Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

ATLAS Module building at Glasgow
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
1 Module and stave interconnect Rev. sept. 29/08.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
1 Arduino Board: Arduino UNO Arduino Programing Environment: Arduino 0022
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
GeneXpert Installation and Xpert MTB/RIF Set-up
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Embedded Programming and Robotics
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
Getting Started With the Arduino Uno
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
SIDE SCAN HARDWARE CONFIGURATION
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Berkeley status Aug 10th, 2012.
Santiago in DEPFET for SUPERBELLE
LKr status R. Fantechi.
→ need to guide UV light into gap; also beware temp effects
Injectors BLM system: PS Ring installation at EYETS
ITK Strip Module Meeting; 12st October 2015
22/06/2016 Andy Blue & Maeve Conway (Ohio State)
ATLAS ITK WP3 WP3 Bi-weekly meeting
Visual Instructions.
UCSB Testing Status Anthony Affolder
McCrometer Nano Board Test Procedure
Computer Repair & Maintenance
ESD Procedures for the Electronics Industry
Setup for testing LHCb Inner Tracker Modules
Prototyping with Micro-controllers, Sensors, and Materials
Presentation transcript:

Andy Blue Glasgow Update

Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being installed in following 2 weeks Testbeams –Recon software, & Organising workshop (DESY) Strips DCS –Control via SCTDAQ of HV & LV Temperature Interlock Patterned ASICs –Planning of wire bond trials

Andy Blue WP3 Meeting Cleanroom We have a class 10k cleanroom –Signed off as class 1k Contains –Dicing saw –2 Probers –2 wire bonders We also have a “semi-clean” room –Contains Module/Gluing Assembly In 3 Laminar Air Flow Cabinets –HSIO setup –Glue robot –Pick & Place machine –Metrology System

Andy Blue WP3 Meeting ESD Very wary of having procedures in place for ESD protection for module assembly and testing –For both rooms –For all parts of the build and assembly process There is no point in having ESD floors if other ESD procedures are not carri ed through with –Much like cleanliness

Andy Blue WP3 Meeting ESD Grounding Wrist Strap Attaches to wrist of user Our system is 1 wrist strap / cleanroom user And not 1 /station Each user is responsible for their own wrist strap

Andy Blue WP3 Meeting ESD protection for Tables Attached to tables in clean room Allows connection to wristband via cord to ground Allows you to adapt tables to be grounded

Andy Blue WP3 Meeting Wristband/Heel Grounder Test Station Attached to wall of clean room Allows you to test the wristband and footwear for ESD protection

Andy Blue WP3 Meeting ESD Floor tester Can check that ESD floors are properly bonded to earth –Calibrated to 200 Mega Ohms Dynamic –User (wearing ESD footwear) walks on floor Static –A weight is applied to the floor and directly tested

Andy Blue WP3 Meeting Using the Floor Tester Dynamic (i.e. Shoes work)Static (i.e. Floor works)

Andy Blue WP3 Meeting Detector Control System To prepare for the 130nm, work, wanted to complete the DCS (detector control system) for testing of hybrids and modules High Voltage: Keithley 2410 Low Voltage: TTi TSX-P Series Fan cooler + LVDS Buffer board: Agilent E364X Cambridge Temperature Interlock Box

Andy Blue WP3 Meeting Temp Interlock box First set up using Arduino software –Serial monitor –Connect Interlock by USB Addressed settings for Hybrid NTCs CommandSetting htl,10All Hybrid NTC's lower temp to 10 deg hth,40All Hybrid NTC's higher temp to 40 deg hne,22 Hybrid NTC's enabled hna,22 samples for averaging filter on Hybrid NTC reading hrn,10Nominal Hybrid NTC Resistance (at Nominal Temperature) is 10 kOhm htn,25Nominal Hybrid Temperature is 25 Deg hbn,3435NTC B parameter is 3435 K

Andy Blue WP3 Meeting Compilation + ROOT Next step is to control via SCTDAQ (ROOT) When compiling sctdaq_HSIO –‘Add Existing project –./sctdaq/interlock/tilokl.vcproj –Compile as usual –Should produce a./sctdaq/interlock/tilockdll__/ folder –Also creates.dll files in./sctdaq/bin From ROOT –Run ‘gSystem.Load(“./sctdaq/bin/tilockdll.dll") –This initiates the TILock class –locker = new TILock("ASRL**::INSTR") –** =number of COM port USB cable is attached to –In my case it was locker = new TILock("ASRL4::INSTR") Began to integrate into RootLogin.C

Andy Blue WP3 Meeting LV + HV High Voltage –Can automate from ROOT (using 2410) Sensor High Voltage Ramping IV scan Plotting of graphs Low Voltage –ABCn250 powering (TTi) 2.5V & 4A –Fan cooler & LVDS buffer card (Agilent) Using Labview

Andy Blue WP3 Meeting As of Today Interlock box switched off HV supply (in reality will be LV) after pt100 attached > 30 o C Wired up interlock box to DC-DC Module to monitor actual hybrids (Test later today)

Andy Blue WP3 Meeting Patterned ASICs Wafer 72 Patterned Glass ASICs Bond pads on all 4 sides

Andy Blue WP3 Meeting Matches ABC130nm chip 34 Bonds 28(or 29) Bonds + 4 for ID

Andy Blue WP3 Meeting Wire bond trials

Andy Blue WP3 Meeting Patterned ASICS

Andy Blue WP3 Meeting Sensor Pads on Glass

Andy Blue WP3 Meeting Wire Bonding – X, Y & Z