Clash Cleanup and Cutout Implementation Dennis Wright ATLAS Muon Week 9 June 2008.

Slides:



Advertisements
Similar presentations
parity bit is 1: data should have an odd number of 1's
Advertisements

SOFTWARE TESTING. INTRODUCTION  Software Testing is the process of executing a program or system with the intent of finding errors.  It involves any.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
ACAT05 - DESY Zeuthen125/05/2005 Detector Description of the ATLAS Muon Spectrometer and H8 Muon Testbeam D. Pomarède CEA/DAPNIA/SEDI/LILAS - Saclay.
MECHANICAL DRAWING MULTIVIEW DRAWINGS.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
12/06/2008Muon Week - CERN1 Muon Detector Description status and plans summary of contributions from Laurent Chevalier, Andrea Dell’Acqua, Jean Francois.
Muon Spectrometer Nomenclature Kevin Black/Vivek Jain/Stephane Willocq went through various documents and produced what we think are the correct names.
1 Round 6 Technology CAD / CAM. 2 Passport Photo Frame Drawing Area Draw / Edit Toolbox Drawing Aids Toolbox Position, Size and Direction Information.
Copyright © Texas Education Agency, All rights reserved.
Detector  Basically the NOvA detector. Planes of plastic tubes filled with liquid scintillator. Fully active: Good for electron identification Total mass:
Copyright © Cengage Learning. All rights reserved. CHAPTER 2 THE LOGIC OF COMPOUND STATEMENTS THE LOGIC OF COMPOUND STATEMENTS.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Spreadsheets in Finance and Forecasting Presentation 11 Visual Basic.
TECH 104 – Technical Graphics Communication Week 13: 3D Modeling Basics.
14 August Magnetic Field in the ATLAS Muon Spectrometer Masahiro Morii for the ATLAS Group Harvard University Laboratory for Particle Physics and.
28/05/2008Muon Combined Performance Meeting 1 Muon Detector Description and Simulation status and plans summary of contributions from Laurent Chevalier,
> 1 Diagrams in Word Faculty of Health Alan Grace.
Muon Spectrometer Detector Description Outline: - Present situation - Missing elements - New chain to update parameters - Alignment issues - GeoModel issues.
Roof Types, Components & Terminology
Particle to MC truth association Juan Palacios (Nikhef) LHCb software week June
1.To begin click: File, New, then select Design 2.Draw a circle, then use the dimension tool to set it’s size to 84 diameter or 42 radius. 3. Next draw.
Muon-raying the ATLAS Detector
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Drawing Abilities Teacher
14/11/2007CERN - Muon Week1 Detector Description status and plans Laurent Chevalier Dapnia – Saclay Stefania Spagnolo Univ. del Salento and INFN Lecce.
Updated on: September 4, 2010 CIS67 Foundations for Creating Web Pages Professor Al Fichera.
1 MuonGeoModel status report focus on issues relevant to , 20 Access to Condition DB with M. Verducci, R. Harrington MDT deformations with I. Logashenco.
Use Flowchart modeling to design and create an interactive quiz to be run on Powerpoint. Start Question Click to start the quiz Correct Incorrect, try.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Software Engineering Saeed Akhtar The University of Lahore.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
SOFTWARE TESTING. Introduction Software Testing is the process of executing a program or system with the intent of finding errors. It involves any activity.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
30/09/081 Muon Spectrometer Detector Description Outline: - Present situation - Dead Matter - Validation - GeoModel.. Laurent Chevalier, Andrea Dell’Acqua,
12/06/2008Muon Week - CERN1 Muon Detector Description status and plans summary of contributions from Laurent Chevalier, Andrea Dell’Acqua, Jean Francois.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
"Cryptex Style" Maze Coin Puzzle
Statistics Unit Test Review Chapters 11 & /11-2 Mean(average): the sum of the data divided by the number of pieces of data Median: the value appearing.
DESIGNING CLASSES. SPECIFICATIONS FOR THE CAR CLASS Professional programmers carefully design the classes they need before any coding is done. With well-
Properties of Transformations. Translate Figures and Use Vectors Translation: moves every point of a figure the same distance in the same direction Image:
TECH 104 – Technical Graphics Communication Week 12: 3D Modeling Basics.
Washer and Dryer Compatible Steamer By: Corey Frazier, Isaac Blackman, Adam Harbeson, and Jon Goley.
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
Review of Open Problem Reports
Software Testing.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
What you are going to learn:
Statistics Unit Test Review
Lecture 11: Scheduling, Estimation, and Prioritization
Step-by-step assembly instructions
Muon Spectrometer Detector Description
CHOPPY SENTENCES.
Step-by-step assembly instructions
LESSON 13 – INTRO TO ARRAYS
Additive and Subtractive Solid Modeling
Update primary numbers active part
Project 2018 October 31, 2018.
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
MuonGeoModel – recent developments
Mdt example now: MdtReadoutElement = 1 multilayer
Copyright © Cengage Learning. All rights reserved.
parity bit is 1: data should have an odd number of 1's
Presentation transcript:

Clash Cleanup and Cutout Implementation Dennis Wright ATLAS Muon Week 9 June 2008

Outline ● Clashes removed since April – toroid feet – fine-clash flag – barrel chambers ● Cutout implementation – chambers with MDTs – method of implementation – ongoing problems 2

Clashes removed since April ● FeetToroidBuilderRDB.cxx: – fixed incorrect z placement of vertical feet plates – were too close together causing clash with BOG cutout chambers – now have agreement with Oracle and amdb ● Fine-clash flag – earlier fix to remove clashes between chamber envelopes was seen to cause big slowdown in reconstruction code (Thomas Kittelmann) – due to the addition of tubes to chamber mother volume – flag added to turn off this fix for reconstruction (Stefania) – switch from tubes to boxes will help a little 3

Clashes removed since April ● Spacer beams (LB, CRO, CMI, CHV) – some cross beams were too long to fit inside cutout BOG chambers ● protruding daughter volume – long beams (LB) were too short ● did not extend past CHV and CRO – no holes in cross beams to accommodate LB's ● also no way to communicate hole location to cross beam construction methods – construction of beam geometry seemed unnecessarily complex ● I-shaped mother volume constructed which was then filled with several pieces 4

Clashes removed since April ● Spacer beam fixes – code added to MuonChamber.cxx to get correct cross beam position and location within BOG – used AMDB values for long beams lengths and added holes in all cross beams ● new class written, CbmComponent, to hold LB hole positions and transmit them to cross beam construction ● DBReader.h modified to include new component class – construction of beam geometry now done by simple subtraction of two side boxes from central box ● many fewer volumes now 5

Cutout Implementation ● Cutouts now implemented for all chambers with MDTs ● Method: – use GeoCutVolAction for RPCs and DEDs ● class propagates cutouts in mother volume down to all daughters ● OK for above components because there aren't many sub- volumes – must handle MDTs differently to avoid creating too many boolean volumes ● re-write Mdt.cxx and parts of MultiLayer.cxx in order to generalize MDT cutouts to other cutout chambers besides BOGs ● Testing of cutouts in progress – improvements in AMDB required in order to continue 6

Cutout Implementation ● Ongoing problems: – visual cutouts ● apparently two types of cutouts used, visual and detailed ● some redundancy between the two ● can we make one type of cutout serve both needs? – CSCs with cutouts ● not yet looked at – AMDB improvements required ● testing of cutouts has revealed problems with how they are described in AMDB ● many cutouts seem to occur outside the volume of their respective component ● some cutouts appear in AMBD where none seem to be needed 7