SE142C-135 Side-B Lower Block Combined

NCSX 9 Lower block drawing

NCSX 10 Side plates w/ cooling Chill plate between lead blocks and side plate cools conductor external to winding pack, same design as TRC Side Plate

NCSX 11 Field errors with TRC style leads Analysis by A. Brooks (11/04) indicates need to reverse coax for Type-A and –B from that shown Type-B is the largest contributor; it can be reversed alone if necessary A B C

NCSX 12 New leads filament model Coax Original Revised Coax A. Brooks 6/2/05

NCSX 13 Goal: ds < 1% Total Flux Results shown for worse 3/5 mode with plasma equilibrium at 179 KA, full beta Other Modular Coil current distributions may produce larger islands Revised Design Reduces Total Resonant Field Error Individual Contributions from A & C Increased A. Brooks 6/2/05 Field error analysis

NCSX 14 Leads terminal assembly

NCSX 15 Clearance check with TRC geometry Analysis by M. Cole (2/05) gives ~.25-in interference between leads and TF structure when increased height of base block is considered Type-A needs to be reversed for coax attachment, consistent with error field analysis A

NCSX 16 Clearance with new design is improved Flange Boundary TF Clearance Envelope 0.75”

NCSX 17 Plan to complete lead blocks, terminal Order long lead G11-CR blank material –Revised blank dimensions issued 5/18 Develop models/drawings of lower lead blocks –Drawings of Side-B combined block are ready to promote, complete by 6/8 –Drawings of Side-A combined block in progress, complete by 6/8 Develop models/drawings of remaining lead blocks –Models complete, drawings in progress, complete by 6/10 Create STL model of lead block asm, incl MCWF –Ready for quote, order by 6/10, est receive all parts by 6/24 Evaluate current filaments for field errors, all coils –Update geometry for actual Type-A, -B filaments, by 6/8 Develop models/drawings of lead terminal parts and asm –Drawings ready to promote except SE142C-050 (asm) –Template plate model/drawing in progress, complete by 6/10 –Evaluate material selection for cable connector, SE142C-059 Revise MCWF machining in leads area –Drawing revision complete except for ECN, complete by 6/8

NCSX 18 Conclusion Does the lead block design meet requirements (EM, elec, therm, struct, fab)? –Revised design improves conductor bend radius and ability to wind coil, leading to a more accurate and repeatable assembly Are the lower lead blocks and terminals ready for fabrication (C1)? –Lower lead block drawings to be promoted by 6/7 –Terminal parts and assembly (w/ minor corrections) ready for sign-off What is the procurement plan for C2-C6, A, B? –NC machining will require all lead blocks to be outside procurement –Terminal parts could be made in-house What issues remain for Type-C? How to solve? –Chill plate and cladding assembly drawings What is status/schedule for comprehensive FDR documentation? –Review is scheduled for Jun-29